12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273747576777879808182838485868788899091929394959697989910010110210310410510610710810911011111211311411511611711811912012112212312412512612712812913013113213313413513613713813914014114214314414514614714814915015115215315415515615715815916016116216316416516616716816917017117217317417517617717817918018118218318418518618718818919019119219319419519619719819920020120220320420520620720820921021121221321421521621721821922022122222322422522622722822923023123223323423523623723823924024124224324424524624724824925025125225325425525625725825926026126226326426526626726826927027127227327427527627727827928028128228328428528628728828929029129229329429529629729829930030130230330430530630730830931031131231331431531631731831932032132232332432532632732832933033133233333433533633733833934034134234334434534634734834935035135235335435535635735835936036136236336436536636736836937037137237337437537637737837938038138238338438538638738838939039139239339439539639739839940040140240340440540640740840941041141241341441541641741841942042142242342442542642742842943043143243343443543643743843944044144244344444544644744844945045145245345445545645745845946046146246346446546646746846947047147247347447547647747847948048148248348448548648748848949049149249349449549649749849950050150250350450550650750850951051151251351451551651751851952052152252352452552652752852953053153253353453553653753853954054154254354454554654754854955055155255355455555655755855956056156256356456556656756856957057157257357457557657757857958058158258358458558658758858959059159259359459559659759859960060160260360460560660760860961061161261361461561661761861962062162262362462562662762862963063163263363463563663763863964064164264364464564664764864965065165265365465565665765865966066166266366466566666766866967067167267367467567667767867968068168268368468568668768868969069169269369469569669769869970070170270370470570670770870971071171271371471571671771871972072172272372472572672772872973073173273373473573673773873974074174274374474574674774874975075175275375475575675775875976076176276376476576676776876977077177277377477577677777877978078178278378478578678778878979079179279379479579679779879980080180280380480580680780880981081181281381481581681781881982082182282382482582682782882983083183283383483583683783883984084184284384484584684784884985085185285385485585685785885986086186286386486586686786886987087187287387487587687787887988088188288388488588688788888989089189289389489589689789889990090190290390490590690790890991091191291391491591691791891992092192292392492592692792892993093193293393493593693793893994094194294394494594694794894995095195295395495595695795895996096196296396496596696796896997097197297397497597697797897998098198298398498598698798898999099199299399499599699799899910001001100210031004100510061007100810091010101110121013101410151016101710181019102010211022102310241025102610271028102910301031103210331034103510361037103810391040104110421043104410451046104710481049105010511052105310541055105610571058105910601061106210631064106510661067106810691070107110721073107410751076107710781079108010811082108310841085108610871088108910901091109210931094109510961097109810991100110111021103110411051106110711081109111011111112111311141115111611171118111911201121112211231124112511261127112811291130113111321133113411351136113711381139114011411142114311441145114611471148114911501151115211531154115511561157115811591160116111621163116411651166116711681169117011711172117311741175117611771178117911801181118211831184118511861187118811891190119111921193119411951196119711981199120012011202120312041205 |
- D:\01Work\1012_DataMiddleware\SourceCode\DataMiddleware\.venv\Scripts\python.exe D:\01Work\1012_DataMiddleware\SourceCode\DataMiddleware\tools\img_spilt\run.py
- 2025-03-10 17:53:55,335 - INFO - 开始处理目录: ./temp_files/images/output/img/02/
- 2025-03-10 17:53:55,335 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_01.png
- 2025-03-10 17:53:55,335 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_01.png
- 2025-03-10 17:54:34,308 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1","c":"机械挖土方 基坑深≤4m 无水","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":50.07,"h":0,"i":18.65,"j":0.09,"k":31.33,"l":""},{"a":"QY_2024","b":"QY-2","c":"机械挖土方 基坑深≤4m 有水","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":55.16,"h":0,"i":18.65,"j":0.1,"k":36.41,"l":""},{"a":"QY_2024","b":"QY-3","c":"机械挖土方 基坑深≤6m 无水","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":81.71,"h":0,"i":19.84,"j":0.09,"k":61.78,"l":""},{"a":"QY_2024","b":"QY-4","c":"机械挖土方 基坑深≤6m 有水无挡","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":97.99,"h":0,"i":19.84,"j":0.1,"k":78.05,"l":""},{"a":"QY_2024","b":"QY-5","c":"机械挖土方 基坑深≤6m 有水有挡","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":110.69,"h":0,"i":19.84,"j":0.1,"k":90.75,"l":""}]
- 2025-03-10 17:54:34,438 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_01.png
- 2025-03-10 17:54:34,439 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_02.png
- 2025-03-10 17:54:34,439 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_02.png
- 2025-03-10 17:55:33,191 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-6","c":"机械挖淤泥","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":60.34,"h":0,"i":8.5,"j":0.19,"k":51.65,"l":""},{"a":"QY_2024","b":"QY-7","c":"机械挖流砂","d":"挖、运至基坑外10m,包括近坑底0.3m以内的土方人工挖运,坑壁及坑底修整。","e":"10m³","f":"","g":69.61,"h":0,"i":10.14,"j":0.19,"k":59.28,"l":""},{"a":"QY_2024","b":"QY-8","c":"人力挖土方 基坑深(m) ≤1.5 无水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m³","f":"","g":207.17,"h":0,"i":206.91,"j":0.26,"k":0,"l":""},{"a":"QY_2024","b":"QY-9","c":"人力挖土方 基坑深(m) ≤1.5 有水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m³","f":"","g":345.61,"h":0,"i":345.35,"j":0.26,"k":0,"l":""},{"a":"QY_2024","b":"QY-10","c":"人力挖土方 基坑深(m) ≤3 无水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m³","f":"","g":262.66,"h":0,"i":261.81,"j":0.85,"k":0,"l":""}]
- 2025-03-10 17:55:33,266 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_02.png
- 2025-03-10 17:55:33,266 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_03.png
- 2025-03-10 17:55:33,266 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_03.png
- 2025-03-10 17:56:18,345 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-11","c":"人力挖土方基坑深(m)≤3有水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m³","f":"","g":373.65,"h":0,"i":372.8,"j":0.85,"k":0,"l":""},{"a":"QY_2024","b":"QY-12","c":"人力挖土方基坑深(m)≤6无水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外11m,修整边坡及坑底面。","e":"10m³","f":"","g":380.96,"h":0,"i":380.11,"j":0.85,"k":0,"l":""},{"a":"QY_2024","b":"QY-13","c":"人力挖土方基坑深(m)≤6有水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外12m,修整边坡及坑底面。","e":"10m³","f":"","g":595.63,"h":0,"i":594.78,"j":0.85,"k":0,"l":""},{"a":"QY_2024","b":"QY-14","c":"人力挖土方基坑深(m)≤9无水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外13m,修整边坡及坑底面。","e":"10m³","f":"","g":356.56,"h":0,"i":290.45,"j":2.03,"k":64.08,"l":""},{"a":"QY_2024","b":"QY-15","c":"人力挖土方基坑深(m)≤9有水","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外14m,修整边坡及坑底面。","e":"10m³","f":"","g":586,"h":0,"i":519.89,"j":2.03,"k":64.08,"l":""}]
- 2025-03-10 17:56:18,447 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_03.png
- 2025-03-10 17:56:18,447 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_04.png
- 2025-03-10 17:56:18,447 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_04.png
- 2025-03-10 17:56:56,202 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-16","c":"人力挖淤泥","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m3","f":"","g":544.2,"h":0,"i":539.73,"j":4.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-17","c":"人力挖流砂","d":"搭拆脚手架,铺设平台、跳板,人工挖装、吊运至坑口外10m,修整边坡及坑底面。","e":"10m3","f":"","g":615.36,"h":0,"i":610.89,"j":4.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-18","c":"爆破开挖石质基坑 基坑深≤3m 无水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":660.97,"h":0.001,"i":480.21,"j":85.24,"k":95.52,"l":""},{"a":"QY_2024","b":"QY-19","c":"爆破开挖石质基坑 基坑深≤3m 有水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":829.25,"h":0.001,"i":648.49,"j":85.24,"k":95.52,"l":""},{"a":"QY_2024","b":"QY-20","c":"爆破开挖石质基坑 基坑深≤6m 无水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":716.46,"h":0.002,"i":521.68,"j":94.3,"k":100.48,"l":""}]
- 2025-03-10 17:56:56,287 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_04.png
- 2025-03-10 17:56:56,287 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_05.png
- 2025-03-10 17:56:56,287 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_05.png
- 2025-03-10 17:58:00,205 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-21","c":"爆破开挖石质基坑 基坑深≤6m 有水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":899.36,"h":0.002,"i":704.58,"j":94.3,"k":100.48,"l":""},{"a":"QY_2024","b":"QY-22","c":"爆破开挖石质基坑 基坑深≤9m 无水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":835.86,"h":0.002,"i":625.06,"j":94.3,"k":116.5,"l":""},{"a":"QY_2024","b":"QY-23","c":"爆破开挖石质基坑 基坑深≤9m 有水","d":"钻眼、爆破、装石、清理、机械吊运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":898.52,"h":0.002,"i":687.72,"j":94.3,"k":116.5,"l":""},{"a":"QY_2024","b":"QY-24","c":"爆破开挖石质基坑 基坑深≤6m 无水","d":"跳板或扒杆安拆,气镐凿石方,装运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":1407.81,"h":0,"i":1113.18,"j":39.99,"k":254.64,"l":""},{"a":"QY_2024","b":"QY-25","c":"爆破开挖石质基坑 基坑深≤6m 有水","d":"跳板或扒杆安拆,气镐凿石方,装运至坑口外10m,整理坑壁及坑底面。","e":"10m3","f":"","g":1542.84,"h":0,"i":1209.25,"j":39.99,"k":293.6,"l":""}]
- 2025-03-10 17:58:00,258 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_05.png
- 2025-03-10 17:58:00,258 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_06.png
- 2025-03-10 17:58:00,258 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_06.png
- 2025-03-10 17:58:44,577 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-26","c":"挡土板无水","d":"脚手架搭拆、人工夯打挡土桩、挡土板制安拆。","e":"10m3±","f":"","g":181.35,"h":0.047,"i":72.35,"j":109,"k":0,"l":""},{"a":"QY_2024","b":"QY-27","c":"挡土板有水","d":"脚手架搭拆、人工夯打挡土桩、挡土板制安拆。","e":"10m3±","f":"","g":221.18,"h":0.047,"i":112.18,"j":109,"k":0,"l":""},{"a":"QY_2024","b":"QY-28","c":"钢筋混凝土围圈混凝土","d":"模板制安拆、混凝土浇筑、振捣及养护、刃脚制安。","e":"10m3","f":"HT-0(10.200);","g":1928.7,"h":0.068,"i":1392.45,"j":291.05,"k":245.2,"l":""},{"a":"QY_2024","b":"QY-29","c":"钢筋混凝土围圈钢筋","d":"制作、绑扎、安装、定位、校正。","e":"t","f":"4332.62","g":1.033,"h":593.44,"i":3610.38,"j":128.8,"k":"","l":""},{"a":"QY_2024","b":"QY-30","c":"钢板桩支护无水","d":"导向架制安拆、钢板桩检验、整修、吊桩、打桩、校正、拔桩、堆码解体存放。","e":"t","f":"","g":1012.6,"h":0.104,"i":423.67,"j":270.13,"k":318.8,"l":""}]
- 2025-03-10 17:58:44,628 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 17:58:44,657 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_06.png
- 2025-03-10 17:58:44,657 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_07.png
- 2025-03-10 17:58:44,657 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_07.png
- 2025-03-10 17:59:49,934 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-31","c":"井管安拆","d":"挖地面排水沟及总管槽、钻孔、沉井管、铺总管;抽水设备安拆、保养,连接试抽,拔井管,拆管、清洗,整理堆放。","e":"10根","f":"","g":1445.48,"h":3.514,"i":603.43,"j":184.96,"k":657.09,"l":""},{"a":"QY_2024","b":"QY-32","c":"井点降水","d":"抽水、堵漏。","e":"套天","f":"","g":812.78,"h":0.003,"i":194.98,"j":13.19,"k":604.61,"l":""},{"a":"QY_2024","b":"QY-33","c":"无砂混凝土管井 管径≤500","d":"成孔、沉管、填充井壁外滤水材料及还土,做井圈。","e":"10m","f":"","g":2652.25,"h":3.565,"i":921.34,"j":927.37,"k":803.54,"l":""},{"a":"QY_2024","b":"QY-34","c":"无砂混凝土管井 管径≤600","d":"成孔、沉管、填充井壁外滤水材料及还土,做井圈。","e":"10m","f":"","g":3251.31,"h":4.115,"i":1138.24,"j":1129.89,"k":983.18,"l":""},{"a":"QY_2024","b":"QY-35","c":"基坑抽水 弱水流≤15m³/h","d":"挖抽水坑、抽水、排水沟开挖。","e":"10m³湿土","f":"","g":53.56,"h":0,"i":39.98,"j":0,"k":13.58,"l":""}]
- 2025-03-10 17:59:49,992 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_07.png
- 2025-03-10 17:59:49,992 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_08.png
- 2025-03-10 17:59:49,992 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_08.png
- 2025-03-10 18:00:12,298 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-36","c":"基坑抽水中水流≤40m3/h","d":"挖抽水坑、抽水、排水沟开挖。","e":"中水流≤4...","f":"","g":87.76,"h":0,"i":40.28,"j":0,"k":47.48,"l":""},{"a":"QY_2024","b":"QY-37","c":"基坑抽水强水流≤60m3/h","d":"挖抽水坑、抽水、排水沟开挖。","e":"强水流≥4...","f":"","g":103.54,"h":0,"i":40.43,"j":0,"k":63.11,"l":""},{"a":"QY_2024","b":"QY-38","c":"基坑抽水抽静水","d":"挖抽水坑、抽水、排水沟开挖。","e":"10m3","f":"","g":8.7,"h":0,"i":8.06,"j":0,"k":0.64,"l":""},{"a":"QY_2024","b":"QY-39","c":"基坑回填原土","d":"机械挖土、填土、人工平整、夯实。","e":"10m3","f":"","g":140.8,"h":0,"i":87.27,"j":1.03,"k":52.5,"l":""},{"a":"QY_2024","b":"QY-40","c":"基坑回填浆砌片石M5","d":"挂线、找平、选石、修石、洗石、砂浆拌制、铺浆、砌筑、填缝、搭拆脚手板。","e":"10m3","f":"HT-907(3.300);","g":1870.57,"h":27.448,"i":761.71,"j":1091.39,"k":17.47,"l":""}]
- 2025-03-10 18:00:12,366 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_08.png
- 2025-03-10 18:00:12,366 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_09.png
- 2025-03-10 18:00:12,366 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_09.png
- 2025-03-10 18:00:39,968 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-41","c":"基坑回填 浆砌片石M10","d":"挂线、找平,选石、修石、洗石,砂浆拌制、铺浆、砌筑、填缝,搭拆脚手板。","e":"10m3","f":"HT-915(3.300);","g":1910.09,"h":27.442,"i":761.71,"j":1130.91,"k":17.47,"l":""},{"a":"QY_2024","b":"QY-42","c":"基坑回填 碎石","d":"装运碎石、平整、夯实。","e":"10m3","f":"","g":1146.99,"h":16.815,"i":320.59,"j":826.4,"k":0,"l":""},{"a":"QY_2024","b":"QY-43","c":"基坑回填 混凝土","d":"浇筑、捣固、养护。","e":"10m3","f":"HT-0(10.200);","g":157.32,"h":0,"i":155.74,"j":1.58,"k":0,"l":""},{"a":"QY_2024","b":"QY-44","c":"土坝围堰 填筑","d":"挖、装、运土20m,卸土,分层填筑、拆除。","e":"10m3","f":"","g":197.07,"h":0,"i":197.07,"j":0,"k":0,"l":""},{"a":"QY_2024","b":"QY-45","c":"土坝围堰 拆除","d":"挖、装、运土21m,卸土,分层填筑、拆除。","e":"10m3","f":"","g":180.81,"h":0,"i":180.81,"j":0,"k":0,"l":""}]
- 2025-03-10 18:00:40,053 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_09.png
- 2025-03-10 18:00:40,054 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_10.png
- 2025-03-10 18:00:40,054 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_10.png
- 2025-03-10 18:01:02,073 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-46","c":"塑料编织袋围堰填筑","d":"挖土,人工装袋、运20m,砌筑、塞缝、分层捣实,拆除,清理。","e":"10m3","f":"","g":576.72,"h":0,"i":273,"j":281.7,"k":22.02,"l":""},{"a":"QY_2024","b":"QY-47","c":"塑料编织袋围堰拆除","d":"挖土,人工装袋、运21m,砌筑、塞缝、分层捣实,拆除,清理。","e":"10m3","f":"","g":242.57,"h":0,"i":242.57,"j":0,"k":0,"l":""},{"a":"QY_2024","b":"QY-48","c":"筑岛填心","d":"挖运20m,分层填筑、夯实及拆除。","e":"10m3","f":"","g":125.11,"h":0,"i":29.84,"j":0,"k":95.27,"l":""},{"a":"QY_2024","b":"QY-49","c":"打钢板桩 陆上","d":"导架制安拆,钢板桩检验、整修、吊桩、打桩、校正。","e":"t","f":"","g":790.64,"h":0.104,"i":296.87,"j":306.37,"k":187.4,"l":""},{"a":"QY_2024","b":"QY-50","c":"打钢板桩 水上","d":"导架制安拆,钢板桩检验、整修、下河、移船定位、吊桩、打桩、校正。","e":"t","f":"","g":1515.08,"h":0.074,"i":400.25,"j":233.29,"k":881.54,"l":""}]
- 2025-03-10 18:01:02,130 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_10.png
- 2025-03-10 18:01:02,130 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_11.png
- 2025-03-10 18:01:02,130 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_11.png
- 2025-03-10 18:01:49,598 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-51","c":"拔钢板桩陆上","d":"拔桩、堆码解体存放。","e":"t","f":"","g":296.09,"h":0.003,"i":141.57,"j":17.81,"k":136.71,"l":""},{"a":"QY_2024","b":"QY-52","c":"拔钢板桩水上","d":"拔钢板桩:拔桩、起重船移位、吊放在驳船上、堆码解体存放。","e":"t","f":"","g":637.1,"h":0.003,"i":193.19,"j":17.3,"k":426.61,"l":""},{"a":"QY_2024","b":"QY-53","c":"内支撑制安拆陆上","d":"铺拆临时脚手架、杆件制作、安装、拆除。","e":"单层10m2","f":"","g":1872.68,"h":0.194,"i":623.27,"j":859.35,"k":390.06,"l":""},{"a":"QY_2024","b":"QY-54","c":"内支撑制安拆水上","d":"铺拆临时脚手架、杆件制作、安装、拆除。","e":"单层10m2","f":"","g":2203.13,"h":0.189,"i":653.26,"j":839.16,"k":710.71,"l":""},{"a":"QY_2024","b":"QY-55","c":"钢模板围堰内封底混凝土","d":"下河、安装拼接、脚手搭拆、刃脚压浆、灌水试验、抽水堵漏。","e":"10m3","f":"HT-0(10.200):","g":3423.48,"h":0,"i":510.94,"j":12.65,"k":2899.89,"l":""}]
- 2025-03-10 18:01:49,682 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_11.png
- 2025-03-10 18:01:49,682 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_12.png
- 2025-03-10 18:01:49,682 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_12.png
- 2025-03-10 18:02:34,730 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-56","c":"钢板桩每使用1个季度","d":"每使用1个季度摊销。","e":"t","f":"","g":162.19,"h":0.04,"i":0,"j":162.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-57","c":"双壁钢围堰拼装","d":"下河、安装拼接、脚手搭拆、刃脚压浆、灌水试验、抽水堵漏。","e":"t","f":"","g":4236.44,"h":0.072,"i":1202.99,"j":184.9,"k":2848.55,"l":""},{"a":"QY_2024","b":"QY-58","c":"拼装船组拼拆除","d":"杆件制安拆、船舶加固、脚手架搭拆。","e":"次","f":"","g":91813.8,"h":11.384,"i":22339.71,"j":30782.63,"k":39619.31,"l":""},{"a":"QY_2024","b":"QY-59","c":"下沉设备制安拆","d":"起吊塔架及辅助吊架制安拆。","e":"1个墩","f":"","g":176020.047,"h":13.048,"i":94022.63,"j":62428.63,"k":19558.79,"l":""},{"a":"QY_2024","b":"QY-60","c":"双壁钢围堰、钢沉井底节浮运、定位、下水","d":"浮运至墩位定位、起吊下水。","e":"t","f":"","g":3498.74,"h":0,"i":1246.7,"j":35.76,"k":2216.28,"l":""}]
- 2025-03-10 18:02:34,814 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_12.png
- 2025-03-10 18:02:34,814 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_13.png
- 2025-03-10 18:02:34,814 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_13.png
- 2025-03-10 18:03:04,425 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-61","c":"双壁钢围堰下沉,水中","d":"定位船至围堰拉缆安拆、安拆导向设备、清理导向船,围堰接高、下沉。","e":"100m3","f":"","g":15165.46,"h":0.087,"i":7083.07,"j":382.96,"k":7699.43,"l":""},{"a":"QY_2024","b":"QY-62","c":"双壁钢围堰下沉,覆盖层","d":"围堰接高、吸泥出土、补水、校正沉井倾斜。","e":"100m3","f":"","g":24586.98,"h":0,"i":2317.21,"j":89.45,"k":22180.32,"l":""},{"a":"QY_2024","b":"QY-63","c":"双壁钢围堰基底清理","d":"拉缆风,补水、射水吸泥,清底,测量,潜水检查,脚手架制安拆。","e":"10m2","f":"","g":5121.09,"h":0.029,"i":289.11,"j":96.66,"k":4735.32,"l":""},{"a":"QY_2024","b":"QY-64","c":"双壁钢围堰(浮运钢沉井)壁内填充及封底混凝土","d":"混凝土浇筑。","e":"100m3","f":"HT-0(10.200);","g":976.57,"h":0,"i":641.92,"j":1.14,"k":333.51,"l":""},{"a":"QY_2024","b":"QY-65","c":"双壁钢围堰下沉,钢围堰拆除","d":"水下切割、起吊拆除。","e":"t","f":"","g":2062.09,"h":0,"i":561.07,"j":39.97,"k":1461.05,"l":""}]
- 2025-03-10 18:03:04,481 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_13.png
- 2025-03-10 18:03:04,482 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_14.png
- 2025-03-10 18:03:04,482 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_14.png
- 2025-03-10 18:03:32,233 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-66","c":"双壁钢围堰下沉,钢围堰(含沉井)内抽水","d":"堵漏、抽水、移动水泵。","e":"100m3","f":"","g":146.56,"h":0,"i":48.63,"j":0,"k":97.93,"l":""},{"a":"QY_2024","b":"QY-67","c":"吊箱围堰拼装","d":"下河、安装拼接、脚手架搭拆。","e":"t","f":"","g":6369.57,"h":0.419,"i":1603.24,"j":2258.26,"k":2508.07,"l":""},{"a":"QY_2024","b":"QY-68","c":"吊箱围堰浮运、定位、下水","d":"浮运至墩位定位,起吊下水。","e":"t","f":"","g":3937.95,"h":0,"i":1386.33,"j":22.51,"k":2529.11,"l":""},{"a":"QY_2024","b":"QY-69","c":"浮箱组拼、拆除","d":"浮箱组拼、拆除,下河及上岸。","e":"只","f":"","g":528.89,"h":0.006,"i":441.27,"j":19.16,"k":68.46,"l":""},{"a":"QY_2024","b":"QY-70","c":"大型钢围堰底节拼装","d":"钢箍安拆、脚手架搭拆、围堰拼装、注水试验、抽水堵漏。","e":"t","f":"","g":3373.61,"h":0.036,"i":1281.61,"j":357.04,"k":1734.96,"l":""}]
- 2025-03-10 18:03:32,307 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_14.png
- 2025-03-10 18:03:32,307 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_15.png
- 2025-03-10 18:03:32,307 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_15.png
- 2025-03-10 18:04:02,477 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-71","c":"大型钢围堰底节下河","d":"地垄及后拉揽安拆,气囊布置及充气,钢围堰起滑、下水、自浮,拖轮绑定钢围堰,钢围堰临时锚碇、检修。","e":"t","f":"","g":1188.45,"h":0.003,"i":295.53,"j":344.33,"k":548.59,"l":""},{"a":"QY_2024","b":"QY-72","c":"大型钢围堰底节浮运、定位","d":"浮运缆绳准备、拖轮系统、浮运至墩位处、拖轮解缆,锚绳调整、初步定位、调整锚绳、拉缆、精确定位、形成静定平台。","e":"t","f":"","g":2342.82,"h":0.038,"i":732.92,"j":473.99,"k":1135.91,"l":""},{"a":"QY_2024","b":"QY-73","c":"大型钢围堰水中下沉","d":"钢围堰底节整体下沉准备:提升装置安装、围堰内清理、护筒接高、拆除部分伸缩梁、围堰内水位调整;钢围堰整节下沉:水下拆除围堰与护筒的钢垫块...","e":"100m³","f":"","g":19033.05,"h":0.014,"i":6951.34,"j":2017.99,"k":10063.72,"l":""},{"a":"QY_2024","b":"QY-74","c":"大型钢围堰中上节拼装","d":"单元件围堰面板下河运输、现场拼装焊接、内支撑焊接、围堰内外梯子通道接高等工序。","e":"t","f":"","g":6258.07,"h":0.014,"i":1286.53,"j":210.83,"k":4760.71,"l":""},{"a":"QY_2024","b":"QY-75","c":"定位船舶面设备 大型钢围堰","d":"固定座、将军柱、马口装拆、穿折滑车组、片石压舱、起航及铺拆。","e":"艘","f":"","g":325585.063,"h":19.892,"i":34817.12,"j":34949.48,"k":255618.1,"l":""}]
- 2025-03-10 18:04:02,531 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_15.png
- 2025-03-10 18:04:02,531 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_16.png
- 2025-03-10 18:04:02,531 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_16.png
- 2025-03-10 18:04:36,114 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-76","c":"定位船舱面设备双壁钢围堰","d":"固定座,将军柱、马口装拆,穿拆滑车组,片石压舱、起舱及铺拆。","e":"艘","f":"","g":183727.422,"h":20.892,"i":36144.08,"j":22303.22,"k":125280.0,"l":""},{"a":"QY_2024","b":"QY-77","c":"导向船舱面设备","d":"固定座,将军柱、马口装拆,穿拆滑车组,片石压舱、起舱及吊梁等制安拆。","e":"墩","f":"","g":341366.9,"h":34.085,"i":44592.29,"j":30029.74,"k":266744.0,"l":""},{"a":"QY_2024","b":"QY-78","c":"联接梁钢结构","d":"联接梁钢结构、脚手板制安拆。","e":"10t","f":"","g":40370.45,"h":2.988,"i":12503.97,"j":12108.1,"k":15758.39,"l":""},{"a":"QY_2024","b":"QY-79","c":"主锚有定位船铁锚(8t)","d":"锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳、起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":32334.41,"h":0,"i":2003.34,"j":23782.21,"k":6548.86,"l":""},{"a":"QY_2024","b":"QY-80","c":"主锚有定位船铁锚(5t)","d":"锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳、起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":20256.81,"h":0,"i":5198.62,"j":8990.86,"k":6067.33,"l":""}]
- 2025-03-10 18:04:36,172 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_16.png
- 2025-03-10 18:04:36,172 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_17.png
- 2025-03-10 18:04:36,172 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_17.png
- 2025-03-10 18:05:21,722 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-81","c":"主锚 有定位船 混凝土锚(40t)","d":"混凝土锚制作,全部锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳,起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":52990.72,"h":45.421,"i":10585.66,"j":29630.78,"k":12774.28,"l":""},{"a":"QY_2024","b":"QY-82","c":"主锚 无定位船 铁锚(2.5t)","d":"锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳,起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":13286.71,"h":0,"i":5036.62,"j":3657.57,"k":4572.52,"l":""},{"a":"QY_2024","b":"QY-83","c":"主锚 无定位船 混凝土锚(25t)","d":"混凝土锚制作,全部锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳,起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":30525.5,"h":27.659,"i":8413.75,"j":14231.79,"k":9679.96,"l":""},{"a":"QY_2024","b":"QY-84","c":"边锚 有定位船 铁锚(2.5t)","d":"锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳,起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":17094.36,"h":0,"i":5935.16,"j":6416.52,"k":4732.71,"l":""},{"a":"QY_2024","b":"QY-85","c":"边锚 有定位船 混凝土锚(25t)","d":"混凝土锚制作,全部锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳,起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":34272.59,"h":27.659,"i":9242.45,"j":15169.99,"k":9840.15,"l":""}]
- 2025-03-10 18:05:21,825 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_17.png
- 2025-03-10 18:05:21,825 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_18.png
- 2025-03-10 18:05:21,825 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_18.png
- 2025-03-10 18:06:51,363 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-86","c":"边锚无定位船铁锚(2t)","d":"锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳;起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":13120.91,"h":0,"i":5581.72,"j":3007.1,"k":4532.09,"l":""},{"a":"QY_2024","b":"QY-87","c":"边锚无定位船混凝土锚(15t)","d":"混凝土锚制作,全部锚绳、锚链联结及检查、安装及拆除:抛锚、过锚绳、绞锚绳、起锚、整理锚绳等全部工作。","e":"1个锚","f":"","g":23583.35,"h":16.902,"i":7503.46,"j":7574.64,"k":8505.25,"l":""},{"a":"QY_2024","b":"QY-88","c":"陆上旋挖钻机钻孔桩径(m)≤0.8土层","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻架及钻机,安拆钻杆及钻头;钻进、压泥浆、清理钻渣;清孔。","e":"10m","f":"","g":1789.42,"h":0.351,"i":172,"j":193.52,"k":1423.9,"l":""},{"a":"QY_2024","b":"QY-89","c":"陆上旋挖钻机钻孔桩径(m)≤1.0土层","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻架及钻机,安拆钻杆及钻头;钻进、压泥浆、清理钻渣;清孔。","e":"10m","f":"","g":2397.76,"h":0.514,"i":227.2,"j":281.39,"k":1889.17,"l":""},{"a":"QY_2024","b":"QY-90","c":"陆上旋挖钻机钻孔桩径(m)≤1.25土层","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻架及钻机,安拆钻杆及钻头;钻进、压泥浆、清理钻渣;清孔。","e":"10m","f":"","g":2844.78,"h":0.714,"i":263,"j":362.72,"k":2219.06,"l":""}]
- 2025-03-10 18:06:51,443 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_18.png
- 2025-03-10 18:06:51,443 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_19.png
- 2025-03-10 18:06:51,443 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_19.png
- 2025-03-10 18:08:58,884 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-91","c":"陆上旋挖钻机钻孔桩径(m)≤1.5土层","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻架及钻机,安拆钻杆及钻头:钻进、压泥浆、清理钻渣:清孔。","e":"10m","f":"","g":3492.55,"h":1.032,"i":286.28,"j":494.23,"k":2712.04,"l":""},{"a":"QY_2024","b":"QY-92","c":"陆上旋挖钻机钻孔桩径(m)≤2.0土层","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻架及钻机,安拆钻杆及钻头:钻进、压泥浆、清理钻渣:清孔。","e":"10m","f":"","g":4503.23,"h":1.091,"i":353.26,"j":540.48,"k":3609.49,"l":""},{"a":"QY_2024","b":"QY-93","c":"陆上冲击钻机钻孔桩径(m)≤0.8砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣:清孔。","e":"10m","f":"","g":6131.63,"h":0.336,"i":208.5,"j":3638.74,"k":"","l":""},{"a":"QY_2024","b":"QY-94","c":"陆上冲击钻机钻孔桩径(m)≤1.0砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣:清孔。","e":"10m","f":"","g":8134.75,"h":0.553,"i":2880.96,"j":304.08,"k":4849.71,"l":""},{"a":"QY_2024","b":"QY-95","c":"陆上冲击钻机钻孔桩径(m)≤1.25砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣:清孔。","e":"10m","f":"","g":9167.55,"h":0.719,"i":2919.45,"j":397.57,"k":5850.53,"l":""}]
- 2025-03-10 18:08:58,922 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 18:08:58,929 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_19.png
- 2025-03-10 18:08:58,929 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_20.png
- 2025-03-10 18:08:58,929 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_20.png
- 2025-03-10 18:09:47,441 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-96","c":"陆上冲击钻机钻孔桩径(m)≤1.5砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":11170.03,"h":1.107,"i":3559.14,"j":531.82,"k":7079.07,"l":""},{"a":"QY_2024","b":"QY-97","c":"陆上冲击钻机钻孔桩径(m)≤2.0砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":14566.27,"h":2.077,"i":4861.63,"j":955.07,"k":8749.57,"l":""},{"a":"QY_2024","b":"QY-98","c":"陆上冲击钻机钻孔桩径(m)≤0.8软土","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":11615.22,"h":0.337,"i":4458.39,"j":212.44,"k":6944.39,"l":""},{"a":"QY_2024","b":"QY-99","c":"陆上冲击钻机钻孔桩径(m)≤1.0软土","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":16264.14,"h":0.554,"i":6074.16,"j":308.14,"k":9882.02,"l":""},{"a":"QY_2024","b":"QY-100","c":"陆上冲击钻机钻孔桩径(m)≤1.25软土","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":18410.21,"h":0.72,"i":6117.28,"j":401.63,"k":11891.3,"l":""}]
- 2025-03-10 18:09:47,511 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_20.png
- 2025-03-10 18:09:47,511 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_21.png
- 2025-03-10 18:09:47,511 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_21.png
- 2025-03-10 18:10:37,061 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-101","c":"陆上冲击钻机钻孔桩径(m)≤1.5软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":2179.99,"h":1.108,"i":7532.1,"j":535.88,"k":13712.01,"l":""},{"a":"QY_2024","b":"QY-102","c":"陆上冲击钻机钻孔桩径(m)≤2.0软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":29252.89,"h":2.078,"i":10476.02,"j":972.32,"k":17804.55,"l":""},{"a":"QY_2024","b":"QY-103","c":"陆上冲击钻机钻孔桩径(m)≤0.8卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":15862.0,"h":0.338,"i":6125.93,"j":232.48,"k":9503.91,"l":""},{"a":"QY_2024","b":"QY-104","c":"陆上冲击钻机钻孔桩径(m)≤1.0卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":21892.4,"h":0.555,"i":8255.32,"j":328.88,"k":13298.2,"l":""},{"a":"QY_2024","b":"QY-105","c":"陆上冲击钻机钻孔桩径(m)≤1.25卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":24527.67,"h":0.795,"i":8359.3,"j":421.43,"k":15746.94,"l":""}]
- 2025-03-10 18:10:37,124 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_21.png
- 2025-03-10 18:10:37,124 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_22.png
- 2025-03-10 18:10:37,124 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_22.png
- 2025-03-10 18:11:46,390 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-106","c":"陆上冲击钻机钻孔桩径(m)≤1.5卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣,清孔。","e":"10m","f":"","g":30587.62,"h":1.109,"i":10173.78,"j":552.86,"k":19860.98,"l":""},{"a":"QY_2024","b":"QY-107","c":"陆上冲击钻机钻孔桩径(m)≤2.0卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣,清孔。","e":"10m","f":"","g":36111.26,"h":2.004,"i":13619.69,"j":967.11,"k":21524.46,"l":""},{"a":"QY_2024","b":"QY-108","c":"陆上冲击钻机钻孔桩径(m)≤0.8次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣,清孔。","e":"10m","f":"","g":18961.35,"h":0.339,"i":7299.82,"j":263,"k":11388.53,"l":""},{"a":"QY_2024","b":"QY-109","c":"陆上冲击钻机钻孔桩径(m)≤1.0次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣,清孔。","e":"10m","f":"","g":26053.38,"h":0.556,"i":9876.61,"j":365.36,"k":15811.36,"l":""},{"a":"QY_2024","b":"QY-110","c":"陆上冲击钻机钻孔桩径(m)≤1.25次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣,清孔。","e":"10m","f":"","g":29794.27,"h":0.722,"i":10070.4,"j":460.73,"k":19263.14,"l":""}]
- 2025-03-10 18:11:46,474 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_22.png
- 2025-03-10 18:11:46,474 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_23.png
- 2025-03-10 18:11:46,474 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_23.png
- 2025-03-10 18:12:55,611 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-111","c":"陆上冲击钻机钻孔桩径(m)≤1.5次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":38676.8,"h":1.11,"i":13147.68,"j":604.96,"k":24924.16,"l":""},{"a":"QY_2024","b":"QY-112","c":"陆上冲击钻机钻孔桩径(m)≤2.0次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":44774.68,"h":2.08,"i":16403.24,"j":1122.49,"k":27248.95,"l":""},{"a":"QY_2024","b":"QY-113","c":"陆上冲击钻机钻孔桩径(m)≤0.8坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":32682.19,"h":0.342,"i":12695.24,"j":315.62,"k":19672.4,"l":""},{"a":"QY_2024","b":"QY-114","c":"陆上冲击钻机钻孔桩径(m)≤1.0坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":44552.9,"h":0.559,"i":17100.06,"j":420.68,"k":27032.16,"l":""},{"a":"QY_2024","b":"QY-115","c":"陆上冲击钻机钻孔桩径(m)≤1.25坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":52504.19,"h":0.725,"i":18092.55,"j":521.25,"k":33890.39,"l":""}]
- 2025-03-10 18:12:55,688 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_23.png
- 2025-03-10 18:12:55,688 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_24.png
- 2025-03-10 18:12:55,688 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_24.png
- 2025-03-10 18:14:07,696 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-116","c":"陆上冲击钻机钻孔桩径(m)≤1.5坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":65368.68,"h":1.113,"i":22395.8,"j":671.35,"k":42301.53,"l":""},{"a":"QY_2024","b":"QY-117","c":"陆上冲击钻机钻孔桩径(m)≤2.0坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":76220.96,"h":2.083,"i":28783.54,"j":1218.68,"k":46218.74,"l":""},{"a":"QY_2024","b":"QY-118","c":"陆上回旋钻机钻孔桩径(m)≤0.8砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":4445.09,"h":0.294,"i":249.86,"j":3346.53,"k":"","l":""},{"a":"QY_2024","b":"QY-119","c":"陆上回旋钻机钻孔桩径(m)≤1.0砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":6189.24,"h":0.451,"i":1188.37,"j":307.1,"k":4693.77,"l":""},{"a":"QY_2024","b":"QY-120","c":"陆上回旋钻机钻孔桩径(m)≤1.25砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":7404.55,"h":0.694,"i":1418.7,"j":395.7,"k":5590.15,"l":""}]
- 2025-03-10 18:14:07,746 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 18:14:07,780 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_24.png
- 2025-03-10 18:14:07,781 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_25.png
- 2025-03-10 18:14:07,781 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_25.png
- 2025-03-10 18:15:52,972 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-121","c":"陆上回旋钻机钻孔桩径(m)≤1.50砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":8621.63,"h":1.077,"i":1636.06,"j":535.22,"k":6450.35,"l":""},{"a":"QY_2024","b":"QY-122","c":"陆上回旋钻机钻孔桩径(m)≤2.0砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":11026.17,"h":1.902,"i":1379.62,"j":979.65,"k":8666.9,"l":""},{"a":"QY_2024","b":"QY-123","c":"陆上回旋钻机钻孔桩径(m)≤2.5砂砾石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":15306.65,"h":2.962,"i":1917.11,"j":1370.54,"k":12019,"l":""},{"a":"QY_2024","b":"QY-124","c":"陆上回旋钻机钻孔桩径(m)≤0.8软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":7951.31,"h":0.295,"i":1535.96,"j":296.39,"k":6118.96,"l":""},{"a":"QY_2024","b":"QY-125","c":"陆上回旋钻机钻孔桩径(m)≤1.0软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":11057.85,"h":0.452,"i":2150.28,"j":559.9,"k":8347.67,"l":""}]
- 2025-03-10 18:15:53,040 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_25.png
- 2025-03-10 18:15:53,040 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_26.png
- 2025-03-10 18:15:53,040 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_26.png
- 2025-03-10 18:16:45,591 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-126","c":"陆上回旋钻机钻孔桩径(m)≤1.25软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":14153.57,"h":0.695,"i":2777.73,"j":794.26,"k":10581.58,"l":""},{"a":"QY_2024","b":"QY-127","c":"陆上回旋钻机钻孔桩径(m)≤1.50软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":16090.22,"h":1.078,"i":3118.01,"j":1111.87,"k":11860.34,"l":""},{"a":"QY_2024","b":"QY-128","c":"陆上回旋钻机钻孔桩径(m)≤2.0软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":20605.93,"h":1.903,"i":2077.47,"j":15931.68,"k":"","l":""},{"a":"QY_2024","b":"QY-129","c":"陆上回旋钻机钻孔桩径(m)≤2.5软石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":28943.33,"h":2.963,"i":3629.25,"j":3065.66,"k":22248.42,"l":""},{"a":"QY_2024","b":"QY-130","c":"陆上回旋钻机钻孔桩径(m)≤0.8卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":11465.84,"h":0.296,"i":2837.7,"j":423.67,"k":8204.47,"l":""}]
- 2025-03-10 18:16:45,635 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 18:16:45,653 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_26.png
- 2025-03-10 18:16:45,653 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_27.png
- 2025-03-10 18:16:45,653 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_27.png
- 2025-03-10 18:18:12,269 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-131","c":"陆上回旋钻机钻孔桩径(m)≤1.0卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":15953.58,"h":0.453,"i":3980.42,"j":711.99,"k":11261.17,"l":""},{"a":"QY_2024","b":"QY-132","c":"陆上回旋钻机钻孔桩径(m)≤1.25卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":20856.17,"h":0.696,"i":5255.46,"j":960.28,"k":14640.43,"l":""},{"a":"QY_2024","b":"QY-133","c":"陆上回旋钻机钻孔桩径(m)≤1.50卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":24904.24,"h":1.079,"i":1298.02,"j":17368.71,"k":"","l":""},{"a":"QY_2024","b":"QY-134","c":"陆上回旋钻机钻孔桩径(m)≤2.0卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":27764.38,"h":1.904,"i":4063.35,"j":2366.09,"k":21314.94,"l":""},{"a":"QY_2024","b":"QY-135","c":"陆上回旋钻机钻孔桩径(m)≤2.5卵石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":39188.55,"h":2.964,"i":5733.58,"j":3525.5,"k":29929.47,"l":""}]
- 2025-03-10 18:18:12,314 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 18:18:12,335 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_27.png
- 2025-03-10 18:18:12,335 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_28.png
- 2025-03-10 18:18:12,335 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_28.png
- 2025-03-10 18:19:16,500 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-136","c":"陆上回旋钻机钻孔桩径(m)≤0.8次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":13172.25,"h":0.297,"i":2543.97,"j":548.42,"k":10079.86,"l":""},{"a":"QY_2024","b":"QY-137","c":"陆上回旋钻机钻孔桩径(m)≤1.0次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":18200.13,"h":0.454,"i":3563.61,"j":840.64,"k":13795.88,"l":""},{"a":"QY_2024","b":"QY-138","c":"陆上回旋钻机钻孔桩径(m)≤1.25次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":23582.8,"h":0.697,"i":4570.21,"j":1105.41,"k":17801.19,"l":""},{"a":"QY_2024","b":"QY-139","c":"陆上回旋钻机钻孔桩径(m)≤1.50次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":28986.56,"h":1.08,"i":5702.41,"j":1577.36,"k":21706.79,"l":""},{"a":"QY_2024","b":"QY-140","c":"陆上回旋钻机钻孔桩径(m)≤2.0次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":31953.96,"h":1.905,"i":4106.78,"j":2703.94,"k":25143.24,"l":""}]
- 2025-03-10 18:19:16,565 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_28.png
- 2025-03-10 18:19:16,565 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_29.png
- 2025-03-10 18:19:16,565 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_29.png
- 2025-03-10 18:20:16,255 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-141","c":"陆上回旋钻机钻孔桩径(m)≤2.5次坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":44966.96,"h":2.965,"i":5763.87,"j":3987.76,"k":35215.33,"l":""},{"a":"QY_2024","b":"QY-142","c":"陆上回旋钻机钻孔桩径(m)≤0.8坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":21624.59,"h":0.299,"i":4228.06,"j":745.78,"k":16650.75,"l":""},{"a":"QY_2024","b":"QY-143","c":"陆上回旋钻机钻孔桩径(m)≤1.0坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":29839.45,"h":0.456,"i":5918.09,"j":1070.64,"k":22849.8,"l":""},{"a":"QY_2024","b":"QY-144","c":"陆上回旋钻机钻孔桩径(m)≤1.25坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":38346.38,"h":0.699,"i":7697.24,"j":1374.57,"k":29274.57,"l":""},{"a":"QY_2024","b":"QY-145","c":"陆上回旋钻机钻孔桩径(m)≤1.50坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":47169.78,"h":1.082,"i":9417.58,"j":1936.22,"k":35615.98,"l":""}]
- 2025-03-10 18:20:16,310 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_29.png
- 2025-03-10 18:20:16,311 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_30.png
- 2025-03-10 18:20:16,311 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_30.png
- 2025-03-10 18:21:03,974 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-146","c":"陆上回旋钻机钻孔桩径(m)≤2.0坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":51781.86,"h":1.907,"i":6822.3,"j":3317.63,"k":41641.93,"l":""},{"a":"QY_2024","b":"QY-147","c":"陆上回旋钻机钻孔桩径(m)≤2.5坚石","d":"安拆泥浆循环系统并造浆,准备钻具,装、拆、移钻机,安拆钻头,钻进、压泥浆、清理钻渣、清孔。","e":"10m","f":"","g":73207.17,"h":2.967,"i":9610.32,"j":4848.58,"k":58748.27,"l":""},{"a":"QY_2024","b":"QY-148","c":"水上冲击钻机钻孔桩径(m)≤1.25土层","d":"泥浆槽、沉淀筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":9492.14,"h":0.656,"i":1817.61,"j":695.54,"k":6978.99,"l":""},{"a":"QY_2024","b":"QY-149","c":"水上冲击钻机钻孔桩径(m)≤1.50土层","d":"泥浆槽、沉淀筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":10870.42,"h":0.892,"i":2090.46,"j":798.1,"k":7981.86,"l":""},{"a":"QY_2024","b":"QY-150","c":"水上冲击钻机钻孔桩径(m)≤2.00土层","d":"泥浆槽、沉淀筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":12107.08,"h":1.576,"i":2521.89,"j":1392.68,"k":8192.51,"l":""}]
- 2025-03-10 18:21:04,046 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_30.png
- 2025-03-10 18:21:04,046 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_31.png
- 2025-03-10 18:21:04,046 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_31.png
- 2025-03-10 18:21:47,766 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-151","c":"水上冲击钻机钻孔桩径(m)≤1.25砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":20546.78,"h":1.012,"i":4149.29,"j":838.1,"k":15559.39,"l":""},{"a":"QY_2024","b":"QY-152","c":"水上冲击钻机钻孔桩径(m)≤1.50砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":22849.97,"h":1.406,"i":4605.48,"j":1001.81,"k":17242.68,"l":""},{"a":"QY_2024","b":"QY-153","c":"水上冲击钻机钻孔桩径(m)≤2.00砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":23629.86,"h":2.491,"i":5233.38,"j":1754.19,"k":16642.29,"l":""},{"a":"QY_2024","b":"QY-154","c":"水上冲击钻机钻孔桩径(m)≤1.25软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":41712.96,"h":1.902,"i":8667.51,"j":843.34,"k":32202.11,"l":""},{"a":"QY_2024","b":"QY-155","c":"水上冲击钻机钻孔桩径(m)≤1.50软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":45123.12,"h":1.406,"i":9361.34,"j":1007.05,"k":34754.73,"l":""}]
- 2025-03-10 18:21:47,850 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_31.png
- 2025-03-10 18:21:47,850 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_32.png
- 2025-03-10 18:21:47,850 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_32.png
- 2025-03-10 18:23:03,713 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-156","c":"水上冲击钻机钻孔桩径(m)≤2.00软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":48669.5,"h":2.492,"i":11305.76,"j":1765.5,"k":35598.24,"l":""},{"a":"QY_2024","b":"QY-157","c":"水上冲击钻机钻孔桩径(m)≤1.25卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":59777.61,"h":1.012,"i":12522.77,"j":854.96,"k":46399.88,"l":""},{"a":"QY_2024","b":"QY-158","c":"水上冲击钻机钻孔桩径(m)≤1.50卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":65919,"h":1.406,"i":13791.24,"j":1018.66,"k":51109.1,"l":""},{"a":"QY_2024","b":"QY-159","c":"水上冲击钻机钻孔桩径(m)≤2.00卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":69903.46,"h":2.512,"i":16440.8,"j":1867.73,"k":51959.65,"l":""},{"a":"QY_2024","b":"QY-160","c":"水上冲击钻机钻孔桩径(m)≤1.25次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":76410.81,"h":1.012,"i":16065.64,"j":882.95,"k":59462.22,"l":""}]
- 2025-03-10 18:23:03,789 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_32.png
- 2025-03-10 18:23:03,789 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_33.png
- 2025-03-10 18:23:03,790 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_33.png
- 2025-03-10 18:23:51,097 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-161","c":"水上冲击钻机钻孔桩径(m)≤1.50次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":86356.17,"h":1.406,"i":18154.01,"j":1049.55,"k":67152.61,"l":""},{"a":"QY_2024","b":"QY-162","c":"水上冲击钻机钻孔桩径(m)≤2.00次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":115928.609,"h":2.512,"i":19562.87,"j":1930.98,"k":94434.76,"l":""},{"a":"QY_2024","b":"QY-163","c":"水上冲击钻机钻孔桩径(m)≤1.25坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":125015.25,"h":1.012,"i":26433.2,"j":926.82,"k":97655.23,"l":""},{"a":"QY_2024","b":"QY-164","c":"水上冲击钻机钻孔桩径(m)≤1.50坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":139047.281,"h":1.406,"i":29393.68,"j":1097.6,"k":108556,"l":""},{"a":"QY_2024","b":"QY-165","c":"水上冲击钻机钻孔桩径(m)≤2.00坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":145801.9,"h":2.512,"i":34826.67,"j":2006.45,"k":108968.6,"l":""}]
- 2025-03-10 18:23:51,162 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_33.png
- 2025-03-10 18:23:51,162 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_34.png
- 2025-03-10 18:23:51,162 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_34.png
- 2025-03-10 18:24:45,873 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-166","c":"水上回旋钻机钻孔桩径(m)≤1.25土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":9999.32,"h":0.544,"i":1190.01,"j":705.66,"k":8103.65,"l":""},{"a":"QY_2024","b":"QY-167","c":"水上回旋钻机钻孔桩径(m)≤1.5土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":11040.32,"h":0.786,"i":1314.57,"j":806.77,"k":8918.98,"l":""},{"a":"QY_2024","b":"QY-168","c":"水上回旋钻机钻孔桩径(m)≤2.0土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":11487.44,"h":1.391,"i":959.67,"j":1466.84,"k":9060.93,"l":""},{"a":"QY_2024","b":"QY-169","c":"水上回旋钻机钻孔桩径(m)≤2.5土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":15539.45,"h":2.009,"i":1318.75,"j":1860.15,"k":12360.55,"l":""},{"a":"QY_2024","b":"QY-170","c":"水上回旋钻机钻孔桩径(m)≤3.0土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":21091.78,"h":3.057,"i":1795.98,"j":2567.75,"k":16728.05,"l":""}]
- 2025-03-10 18:24:45,960 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_34.png
- 2025-03-10 18:24:45,960 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_35.png
- 2025-03-10 18:24:45,961 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_35.png
- 2025-03-10 18:25:44,100 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-171","c":"水上回旋钻机钻孔桩径(m)≤3.50土层","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":28256.82,"h":4.03,"i":2175.49,"j":3661.59,"k":22419.74,"l":""},{"a":"QY_2024","b":"QY-172","c":"水上回旋钻机钻孔桩径(m)≤1.25砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":20671.97,"h":0.829,"i":2210.85,"j":792.55,"k":17668.57,"l":""},{"a":"QY_2024","b":"QY-173","c":"水上回旋钻机钻孔桩径(m)≤1.5砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":21621.88,"h":1.232,"i":2303.64,"j":935.58,"k":18382.66,"l":""},{"a":"QY_2024","b":"QY-174","c":"水上回旋钻机钻孔桩径(m)≤2.0砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":22553.69,"h":2.185,"i":1959.78,"j":1690.83,"k":18803.08,"l":""},{"a":"QY_2024","b":"QY-175","c":"水上回旋钻机钻孔桩径(m)≤2.5砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":30299.1,"h":3.201,"i":2715.97,"j":2351.01,"k":25232.12,"l":""}]
- 2025-03-10 18:25:44,181 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_35.png
- 2025-03-10 18:25:44,182 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_36.png
- 2025-03-10 18:25:44,182 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_36.png
- 2025-03-10 18:27:16,409 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-176","c":"水上回旋钻机钻孔桩径(m)≤3.0砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":38634.09,"h":4.904,"i":3442.18,"j":3317.23,"k":31874.68,"l":""},{"a":"QY_2024","b":"QY-177","c":"水上回旋钻机钻孔桩径(m)≤3.50砂砾石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":50563.71,"h":6.118,"i":4114.53,"j":4496.95,"k":41952.23,"l":""},{"a":"QY_2024","b":"QY-178","c":"水上回旋钻机钻孔桩径(m)≤1.25软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":41533.31,"h":9.829,"i":4500.91,"j":1229.39,"k":35803.01,"l":""},{"a":"QY_2024","b":"QY-179","c":"水上回旋钻机钻孔桩径(m)≤1.5软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":43661.91,"h":1.232,"i":4705.73,"j":1550.5,"k":37405.68,"l":""},{"a":"QY_2024","b":"QY-180","c":"水上回旋钻机钻孔桩径(m)≤2.0软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":44643.43,"h":2.185,"i":4057.1,"j":2814.39,"k":37771.94,"l":""}]
- 2025-03-10 18:27:16,478 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_36.png
- 2025-03-10 18:27:16,478 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_37.png
- 2025-03-10 18:27:16,478 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_37.png
- 2025-03-10 18:28:33,777 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-181","c":"水上回旋钻机钻孔桩径(m)≤2.5软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":56991.1,"h":3.201,"i":5140.89,"j":4063.26,"k":47786.95,"l":""},{"a":"QY_2024","b":"QY-182","c":"水上回旋钻机钻孔桩径(m)≤3.0软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":73486.36,"h":4.904,"i":6594.35,"j":5804.17,"k":61087.84,"l":""},{"a":"QY_2024","b":"QY-183","c":"水上回旋钻机钻孔桩径(m)≤3.50软石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":99493.94,"h":5.807,"i":8115.69,"j":7930.52,"k":83447.73,"l":""},{"a":"QY_2024","b":"QY-184","c":"水上回旋钻机钻孔桩径(m)≤1.25卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":57982.29,"h":0.829,"i":6356.56,"j":1351.44,"k":50274.29,"l":""},{"a":"QY_2024","b":"QY-185","c":"水上回旋钻机钻孔桩径(m)≤1.5卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":62922.48,"h":1.232,"i":6877.2,"j":1692.69,"k":54352.59,"l":""}]
- 2025-03-10 18:28:33,826 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_37.png
- 2025-03-10 18:28:33,826 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_38.png
- 2025-03-10 18:28:33,826 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_38.png
- 2025-03-10 18:29:49,866 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-186","c":"水上回旋钻机钻孔桩径(m)≤2.0卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":64375.09,"h":2.205,"i":5927.07,"j":3183.79,"k":55264.23,"l":""},{"a":"QY_2024","b":"QY-187","c":"水上回旋钻机钻孔桩径(m)≤2.5卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":75135.27,"h":3.293,"i":6876.15,"j":4825.55,"k":63433.57,"l":""},{"a":"QY_2024","b":"QY-188","c":"水上回旋钻机钻孔桩径(m)≤3.0卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":98450.89,"h":5.076,"i":8890.68,"j":7599.9,"k":81960.31,"l":""},{"a":"QY_2024","b":"QY-189","c":"水上回旋钻机钻孔桩径(m)≤3.50卵石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":137695.994,"h":5.743,"i":11490.40,"j":8695.55,"k":117474,"l":""},{"a":"QY_2024","b":"QY-190","c":"水上回旋钻机钻孔桩径(m)≤1.25次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":66831.66,"h":0.829,"i":7290.43,"j":1493.81,"k":60047.42,"l":""}]
- 2025-03-10 18:29:49,958 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_38.png
- 2025-03-10 18:29:49,959 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_39.png
- 2025-03-10 18:29:49,959 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_39.png
- 2025-03-10 18:30:30,379 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-191","c":"水上回旋钻机钻孔桩径(m)≤1.5次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":73457.86,"h":1.232,"i":8110.92,"j":1858.1,"k":63488.84,"l":""},{"a":"QY_2024","b":"QY-192","c":"水上回旋钻机钻孔桩径(m)≤2.0次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":75071.02,"h":2.205,"i":7002.66,"j":3530.09,"k":64538.27,"l":""},{"a":"QY_2024","b":"QY-193","c":"水上回旋钻机钻孔桩径(m)≤2.5次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":88724.54,"h":3.293,"i":8166.56,"j":5352.12,"k":75205.86,"l":""},{"a":"QY_2024","b":"QY-194","c":"水上回旋钻机钻孔桩径(m)≤3.0次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":119954.844,"h":5.076,"i":10936.19,"j":8338.19,"k":100679.,"l":""},{"a":"QY_2024","b":"QY-195","c":"水上回旋钻机钻孔桩径(m)≤3.50次坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":156776.109,"h":5.74,"i":13186.62,"j":8860.4,"k":134729.1,"l":""}]
- 2025-03-10 18:30:30,379 - ERROR - 保存图片内容失败: Expecting ',' delimiter: line 1 column 853 (char 852)
- 2025-03-10 18:30:30,380 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_39.png
- 2025-03-10 18:30:30,380 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_40.png
- 2025-03-10 18:30:30,381 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_40.png
- 2025-03-10 18:31:15,187 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-196","c":"水上回旋钻机钻孔桩径(m)≤1.25坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":108330.383,"h":0.829,"i":11993.92,"j":1755,"k":94581.46,"l":""},{"a":"QY_2024","b":"QY-197","c":"水上回旋钻机钻孔桩径(m)≤1.5坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":123613.844,"h":1.232,"i":13672.65,"j":2160.79,"k":107780.4,"l":""},{"a":"QY_2024","b":"QY-198","c":"水上回旋钻机钻孔桩径(m)≤2.0坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":127355.547,"h":2.205,"i":12129.23,"j":3815.38,"k":111410.93,"l":""},{"a":"QY_2024","b":"QY-199","c":"水上回旋钻机钻孔桩径(m)≤2.5坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":144689.016,"h":2.293,"i":13620.73,"j":5877.72,"k":125190.57,"l":""},{"a":"QY_2024","b":"QY-200","c":"水上回旋钻机钻孔桩径(m)≤3.0坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":196070.3,"h":5.076,"i":18230.24,"j":10342.13,"k":167497.93,"l":""}]
- 2025-03-10 18:31:15,258 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_40.png
- 2025-03-10 18:31:15,258 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_41.png
- 2025-03-10 18:31:15,258 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_41.png
- 2025-03-10 18:32:07,853 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-201","c":"水上回旋钻机钻孔桩径(m)≤3.50坚石","d":"泥浆槽、沉渣筒制安拆,钻机安拆,移动钻机,泥浆船拼拆,设置水上泥浆循环系统、造浆、钻进、提钻、换浆、清孔、清除废浆等沉淀物、潜水作业等。","e":"10m","f":"","g":264736.938,"h":5.914,"i":22611.06,"j":11380.26,"k":230745.618,"l":""},{"a":"QY_2024","b":"QY-202","c":"钻孔桩混凝土浇筑土质地层(旋挖钻)非泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(11.220):","g":245.15,"h":0,"i":101.74,"j":41.31,"k":102.1,"l":""},{"a":"QY_2024","b":"QY-203","c":"钻孔桩混凝土浇筑土质地层(旋挖钻)泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(11.220):","g":262.33,"h":0,"i":145.3,"j":45.75,"k":71.28,"l":""},{"a":"QY_2024","b":"QY-204","c":"钻孔桩混凝土浇筑其他地层(冲击钻)非泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(12.600):","g":262.39,"h":0,"i":107.71,"j":39.55,"k":115.13,"l":""},{"a":"QY_2024","b":"QY-205","c":"钻孔桩混凝土浇筑其他地层(冲击钻)泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(12.600):","g":277.29,"h":0,"i":151.12,"j":46.71,"k":79.46,"l":""}]
- 2025-03-10 18:32:07,939 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_41.png
- 2025-03-10 18:32:07,939 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_42.png
- 2025-03-10 18:32:07,940 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_42.png
- 2025-03-10 18:32:33,162 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-206","c":"钻孔桩混凝土浇筑 其他地层(回旋钻) 非泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(11.830);","g":259.26,"h":0,"i":112.18,"j":39.55,"k":107.53,"l":""},{"a":"QY_2024","b":"QY-207","c":"钻孔桩混凝土浇筑 其他地层(回旋钻) 泵送","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(11.830);","g":274.58,"h":0,"i":154.55,"j":45.25,"k":74.78,"l":""},{"a":"QY_2024","b":"QY-208","c":"水上钻孔桩浇筑水下混凝土 冲击钻","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(12.600);","g":1154.1,"h":0,"i":757.69,"j":59.52,"k":336.89,"l":""},{"a":"QY_2024","b":"QY-209","c":"水上钻孔桩浇筑水下混凝土 回旋钻","d":"混凝土浇筑、清理浮浆、桩头清理、水封导管安拆、冲洗、堆放。","e":"10m³","f":"HT-0(11.830);","g":1103.03,"h":0,"i":711.29,"j":59.52,"k":332.22,"l":""},{"a":"QY_2024","b":"QY-210","c":"单层钢筋笼制安 陆上","d":"钢筋制作及绑扎、焊接、安放、定位、校正。","e":"t","f":"","g":4664.35,"h":1.033,"i":617.75,"j":3720.71,"k":325.89,"l":""}]
- 2025-03-10 18:32:33,236 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_42.png
- 2025-03-10 18:32:33,236 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_43.png
- 2025-03-10 18:32:33,236 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_43.png
- 2025-03-10 18:33:12,941 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-211","c":"单层钢筋笼制安水上","d":"钢筋制作及绑扎、焊接、安放、定位、校正。","e":"t","f":"","g":5075.4,"h":1.033,"i":617.75,"j":3720.71,"k":736.94,"l":""},{"a":"QY_2024","b":"QY-212","c":"双层钢筋笼制安(水上)","d":"钢筋制作及绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5437.35,"h":1.011,"i":584.04,"j":3759.84,"k":1093.47,"l":""},{"a":"QY_2024","b":"QY-213","c":"声测管制安","d":"制作,随钢筋笼吊装。","e":"t","f":"","g":4726.56,"h":1.098,"i":500.65,"j":4127.64,"k":98.27,"l":""},{"a":"QY_2024","b":"QY-214","c":"泥浆外运1km以内","d":"装卸、运输、清理场地。","e":"10m3","f":"","g":27.31,"h":0,"i":8.06,"j":0,"k":19.25,"l":""},{"a":"QY_2024","b":"QY-215","c":"泥浆外运增运1km","d":"装卸、运输、清理场地。","e":"10m3","f":"","g":6.41,"h":0,"i":0,"j":0,"k":6.41,"l":""}]
- 2025-03-10 18:33:13,017 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_43.png
- 2025-03-10 18:33:13,017 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_44.png
- 2025-03-10 18:33:13,017 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_44.png
- 2025-03-10 18:33:36,077 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-216","c":"钻渣外运1km以内","d":"装卸、运输、清理场地。","e":"10m3","f":"","g":126.69,"h":0,"i":10.59,"j":0,"k":116.1,"l":""},{"a":"QY_2024","b":"QY-217","c":"钻渣外运 增运1km","d":"装卸、运输、清理场地。","e":"10m3","f":"","g":24.42,"h":0,"i":0,"j":0,"k":24.42,"l":""},{"a":"QY_2024","b":"QY-218","c":"钢围堰上钻孔平台","d":"制作,搭拆。","e":"100m2","f":"","g":116737.18,"h":9.366,"i":50335.57,"j":41121.93,"k":25279.68,"l":""},{"a":"QY_2024","b":"QY-219","c":"钻孔工作平台 桩径≤2.0m水深≤5.0m","d":"钢结构制安拆,打拔定位钢筒,平台与定位护筒临时联接及拆除。","e":"100m2","f":"","g":228152.516,"h":10.168,"i":59091.84,"j":51604.51,"k":117456.,"l":""},{"a":"QY_2024","b":"QY-220","c":"钻孔工作平台 桩径≤3.5m水深≤10m","d":"钢结构制安拆,打拔定位钢筒,平台与定位护筒临时联接及拆除。","e":"100m2","f":"","g":339749.125,"h":10.76,"i":84759.6,"j":55020.43,"k":199969.1,"l":""}]
- 2025-03-10 18:33:36,077 - ERROR - 保存图片内容失败: Expecting ',' delimiter: line 1 column 579 (char 578)
- 2025-03-10 18:33:36,077 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_44.png
- 2025-03-10 18:33:36,077 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_45.png
- 2025-03-10 18:33:36,077 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_45.png
- 2025-03-10 18:34:10,484 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-221","c":"钻孔工作平台桩径≤3.5m水深≤20m","d":"钢木结构制装拆,打拔定位钢筒,平台与定位护筒临时联接及拆除。","e":"100m2","f":"","g":408184.4,"h":17.198,"i":85169.1,"j":80963.66,"k":242051.1,"l":""},{"a":"QY_2024","b":"QY-222","c":"钢护筒埋设及拆除埋深≤2m","d":"埋设、拆除存放。","e":"t","f":"","g":1593.48,"h":10.14,"i":742.02,"j":737.41,"k":114.05,"l":""},{"a":"QY_2024","b":"QY-223","c":"钢护筒埋设及拆除埋深≤4m","d":"埋设、拆除存放。","e":"t","f":"","g":1701.23,"h":5.238,"i":703.98,"j":769.22,"k":228.03,"l":""},{"a":"QY_2024","b":"QY-224","c":"钢护筒插打桩径≤2m","d":"护筒下河、吊插、下沉、护筒导向架安拆。","e":"t","f":"","g":6707.31,"h":1.025,"i":372.2,"j":5175.28,"k":1159.83,"l":""},{"a":"QY_2024","b":"QY-225","c":"钢护筒插打桩径≤3.0m","d":"护筒下河、吊插、下沉、护筒导向架安拆。","e":"t","f":"","g":7671.97,"h":1.025,"i":322.97,"j":5456.55,"k":1892.45,"l":""}]
- 2025-03-10 18:34:10,562 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_45.png
- 2025-03-10 18:34:10,562 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_46.png
- 2025-03-10 18:34:10,562 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_46.png
- 2025-03-10 18:34:56,120 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-226","c":"钢护筒插打桩径≤3.5m","d":"护筒下河、吊插、下沉,护筒导向架安拆。","e":"t","f":"","g":9051.09,"h":1.025,"i":315.66,"j":5456.55,"k":3278.88,"l":""},{"a":"QY_2024","b":"QY-227","c":"钢护筒安装及固定架制安拆","d":"下河、吊装,钢护筒安装、固定架制安拆。","e":"t","f":"","g":12931.77,"h":1.218,"i":1563.26,"j":5934.89,"k":5433.62,"l":""},{"a":"QY_2024","b":"QY-228","c":"钢导向护筒安拆","d":"钢护筒下河、安装、拆除、整修、存放。","e":"t","f":"","g":2615.91,"h":0.144,"i":1270.27,"j":787.34,"k":558.3,"l":""},{"a":"QY_2024","b":"QY-229","c":"凿除混凝土桩头桩径(m)≤1.0","d":"桩头环切、凿混凝土、剥离钢筋、磨桩头、吊运桩头至坑外。","e":"1根桩","f":"","g":255.93,"h":0,"i":77.28,"j":2.16,"k":176.49,"l":""},{"a":"QY_2024","b":"QY-230","c":"凿除混凝土桩头桩径(m)≤2.0","d":"桩头环切、凿混凝土、剥离钢筋、磨桩头、吊运桩头至坑外。","e":"1根桩","f":"","g":409.01,"h":0,"i":124.71,"j":3.17,"k":281.13,"l":""}]
- 2025-03-10 18:34:56,187 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_46.png
- 2025-03-10 18:34:56,187 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_47.png
- 2025-03-10 18:34:56,187 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_47.png
- 2025-03-10 18:35:35,746 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-231","c":"拆除混凝土桩头 桩径(m)≤3.0","d":"桩头环切、凿混凝土、剥离钢筋、磨桩头、吊运桩头至坑外。","e":"1根桩","f":"","g":875.56,"h":0,"i":267.93,"j":7.02,"k":600.61,"l":""},{"a":"QY_2024","b":"QY-232","c":"挖孔桩开挖 孔深(m)≤10 普通土","d":"开挖、吊运、孔口外10m以内运输、支撑防护、修整桩孔、通风管路铺、拆、通风。","e":"10m³","f":"","g":1125.55,"h":0,"i":638.64,"j":11.34,"k":475.57,"l":""},{"a":"QY_2024","b":"QY-233","c":"挖孔桩开挖 孔深(m)≤15 普通土","d":"开挖、吊运、孔口外10m以内运输、支撑防护、修整桩孔、通风管路铺、拆、通风。","e":"10m³","f":"","g":1475.43,"h":0,"i":874.34,"j":17.74,"k":583.35,"l":""},{"a":"QY_2024","b":"QY-234","c":"挖孔桩开挖 孔深(m)≤10 硬土","d":"开挖、吊运、孔口外10m以内运输、支撑防护、修整桩孔、通风管路铺、拆、通风。","e":"10m³","f":"","g":1521.79,"h":0,"i":873.45,"j":11.54,"k":636.8,"l":""},{"a":"QY_2024","b":"QY-235","c":"挖孔桩开挖 孔深(m)≤15 硬土","d":"开挖、吊运、孔口外10m以内运输、支撑防护、修整桩孔、通风管路铺、拆、通风。","e":"10m³","f":"","g":2007.05,"h":0,"i":1194.04,"j":17.94,"k":795.07,"l":""}]
- 2025-03-10 18:35:35,814 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_47.png
- 2025-03-10 18:35:35,814 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_48.png
- 2025-03-10 18:35:35,814 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_48.png
- 2025-03-10 18:36:16,457 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-236","c":"挖孔桩开挖 孔深(m) ≤10 软石","d":"开挖,吊运,孔口外11m以内运输,支撑防护,修整桩孔,通风管路铺、拆,通风。","e":"10m³","f":"","g":1579.89,"h":0.006,"i":715.77,"j":189.31,"k":674.81,"l":""},{"a":"QY_2024","b":"QY-237","c":"挖孔桩开挖 孔深(m) ≤15 软石","d":"开挖,吊运,孔口外12m以内运输,支撑防护,修整桩孔,通风管路铺、拆,通风。","e":"10m³","f":"","g":1920.91,"h":0.006,"i":925.66,"j":195.71,"k":799.54,"l":""},{"a":"QY_2024","b":"QY-238","c":"挖孔桩开挖 孔深(m) ≤10 次坚石","d":"开挖,吊运,孔口外13m以内运输,支撑防护,修整桩孔,通风管路铺、拆,通风。","e":"10m³","f":"","g":2518.28,"h":0.011,"i":1064.55,"j":414.72,"k":1039.01,"l":""},{"a":"QY_2024","b":"QY-239","c":"挖孔桩开挖 孔深(m) ≤15 次坚石","d":"开挖,吊运,孔口外14m以内运输,支撑防护,修整桩孔,通风管路铺、拆,通风。","e":"10m³","f":"","g":3025.44,"h":0.011,"i":1377.53,"j":421.12,"k":1226.79,"l":""},{"a":"QY_2024","b":"QY-240","c":"挖孔抽水","d":"管路铺拆,抽水。","e":"10m³湿土","f":"","g":114.86,"h":0,"i":38.94,"j":0.43,"k":75.49,"l":""}]
- 2025-03-10 18:36:16,555 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_48.png
- 2025-03-10 18:36:16,555 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_49.png
- 2025-03-10 18:36:16,555 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_49.png
- 2025-03-10 18:37:06,936 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-241","c":"挖孔桩桩身混凝土非泵送","d":"搭拆浇筑平台,混凝土浇筑、振捣及养护,桩头处理。","e":"10m3","f":"HT-0(10.400);","g":703.96,"h":0,"i":584.49,"j":35.84,"k":83.63,"l":""},{"a":"QY_2024","b":"QY-242","c":"挖孔桩桩身混凝土泵送","d":"搭拆浇筑平台,混凝土浇筑、振捣及养护,桩头处理。","e":"10m3","f":"HT-0(10.400);","g":352.44,"h":0,"i":265.24,"j":35.46,"k":51.74,"l":""},{"a":"QY_2024","b":"QY-243","c":"挖孔桩护壁混凝土非泵送","d":"模板安拆、定位、校正,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":2963.9,"h":0.031,"i":2669.43,"j":190.16,"k":104.31,"l":""},{"a":"QY_2024","b":"QY-244","c":"挖孔桩桩靴制安","d":"桩靴制作及安装。","e":"10kg","f":"","g":182.08,"h":0.011,"i":3.28,"j":39.4,"k":139.4,"l":""},{"a":"QY_2024","b":"QY-245","c":"方桩接头硫磺胶泥","d":"硫磺胶泥拌制、浇注,紧固接头。","e":"10个","f":"","g":1035.11,"h":0.014,"i":721.29,"j":313.82,"k":0,"l":""}]
- 2025-03-10 18:37:07,019 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_49.png
- 2025-03-10 18:37:07,019 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_50.png
- 2025-03-10 18:37:07,019 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_50.png
- 2025-03-10 18:37:37,813 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-246","c":"方桩接头 法兰盘","d":"接头安装。","e":"10个","f":"","g":4892.62,"h":0.615,"i":738.14,"j":3720.71,"k":433.77,"l":""},{"a":"QY_2024","b":"QY-247","c":"陆上打方桩 松土","d":"准备机具,吊桩定位,安卸桩帽,打桩、接桩、送桩、桩头处理。","e":"10m3","f":"","g":3414.77,"h":0.011,"i":1905.77,"j":96.17,"k":1412.83,"l":""},{"a":"QY_2024","b":"QY-248","c":"陆上打方桩 普通土","d":"准备机具,吊桩定位,安卸桩帽,打桩、接桩、送桩、桩头处理。","e":"10m3","f":"","g":4419.47,"h":0.014,"i":2303.19,"j":102.95,"k":2013.33,"l":""},{"a":"QY_2024","b":"QY-249","c":"船上打方桩 松土","d":"准备机具,吊桩定位,安卸桩帽,打桩、接桩、送桩、桩头处理。","e":"10m3","f":"","g":7415.44,"h":0.011,"i":3013.29,"j":96.17,"k":4305.98,"l":""},{"a":"QY_2024","b":"QY-250","c":"船上打方桩 普通土","d":"准备机具,吊桩定位,安卸桩帽,打桩、接桩、送桩、桩头处理。","e":"10m3","f":"","g":9963.63,"h":0.014,"i":3719.21,"j":102.95,"k":6141.47,"l":""}]
- 2025-03-10 18:37:37,880 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_50.png
- 2025-03-10 18:37:37,880 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_51.png
- 2025-03-10 18:37:37,880 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_51.png
- 2025-03-10 18:38:16,982 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-251","c":"陆上振动下沉管桩 桩径≤550 桩长(m) ≤24","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":18619.15,"h":34.294,"i":2000.21,"j":15405.42,"k":1213.52,"l":""},{"a":"QY_2024","b":"QY-252","c":"陆上振动下沉管桩 桩径≤550 桩长(m) ≤32","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":18188.97,"h":33.635,"i":1860.57,"j":15135.1,"k":1193.3,"l":""},{"a":"QY_2024","b":"QY-253","c":"陆上振动下沉管桩 桩径≤550 桩长(m) ≤40","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":18196.96,"h":33.991,"i":2020.49,"j":14911.62,"k":1264.85,"l":""},{"a":"QY_2024","b":"QY-254","c":"船上振动下沉管桩 桩径550 桩长(m) ≤24","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":20934.37,"h":34.276,"i":2360.92,"j":15364.73,"k":3208.72,"l":""},{"a":"QY_2024","b":"QY-255","c":"船上振动下沉管桩 桩径550 桩长(m) ≤32","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":20369.56,"h":33.617,"i":2214.28,"j":15094.42,"k":3060.86,"l":""}]
- 2025-03-10 18:38:17,034 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_51.png
- 2025-03-10 18:38:17,034 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_52.png
- 2025-03-10 18:38:17,034 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_52.png
- 2025-03-10 18:39:32,388 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-256","c":"船上振动下沉管桩 桩径550 桩长(m) ≤40","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接拆、打送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":20506.77,"h":32.973,"i":2215.77,"j":14870.93,"k":3420.07,"l":""},{"a":"QY_2024","b":"QY-257","c":"陆上锤击下沉管桩 桩径800 桩长≤40","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接桩及防腐涂装,打送桩,校正,复打。","e":"10m","f":"","g":4626.66,"h":7.403,"i":107.41,"j":4087.35,"k":431.9,"l":""},{"a":"QY_2024","b":"QY-258","c":"陆上锤击下沉管桩 管桩直径 桩径800 桩长≤30","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接桩及防腐涂装,打送桩,校正,复打。","e":"10m","f":"","g":4623.97,"h":7.542,"i":86.08,"j":4184.68,"k":353.21,"l":""},{"a":"QY_2024","b":"QY-259","c":"陆上锤击下沉管桩 管桩直径 桩径1000 桩长≤40","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接桩及防腐涂装,打送桩,校正,复打。","e":"10m","f":"","g":6104.51,"h":9.619,"i":165.59,"j":5319.04,"k":619.88,"l":""},{"a":"QY_2024","b":"QY-260","c":"陆上锤击下沉管桩 管桩直径 桩径1000 桩长≤30","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打,接桩及防腐涂装,打送桩,校正,复打。","e":"10m","f":"","g":6108.32,"h":9.801,"i":140.23,"j":5448.23,"k":519.86,"l":""}]
- 2025-03-10 18:39:32,448 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_52.png
- 2025-03-10 18:39:32,448 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_53.png
- 2025-03-10 18:39:32,448 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_53.png
- 2025-03-10 18:40:26,950 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-261","c":"钢管桩制作 桩径500","d":"下料、调直、焊接、拼接、拼装、堆放。","e":"t","f":"","g":6119.22,"h":1.055,"i":1287.72,"j":4095.91,"k":735.59,"l":""},{"a":"QY_2024","b":"QY-262","c":"陆上振动下沉钢管桩 桩径500 桩长(m) ≤24","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打、接桩、送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":5051.26,"h":0.042,"i":2600.51,"j":903.92,"k":1546.83,"l":""},{"a":"QY_2024","b":"QY-263","c":"陆上振动下沉钢管桩 桩径500 桩长(m) ≤32","d":"场内移动打桩机具,吊桩定位,安卸桩帽,插打、接桩、送桩,校正,复打,安拆地笼,桩头处理。","e":"100m","f":"","g":4908.74,"h":0.042,"i":2440.14,"j":991.07,"k":1477.53,"l":""},{"a":"QY_2024","b":"QY-264","c":"船上振动下沉钢管桩 桩径500 桩长(m) ≤24","d":"移动打桩机具,移船,吊桩定位,安卸桩帽,管桩下河,下沉管桩,接桩、送桩,校正,复打,桩头处理。","e":"100m","f":"","g":7853.53,"h":0.024,"i":2879.32,"j":863.23,"k":4110.98,"l":""},{"a":"QY_2024","b":"QY-265","c":"船上振动下沉钢管桩 桩径500 桩长(m) ≤32","d":"移动打桩机具,移船,吊桩定位,安卸桩帽,管桩下河,下沉管桩,接桩、送桩,校正,复打,桩头处理。","e":"100m","f":"","g":8314.05,"h":0.024,"i":3068.48,"j":950.39,"k":4295.16,"l":""}]
- 2025-03-10 18:40:27,028 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_53.png
- 2025-03-10 18:40:27,028 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_54.png
- 2025-03-10 18:40:27,028 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_54.png
- 2025-03-10 18:41:16,756 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-266","c":"管桩内浇筑混凝土 陆上","d":"浇筑平台搭拆,混凝土浇筑。","e":"10m3","f":"HT-0(10.200);","g":751.75,"h":0.023,"i":448.73,"j":91,"k":212.02,"l":""},{"a":"QY_2024","b":"QY-267","c":"管桩内浇筑混凝土 水上","d":"浇筑平台搭拆,混凝土浇筑。","e":"10m3","f":"HT-0(10.200);","g":1100.39,"h":0.023,"i":644.16,"j":91.11,"k":365.12,"l":""},{"a":"QY_2024","b":"QY-268","c":"船上打桩工作平台","d":"制安拆简易打桩架,移动、固定船只,制安拆平台。","e":"艘","f":"","g":21980.88,"h":1.238,"i":14978.24,"j":4821.98,"k":2180.63,"l":""},{"a":"QY_2024","b":"QY-269","c":"钢管柱制造(带法兰盘) 中≤2m","d":"钢料调直、整平、下料、钻孔、组装、堆放;法兰盘制安,分节和整根组装并校正轴线。","e":"t","f":"","g":5731.09,"h":1.05,"i":1093.94,"j":4025.91,"k":611.24,"l":""},{"a":"QY_2024","b":"QY-270","c":"钢管柱制造(带法兰盘) 中>2m","d":"钢料调直、整平、下料、钻孔、组装、堆放;法兰盘制安,分节和整根组装并校正轴线。","e":"t","f":"","g":6137.04,"h":1.053,"i":1145.11,"j":4132.51,"k":859.42,"l":""}]
- 2025-03-10 18:41:16,810 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_54.png
- 2025-03-10 18:41:16,810 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_55.png
- 2025-03-10 18:41:16,810 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_55.png
- 2025-03-10 18:43:31,529 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-271","c":"钢枕靴制作(不带法兰盘)","d":"钢料调直、整平、下料、钻孔、组装、堆放。法兰盘制安,分节和整根组装并校正轴线。","e":"t","f":"5682.6","g":1093.94,"h":1.05,"i":4025.84,"j":"","k":562.82,"l":""},{"a":"QY_2024","b":"QY-272","c":"钢筋混凝土管柱预制尖节≤3m","d":"法兰盘制安,钢筋制作、绑扎,模板制安拆,混凝土拌制、浇筑、振捣及养护,脚手架按拆、管柱存放移位:预应力混凝土管柱增加张拉工序,尖节管柱全镶钢...","e":"节(长7.5m)","f":"HT-6242(9.720)...","g":65819.52,"h":35.235,"i":15749.68,"j":41570.11,"k":8499.73,"l":""},{"a":"QY_2024","b":"QY-273","c":"钢筋混凝土管柱预制尖节≤3.6m","d":"法兰盘制安,钢筋制作、绑扎,模板制安拆,混凝土拌制、浇筑、振捣及养护,脚手架按拆、管柱存放移位:预应力混凝土管柱增加张拉工序,尖节管柱全镶钢...","e":"节(长7.5m)","f":"HT-6242(12.1...","g":77311.11,"h":43.514,"i":18481.46,"j":50171.14,"k":8658.51,"l":""},{"a":"QY_2024","b":"QY-274","c":"钢筋混凝土管柱预制尖节≤1.55m","d":"法兰盘制安,钢筋制作、绑扎,模板制安拆,混凝土拌制、浇筑、振捣及养护,脚手架按拆、管柱存放移位:预应力混凝土管柱增加张拉工序,尖节管柱全镶钢...","e":"10m","f":"HT-6242(4.980)...","g":18271.07,"h":15.21,"i":4601.61,"j":10797.87,"k":2871.59,"l":""},{"a":"QY_2024","b":"QY-275","c":"预应力混凝土管柱预制中节≤3m","d":"法兰盘制安,钢筋制作、绑扎,模板制安拆,混凝土拌制、浇筑、振捣及养护,脚手架按拆、管柱存放移位:预应力混凝土管柱增加张拉工序,尖节管柱全镶钢...","e":"10m","f":"HT-6242(12.9...","g":71200.74,"h":42.997,"i":18714.03,"j":40677.87,"k":11808.84,"l":""}]
- 2025-03-10 18:43:31,551 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'material_cost' at row 1")
- 2025-03-10 18:43:31,607 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_55.png
- 2025-03-10 18:43:31,607 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_56.png
- 2025-03-10 18:43:31,607 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_56.png
- 2025-03-10 18:44:01,818 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-276","c":"预应力混凝土管柱预制中节Φ3.6m","d":"法兰盘制安,钢筋制作、绑扎,模板制安装拆,混凝土拌制、浇筑、振捣及养护,脚手架按拆、管柱存放移位;预应力混凝土管柱增加张拉工序;尖节管柱全镶钢...","e":"10m","f":"HT-6250(16.2...","g":85607.89,"h":54.514,"i":19792.61,"j":52122.99,"k":13692.29,"l":""},{"a":"QY_2024","b":"QY-277","c":"钢筋(预应力)混凝土管柱Φ1.55m入土深度(m)≤25水深(m)≤20","d":"管柱下河、吊插、射水、吸泥、下沉、接高,起吊及辅助结构制安拆,柱头处理。","e":"10m","f":"","g":37781.36,"h":0.258,"i":3508.42,"j":1425.23,"k":32847.71,"l":""},{"a":"QY_2024","b":"QY-278","c":"钢筋(预应力)混凝土管柱Φ3m入土深度(m)≤40水深(m)≤25","d":"管柱下河、吊插、射水、吸泥、下沉、接高,起吊及辅助结构制安拆,柱头处理。","e":"10m","f":"","g":87579.16,"h":0.73,"i":16071.76,"j":3119.54,"k":68387.86,"l":""},{"a":"QY_2024","b":"QY-279","c":"钢筋(预应力)混凝土管柱Φ3.6m入土深度(m)≤30水深(m)≤30","d":"管柱下河、吊插、射水、吸泥、下沉、接高,起吊及辅助结构制安拆,柱头处理。","e":"10m","f":"","g":125351.922,"h":0.805,"i":17272.73,"j":3452.25,"k":104176.94,"l":""},{"a":"QY_2024","b":"QY-280","c":"钢管桩Φ≤2m入土深度(m)≤40水深(m)≤20","d":"管柱下河、吊插、射水、吸泥、下沉、接高,起吊及辅助结构制安拆,柱头处理。","e":"10m","f":"","g":45626.63,"h":0.096,"i":3482.01,"j":663.74,"k":41460.86,"l":""}]
- 2025-03-10 18:44:01,883 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_56.png
- 2025-03-10 18:44:01,883 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_57.png
- 2025-03-10 18:44:01,883 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_57.png
- 2025-03-10 18:44:52,210 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-281","c":"钢管柱Φ>2m入土深度(m)≤30水深(m)≤30","d":"管柱下河、吊插、射水、吸泥、下沉、接高,起吊及辅助结构制安拆,桩头处理。","e":"10m","f":"","g":85736.15,"h":0.507,"i":15186.23,"j":2305.66,"k":68244.26,"l":""},{"a":"QY_2024","b":"QY-282","c":"管柱及钻孔内清孔洗壁Φ≤2m","d":"接拆射水管,吸泥机,沉淀,清孔器制安拆。","e":"根","f":"","g":11508.79,"h":0.082,"i":3016.27,"j":902.88,"k":7589.64,"l":""},{"a":"QY_2024","b":"QY-283","c":"管柱及钻孔内清孔洗壁Φ>2m","d":"接拆射水管,吸泥机,沉淀,清孔器制安拆。","e":"根","f":"","g":16329.2,"h":0.163,"i":5943.03,"j":1803.82,"k":8582.35,"l":""},{"a":"QY_2024","b":"QY-284","c":"重力式钢筋混凝土沉井底节混凝土","d":"模板制安拆,刃脚钢结构制安,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10,200)","g":2864.17,"h":0.355,"i":1269.52,"j":1207.55,"k":387.1,"l":""},{"a":"QY_2024","b":"QY-285","c":"重力式钢筋混凝土沉井井身混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10,200)","g":1241.75,"h":0.116,"i":654.01,"j":330.09,"k":257.65,"l":""}]
- 2025-03-10 18:44:52,300 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_57.png
- 2025-03-10 18:44:52,301 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_58.png
- 2025-03-10 18:44:52,301 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_58.png
- 2025-03-10 18:45:13,267 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-286","c":"轻型钢筋混凝土沉井 底节混凝土","d":"模板制安拆,刃脚钢结构制安,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":3377.33,"h":0.475,"i":1494.63,"j":1515.28,"k":367.42,"l":""},{"a":"QY_2024","b":"QY-287","c":"轻型钢筋混凝土沉井 井身混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":1785.39,"h":0.226,"i":920.74,"j":605.19,"k":259.46,"l":""},{"a":"QY_2024","b":"QY-288","c":"钢筋混凝土沉井支承垫木铺拆","d":"铺设垫木,找平,抽出垫木、堆码。","e":"10m刃脚周长","f":"","g":1152.51,"h":0.331,"i":391.45,"j":761.06,"k":0,"l":""},{"a":"QY_2024","b":"QY-289","c":"钢筋混凝土沉井土模制作","d":"挖运土、填平,夯实,砂浆抹面。","e":"10m3土","f":"","g":760.52,"h":2.54,"i":547.34,"j":199.03,"k":14.15,"l":""},{"a":"QY_2024","b":"QY-290","c":"钢沉井 制作","d":"运料,下料,组拼,焊接。","e":"t","f":"","g":7159.75,"h":1.05,"i":1182.85,"j":4063.74,"k":1913.16,"l":""}]
- 2025-03-10 18:45:13,355 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_58.png
- 2025-03-10 18:45:13,355 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_59.png
- 2025-03-10 18:45:13,355 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_59.png
- 2025-03-10 18:45:41,898 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-291","c":"钢沉井拼装","d":"杆件下河,安装,脚手架搭拆,刃脚压浆,灌浆试验。","e":"t","f":"","g":4442.89,"h":0.092,"i":842.27,"j":281.43,"k":3319.19,"l":""},{"a":"QY_2024","b":"QY-292","c":"钢沉井上节井身混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":2159.28,"h":0.117,"i":1368.73,"j":332.16,"k":458.39,"l":""},{"a":"QY_2045","b":"QY-293","c":"沉井钢筋 陆上","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4271.35,"h":1.033,"i":519,"j":3606.54,"k":145.81,"l":""},{"a":"QY_2024","b":"QY-294","c":"沉井钢筋 水上","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4494.12,"h":1.033,"i":519,"j":3606.54,"k":368.58,"l":""},{"a":"QY_2024","b":"QY-295","c":"人工卷扬机提升 普通土","d":"工作平台搭拆,挖装土(石),卷扬机吊运出井、倾倒,纠偏清底整平,清除井周弃土,挖积水坑、排水。","e":"100m³","f":"","g":7778.7,"h":0,"i":6309.27,"j":11.65,"k":1457.78,"l":""}]
- 2025-03-10 18:45:41,970 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_59.png
- 2025-03-10 18:45:41,971 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_60.png
- 2025-03-10 18:45:41,971 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_60.png
- 2025-03-10 18:46:11,655 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-296","c":"人挖卷扬机提升硬土","d":"工作平台搭拆,挖装土(石),卷扬机吊运出井、倾卸,纠偏清底整平,清除井周弃土,挖积水坑、排水。","e":"100m3","f":"","g":10613.24,"h":0,"i":8720.76,"j":11.65,"k":1880.83,"l":""},{"a":"QY_2024","b":"QY-297","c":"人挖卷扬机提升软石","d":"工作平台搭拆,挖装土(石),卷扬机吊运出井、倾卸,纠偏清底整平,清除井周弃土,挖积水坑、排水。","e":"100m3","f":"","g":19712.89,"h":0,"i":15018.7,"j":13.6,"k":4680.59,"l":""},{"a":"QY_2024","b":"QY-298","c":"人挖卷扬机提升次坚石","d":"工作平台搭拆,挖装土(石),卷扬机吊运出井、倾卸,纠偏清底整平,清除井周弃土,挖积水坑、排水。","e":"100m3","f":"","g":25081.38,"h":0.018,"i":16693.69,"j":1123.13,"k":7264.56,"l":""},{"a":"QY_2024","b":"QY-299","c":"卷扬机配抓土斗松土","d":"工作平台搭拆,卷扬机配抓土斗挖土,吊运出井、倾卸,纠偏清基及清理井周弃土,排水。","e":"100m3","f":"","g":6637.01,"h":0.655,"i":2600.51,"j":1256.15,"k":2780.35,"l":""},{"a":"QY_2024","b":"QY-300","c":"卷扬机配抓土斗普通土","d":"工作平台搭拆,卷扬机配抓土斗挖土,吊运出井、倾卸,纠偏清基及清理井周弃土,排水。","e":"100m3","f":"","g":7969.27,"h":0.655,"i":3139.79,"j":1256.15,"k":3573.33,"l":""}]
- 2025-03-10 18:46:11,760 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_60.png
- 2025-03-10 18:46:11,760 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_61.png
- 2025-03-10 18:46:11,760 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_61.png
- 2025-03-10 18:46:35,447 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-301","c":"卷扬机配抓土斗 硬土","d":"工作平台搭拆,卷扬机配抓土斗挖土,吊运出井,倾卸,纠偏清基及清理井周弃土,排水。","e":"100m³","f":"","g":10242.15,"h":0.655,"i":4560.73,"j":1256.15,"k":4425.27,"l":""},{"a":"QY_2024","b":"QY-302","c":"起重机配抓土斗 松土","d":"起重机配抓土斗挖土,吊运出井,倾卸,纠偏清基及清理井周弃土,排水。","e":"100m³","f":"","g":7434.33,"h":0.655,"i":1194.93,"j":1256.15,"k":4983.25,"l":""},{"a":"QY_2024","b":"QY-303","c":"起重机配抓土斗 普通土","d":"起重机配抓土斗挖土,吊运出井,倾卸,纠偏清基及清理井周弃土,排水。","e":"100m³","f":"","g":9336.17,"h":0.655,"i":1807.17,"j":1256.15,"k":6272.85,"l":""},{"a":"QY_2024","b":"QY-304","c":"起重机配抓土斗 硬土","d":"起重机配抓土斗挖土,吊运出井,倾卸,纠偏清基及清理井周弃土,排水。","e":"100m³","f":"","g":12166.48,"h":0.655,"i":2768.78,"j":1256.15,"k":8141.55,"l":""},{"a":"QY_2024","b":"QY-305","c":"水上沉井下沉 水中","d":"按拆导向设备、清理导向船、供气、接高。","e":"100m³","f":"","g":27956.12,"h":0.104,"i":15079.71,"j":626.56,"k":12249.85,"l":""}]
- 2025-03-10 18:46:35,521 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_61.png
- 2025-03-10 18:46:35,521 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_62.png
- 2025-03-10 18:46:35,521 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_62.png
- 2025-03-10 18:47:07,389 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-306","c":"水上沉井下沉覆盖层","d":"吸泥出土、补水、纠偏。","e":"100m³","f":"","g":32102.42,"h":0,"i":2794.44,"j":0,"k":29307.98,"l":""},{"a":"QY_2024","b":"QY-307","c":"沉井下沉利用泥浆套","d":"吸泥出土、补水、纠偏。","e":"100m³","f":"","g":13421.16,"h":2.02,"i":3330.59,"j":574.25,"k":9516.32,"l":""},{"a":"QY_2024","b":"QY-308","c":"沉井下沉利用空气幕","d":"吸泥出土、补水、纠偏。","e":"100m³","f":"","g":24598.34,"h":0,"i":2792.8,"j":0,"k":21805.54,"l":""},{"a":"QY_2024","b":"QY-309","c":"水上沉井基底清理覆盖层","d":"拉风缆、补水、射水吸泥、清底、测量、潜水检查、脚手架制安拆。","e":"10m²","f":"","g":7993.12,"h":0.029,"i":447.24,"j":96.66,"k":7449.22,"l":""},{"a":"QY_2024","b":"QY-310","c":"水上沉井基底清理风化岩","d":"拉风缆、补水、射水吸泥、清底、测量、潜水检查、脚手架制安拆。","e":"10m²","f":"","g":18364.14,"h":0.029,"i":750.82,"j":96.66,"k":17516.66,"l":""}]
- 2025-03-10 18:47:07,478 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_62.png
- 2025-03-10 18:47:07,478 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_63.png
- 2025-03-10 18:47:07,478 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_63.png
- 2025-03-10 18:47:39,856 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-311","c":"陆上沉井封底 水下混凝土","d":"浇筑平台搭拆,混凝土浇筑。","e":"10m³","f":"HT-0(10.200);","g":1060.76,"h":0.056,"i":573,"j":220.15,"k":267.61,"l":""},{"a":"QY_2024","b":"QY-312","c":"陆上沉井封底 普通混凝土","d":"浇筑平台搭拆,混凝土浇筑。","e":"10m³","f":"HT-0(10.200);","g":935.06,"h":0.056,"i":447.24,"j":220.21,"k":267.61,"l":""},{"a":"QY_2024","b":"QY-313","c":"陆上沉井填充 混凝土","d":"混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":491.82,"h":0,"i":333.27,"j":7,"k":151.55,"l":""},{"a":"QY_2024","b":"QY-314","c":"陆上沉井填充 片石混凝土","d":"片石选修、清洗、摆放、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(8.670);","g":600.62,"h":3.96,"i":393.54,"j":114.17,"k":92.91,"l":""},{"a":"QY_2024","b":"QY-315","c":"陆上沉井填充 填砂","d":"填充砂。","e":"10m³","f":"","g":653.29,"h":15.011,"i":16.86,"j":636.43,"k":0,"l":""}]
- 2025-03-10 18:47:39,909 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_63.png
- 2025-03-10 18:47:39,909 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_64.png
- 2025-03-10 18:47:39,909 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_64.png
- 2025-03-10 18:48:09,229 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-316","c":"沉井盖板场内预制混凝土","d":"模板安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":1595.53,"h":0.062,"i":1242.22,"j":177.16,"k":176.15,"l":""},{"a":"QY_2024","b":"QY-317","c":"沉井盖板钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4323.34,"h":1.045,"i":526.75,"j":3640.99,"k":155.6,"l":""},{"a":"QY_2024","b":"QY-318","c":"沉井盖板安装 陆上","d":"安装井盖、找平、拌制砂浆、填塞挤缝、搭拆脚手架。","e":"10m³","f":"","g":2031.3,"h":0.224,"i":1487.47,"j":182.23,"k":361.6,"l":""},{"a":"QY_2024","b":"QY-319","c":"沉井盖板安装 水上","d":"成品下河、安装井盖、找平、拌制砂浆、填塞挤缝、搭拆脚手架。","e":"10m³","f":"","g":3237.25,"h":0.291,"i":1642.02,"j":466.02,"k":1129.21,"l":""},{"a":"QY_2024","b":"QY-320","c":"沉井内壁管路制安拆 泥浆管路","d":"压浆管路制安拆、压浆嘴埋设、喷嘴圈制安拆。","e":"1000m³混凝土","f":"","g":3704.44,"h":0.614,"i":644.16,"j":2639.35,"k":420.93,"l":""}]
- 2025-03-10 18:48:09,279 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_64.png
- 2025-03-10 18:48:09,279 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_65.png
- 2025-03-10 18:48:09,279 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_65.png
- 2025-03-10 18:48:44,106 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-321","c":"沉井内壁管路制安拆 空气幕管路","d":"管路制安拆,气龛钻孔及制安拆。","e":"1000m³混凝土","f":"","g":16907.55,"h":0.974,"i":8353.78,"j":7945.12,"k":608.65,"l":""},{"a":"QY_2024","b":"QY-322","c":"沉井内壁管路制安拆 射水水管","d":"管路制安拆,射水嘴埋设。","e":"1000m³混凝土","f":"","g":9092.02,"h":1.529,"i":1406.47,"j":6700.51,"k":985.04,"l":""},{"a":"QY_2024","b":"QY-323","c":"沉井内壁管路制安拆 探测管路∅250","d":"管路制安拆。","e":"1000m³混凝土","f":"","g":17123.77,"h":0.198,"i":4785.84,"j":11858.29,"k":479.64,"l":""},{"a":"QY_2024","b":"QY-324","c":"沉井外管路制安拆 泥浆、风、水干管路直径150","d":"法兰盘、管路制安拆及接高。","e":"100m","f":"","g":2578.48,"h":0.123,"i":1706.92,"j":670.78,"k":200.78,"l":""},{"a":"QY_2024","b":"QY-325","c":"沉井外管路制安拆 泥浆管路及地表围圈","d":"法兰盘、管路制安拆、地表围圈钢结构制安拆。","e":"墩","f":"","g":48789.2,"h":3.209,"i":19445.76,"j":23430.26,"k":5913.16,"l":""}]
- 2025-03-10 18:48:44,174 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_65.png
- 2025-03-10 18:48:44,174 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_66.png
- 2025-03-10 18:48:44,175 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_66.png
- 2025-03-10 18:49:12,252 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-326","c":"沉井外管路制安拆 空气幕管路","d":"管管路制安拆,地表围圈钢结构制安拆。","e":"墩","f":"","g":15562.69,"h":0.721,"i":4596.68,"j":10494.6,"k":471.41,"l":""},{"a":"QY_2024","b":"QY-327","c":"沉井外管路制安拆 钢沉井打气管路","d":"法兰盘、管路制安拆、分头器制安拆。","e":"墩","f":"","g":13940.38,"h":0.285,"i":5085.7,"j":7629.93,"k":1224.75,"l":""},{"a":"QY_2024","b":"QY-328","c":"沉井外管路制安拆 沉井射水吸泥管路 陆上","d":"法兰盘、管路制安拆及接高。","e":"套","f":"","g":25154.69,"h":3.726,"i":5376.6,"j":18608.42,"k":1169.67,"l":""},{"a":"QY_2024","b":"QY-329","c":"沉井外管路制安拆 沉井射水吸泥管路 水上","d":"法兰盘、管路制安拆及接高。","e":"套","f":"","g":37305.02,"h":5.361,"i":7137.96,"j":27661.41,"k":2505.65,"l":""},{"a":"QY_2024","b":"QY-330","c":"抖泥浆工作台","d":"钢木结构制安拆、泥浆管路安拆、混凝土拌制、浇筑、振捣及养护。","e":"座","f":"","g":45102.41,"h":29.029,"i":22138.31,"j":20981.71,"k":1982.39,"l":""}]
- 2025-03-10 18:49:12,324 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_66.png
- 2025-03-10 18:49:12,324 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_67.png
- 2025-03-10 18:49:12,324 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_67.png
- 2025-03-10 18:49:38,729 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-331","c":"扩大基础混凝土片石混凝土","d":"模板安拆,片石选修、清理、摆放,混凝土浇筑、振捣及养护,混凝土凿毛。","e":"10m³","f":"HT-0(8.670);","g":864.48,"h":4.044,"i":418.9,"j":391.58,"k":54,"l":""},{"a":"QY_2024","b":"QY-332","c":"扩大基础混凝土非泵送","d":"模板安拆,混凝土浇筑、振捣及养护,混凝土凿毛。","e":"10m³","f":"HT-0(10.200);","g":727.87,"h":0.048,"i":387.27,"j":283.65,"k":56.95,"l":""},{"a":"QY_2024","b":"QY-333","c":"扩大基础混凝土泵送","d":"模板安拆,混凝土浇筑、振捣及养护,混凝土凿毛。","e":"10m³","f":"HT-0(10.200);","g":748.83,"h":0.048,"i":356.54,"j":283.65,"k":108.64,"l":""},{"a":"QY_2024","b":"QY-334","c":"陆上承台混凝土非泵送","d":"钢模安拆,混凝土浇筑、振捣及养护,混凝土凿毛。","e":"10m³","f":"HT-0(10.200);","g":726.74,"h":0.048,"i":391.9,"j":277.89,"k":56.95,"l":""},{"a":"QY_2024","b":"QY-335","c":"陆上承台混凝土泵送","d":"钢模安拆,混凝土浇筑、振捣及养护,混凝土凿毛。","e":"10m³","f":"HT-0(10.200);","g":721.44,"h":0.048,"i":334.91,"j":277.89,"k":108.64,"l":""}]
- 2025-03-10 18:49:38,786 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_67.png
- 2025-03-10 18:49:38,786 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_68.png
- 2025-03-10 18:49:38,787 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_68.png
- 2025-03-10 18:50:19,364 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-336","c":"水中承台混凝土","d":"钢模安拆,混凝土拌制、浇筑、振捣及养护,混凝土凿毛。","e":"10m3","f":"HT-0(10.200);","g":996.72,"h":0.048,"i":380.86,"j":277.9,"k":337.96,"l":""},{"a":"QY_2024","b":"QY-337","c":"扩大基础 钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4441.49,"h":1.075,"i":498.71,"j":3838.58,"k":104.2,"l":""},{"a":"QY_2024","b":"QY-338","c":"陆上承台钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4425.91,"h":1.075,"i":477.97,"j":3838.58,"k":109.36,"l":""},{"a":"QY_2024","b":"QY-339","c":"水中承台 钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4915.28,"h":1.075,"i":477.97,"j":3838.58,"k":598.73,"l":""},{"a":"QY_2024","b":"QY-340","c":"冷却管制安","d":"管路制安,通水试验、降温,管内灌浆封堵。","e":"t","f":"","g":4641.46,"h":1.822,"i":410.1,"j":4184.08,"k":47.28,"l":""}]
- 2025-03-10 18:50:19,419 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_68.png
- 2025-03-10 18:50:19,419 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_69.png
- 2025-03-10 18:50:19,419 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_69.png
- 2025-03-10 18:50:46,103 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-341","c":"实体墩台身片石混凝土","d":"洗刷及埋置片石,模板安拆,混凝土浇筑、振捣及养护,施工接缝处理,脚手架搭拆。","e":"10m³","f":"HT-0(8.670);","g":1750.7,"h":4.106,"i":624.62,"j":815.91,"k":310.17,"l":""},{"a":"QY_2024","b":"QY-342","c":"实体墩台身陆上混凝土非泵送","d":"钢模安拆,混凝土浇筑、振捣及养护,施工接缝处理,脚手架搭拆。","e":"10m³","f":"HT-0(10.200);","g":1699.6,"h":0.11,"i":651.32,"j":707.2,"k":341.08,"l":""},{"a":"QY_2024","b":"QY-343","c":"实体墩台身陆上混凝土泵送","d":"钢模安拆,混凝土浇筑、振捣及养护,施工接缝处理,脚手架搭拆。","e":"10m³","f":"HT-0(10.200);","g":1639.23,"h":0.11,"i":625.06,"j":707.2,"k":306.97,"l":""},{"a":"QY_2024","b":"QY-344","c":"实体墩台身水上混凝土","d":"钢模安拆,混凝土浇筑、振捣及养护,施工接缝处理,脚手架搭拆。","e":"10m³","f":"HT-0(10.200);","g":1837.73,"h":0.11,"i":635.66,"j":707.2,"k":494.87,"l":""},{"a":"QY_2024","b":"QY-345","c":"陆上墩台身钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4455.23,"h":1.031,"i":498.71,"j":3709.98,"k":246.54,"l":""}]
- 2025-03-10 18:50:46,129 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_69.png
- 2025-03-10 18:50:46,129 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_70.png
- 2025-03-10 18:50:46,129 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_70.png
- 2025-03-10 18:51:20,045 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-346","c":"水上墩台身钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4892.59,"h":1.031,"i":507.51,"j":3709.98,"k":675.1,"l":""},{"a":"QY_2024","b":"QY-347","c":"陆上墩身混凝土 墩高(m) ≤30","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3343.93,"h":0.183,"i":1484.19,"j":1397.7,"k":462.04,"l":""},{"a":"QY_2024","b":"QY-348","c":"陆上墩身混凝土 墩高(m) ≤50","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3525.15,"h":0.198,"i":1134.05,"j":728.94,"k":1662.16,"l":""},{"a":"QY_2024","b":"QY-349","c":"陆上墩身混凝土 墩高(m) ≤70","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3810.16,"h":0.189,"i":1929.79,"j":1082.85,"k":797.52,"l":""},{"a":"QY_2024","b":"QY-350","c":"陆上墩身混凝土 墩高(m) ≤90","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":4005.28,"h":0.186,"i":2101.2,"j":1061.47,"k":842.61,"l":""}]
- 2025-03-10 18:51:20,116 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_70.png
- 2025-03-10 18:51:20,116 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_71.png
- 2025-03-10 18:51:20,117 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_71.png
- 2025-03-10 18:52:17,143 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-351","c":"陆上墩身混凝土 墩高(m) ≤110","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":4187.61,"h":0.179,"i":2186.98,"j":1025.27,"k":975.36,"l":""},{"a":"QY_2024","b":"QY-352","c":"陆上墩身混凝土 墩高(m) ≤140","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":4606.78,"h":0.174,"i":2243.07,"j":994.2,"k":1369.51,"l":""},{"a":"QY_2024","b":"QY-353","c":"水上墩身混凝土 墩高(m) ≤30","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":3653.35,"h":0.189,"i":1609.95,"j":1405.07,"k":638.33,"l":""},{"a":"QY_2024","b":"QY-354","c":"水上墩身混凝土 墩高(m) ≤50","d":"模板安拆,工作平台制安拆,模板提升、定位,涂脱模剂,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":3964.8,"h":0.198,"i":1756,"j":1118.64,"k":990.16,"l":""},{"a":"QY_2024","b":"QY-355","c":"陆上墩身钢筋 墩高(m) ≤30","d":"钢筋制作、车丝、绑扎、套筒连接、安装、定位、校正。","e":"t","f":"","g":5388.96,"h":1.015,"i":1166.59,"j":3734.86,"k":487.51,"l":""}]
- 2025-03-10 18:52:17,216 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_71.png
- 2025-03-10 18:52:17,216 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_72.png
- 2025-03-10 18:52:17,216 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_72.png
- 2025-03-10 18:52:50,670 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-356","c":"陆上墩身钢筋 墩高(m) ≤50","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5500.28,"h":1.015,"i":1155.4,"j":3734.86,"k":610.02,"l":""},{"a":"QY_2024","b":"QY-357","c":"陆上墩身钢筋 墩高(m) ≤70","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5594.45,"h":1.015,"i":1225.96,"j":3734.86,"k":633.63,"l":""},{"a":"QY_2024","b":"QY-358","c":"陆上墩身钢筋 墩高(m) ≤90","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5771.39,"h":1.015,"i":1347.24,"j":3734.86,"k":689.29,"l":""},{"a":"QY_2024","b":"QY-359","c":"陆上墩身钢筋 墩高(m) ≤110","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":6015.03,"h":1.015,"i":1484.34,"j":3734.86,"k":795.83,"l":""},{"a":"QY_2024","b":"QY-360","c":"陆上墩身钢筋 墩高(m) ≤140","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":6896.74,"h":1.015,"i":1634.86,"j":3734.86,"k":1527.02,"l":""}]
- 2025-03-10 18:52:50,736 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_72.png
- 2025-03-10 18:52:50,736 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_73.png
- 2025-03-10 18:52:50,736 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_73.png
- 2025-03-10 18:53:21,892 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-361","c":"水上墩身钢筋 墩高(m) ≤30","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5562.23,"h":1.015,"i":1174.79,"j":3735.25,"k":652.19,"l":""},{"a":"QY_2024","b":"QY-362","c":"水上墩身钢筋 墩高(m) ≤50","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5986.74,"h":1.015,"i":1210.15,"j":3735.25,"k":1041.34,"l":""},{"a":"QY_2024","b":"QY-363","c":"板式桥墩墩身混凝土 泵送","d":"脚手架搭拆,钢模板安拆,混凝土浇筑、振捣及养护,施工接缝处理。","e":"10m³","f":"HT-0(10.200);","g":1492.16,"h":0.096,"i":683.24,"j":536.89,"k":272.03,"l":""},{"a":"QY_2024","b":"QY-364","c":"板式桥墩墩身混凝土 泵送","d":"脚手架搭拆,钢模板安拆,混凝土浇筑、振捣及养护,施工接缝处理。","e":"10m³","f":"HT-0(10.200);","g":1398.49,"h":0.096,"i":629.54,"j":536.67,"k":232.28,"l":""},{"a":"QY_2024","b":"QY-365","c":"板式桥墩墩身钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4572.15,"h":1.035,"i":636.25,"j":3739.45,"k":196.45,"l":""}]
- 2025-03-10 18:53:21,976 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_73.png
- 2025-03-10 18:53:21,976 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_74.png
- 2025-03-10 18:53:21,976 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_74.png
- 2025-03-10 18:54:14,518 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-366","c":"陆上顶帽混凝土墩高(m)≤30","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3428.74,"h":0.071,"i":2370.02,"j":549.28,"k":509.44,"l":""},{"a":"QY_2024","b":"QY-367","c":"陆上顶帽混凝土墩高(m)≤50","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3755.05,"h":0.071,"i":2539.04,"j":549.28,"k":666.73,"l":""},{"a":"QY_2024","b":"QY-368","c":"陆上顶帽混凝土墩高(m)≤70","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3927.35,"h":0.071,"i":2669.43,"j":549.28,"k":708.64,"l":""},{"a":"QY_2024","b":"QY-369","c":"陆上顶帽混凝土墩高(m)≤90","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":4491.63,"h":0.071,"i":3133.36,"j":549.28,"k":808.97,"l":""},{"a":"QY_2024","b":"QY-370","c":"陆上顶帽混凝土墩高(m)≤110","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":5142.94,"h":0.071,"i":3482.91,"j":549.28,"k":1110.75,"l":""}]
- 2025-03-10 18:54:14,586 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_74.png
- 2025-03-10 18:54:14,586 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_75.png
- 2025-03-10 18:54:14,586 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_75.png
- 2025-03-10 18:55:02,003 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-371","c":"陆上顶帽混凝土墩高(m)≤140","d":"模板安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":6348.9,"h":0.071,"i":3831.24,"j":549.28,"k":1968.38,"l":""},{"a":"QY_2024","b":"QY-372","c":"水上顶帽混凝土墩高(m)≤30","d":"模板制安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":3687.76,"h":0.071,"i":2348.99,"j":549.28,"k":789.49,"l":""},{"a":"QY_2024","b":"QY-373","c":"水上顶帽混凝土墩高(m)≤50","d":"模板制安拆、钢构件制安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":4218.59,"h":0.071,"i":2397.32,"j":549.28,"k":1271.99,"l":""},{"a":"QY_2024","b":"QY-374","c":"陆上顶帽钢筋墩高(m)≤30","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":5645.2,"h":1.035,"i":1251.22,"j":3722.22,"k":671.66,"l":""},{"a":"QY_2024","b":"QY-375","c":"陆上顶帽钢筋墩高(m)≤50","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":5733.59,"h":1.035,"i":1277.88,"j":3722.22,"k":733.49,"l":""}]
- 2025-03-10 18:55:02,081 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_75.png
- 2025-03-10 18:55:02,081 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_76.png
- 2025-03-10 18:55:02,081 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_76.png
- 2025-03-10 18:55:27,722 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-376","c":"陆上顶帽钢筋墩高(m)≤70","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":5995.79,"h":1.035,"i":1430.64,"j":3722.22,"k":842.93,"l":""},{"a":"QY_2024","b":"QY-377","c":"陆上顶帽钢筋墩高(m)≤90","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":6261.89,"h":1.035,"i":1546.7,"j":3722.22,"k":992.97,"l":""},{"a":"QY_2024","b":"QY-378","c":"陆上顶帽钢筋墩高(m)≤110","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":6607.65,"h":1.035,"i":1702.89,"j":3722.22,"k":1182.54,"l":""},{"a":"QY_2024","b":"QY-379","c":"陆上顶帽钢筋墩高(m)≤140","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":7492.94,"h":1.035,"i":1875.49,"j":3722.22,"k":1895.23,"l":""},{"a":"QY_2024","b":"QY-380","c":"水上顶帽钢筋墩高(m)≤30","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":5822.86,"h":1.035,"i":1264.45,"j":3722.22,"k":836.19,"l":""}]
- 2025-03-10 18:55:27,802 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_76.png
- 2025-03-10 18:55:27,803 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_77.png
- 2025-03-10 18:55:27,803 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_77.png
- 2025-03-10 18:56:24,290 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-381","c":"水上顶帽钢筋墩高(m)≤50","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":6147.47,"h":1.035,"i":1346.5,"j":3722.22,"k":1078.75,"l":""},{"a":"QY_2024","b":"QY-382","c":"框架墩墩身混凝土非泵送","d":"支架及脚手架搭拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":2893.49,"h":0.122,"i":1908.16,"j":712.37,"k":272.96,"l":""},{"a":"QY_2024","b":"QY-383","c":"框架墩墩身混凝土泵送","d":"支架及脚手架搭拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":2387.91,"h":0.122,"i":1432.13,"j":718.79,"k":236.99,"l":""},{"a":"QY_2024","b":"QY-384","c":"框架墩墩帽混凝土非泵送","d":"支架及脚手架搭拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":5034.9,"h":0.354,"i":2630.19,"j":2035.2,"k":369.51,"l":""},{"a":"QY_2024","b":"QY-385","c":"框架墩墩帽混凝土泵送","d":"支架及脚手架搭拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":4712.36,"h":0.354,"i":2346.45,"j":2034.98,"k":330.93,"l":""}]
- 2025-03-10 18:56:24,356 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_77.png
- 2025-03-10 18:56:24,356 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_78.png
- 2025-03-10 18:56:24,356 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_78.png
- 2025-03-10 18:57:14,988 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-386","c":"框架墩墩身钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4620.53,"h":1.028,"i":736.65,"j":3684.18,"k":199.7,"l":""},{"a":"QY_2024","b":"QY-387","c":"框架墩墩帽钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4903.11,"h":1.033,"i":938.34,"j":3729.54,"k":235.23,"l":""},{"a":"QY_2024","b":"QY-388","c":"拼装式双柱桥墩 立柱混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,成品堆放。","e":"10m³","f":"HT-0(10.100);","g":1935.57,"h":0.038,"i":1153.91,"j":301.67,"k":479.99,"l":""},{"a":"QY_2024","b":"QY-389","c":"拼装式双柱桥墩 帽梁混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,成品堆放。","e":"10m³","f":"HT-0(10.100);","g":1213.75,"h":0.038,"i":668.33,"j":272.89,"k":272.53,"l":""},{"a":"QY_2024","b":"QY-390","c":"拼装式双柱桥墩 立柱钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4573.85,"h":1.032,"i":637.15,"j":3727.96,"k":208.74,"l":""}]
- 2025-03-10 18:57:15,028 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_78.png
- 2025-03-10 18:57:15,029 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_79.png
- 2025-03-10 18:57:15,029 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_79.png
- 2025-03-10 18:58:02,427 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-391","c":"拼装式双柱桥墩帽梁钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4515.66,"h":1.027,"i":631.63,"j":3717.49,"k":166.54,"l":""},{"a":"QY_2024","b":"QY-392","c":"拼装式双柱桥墩安装预构件","d":"预制构件吊装、处理吊环孔。","e":"10m³","f":"HT-0(10.200);","g":1563.32,"h":0.052,"i":669.52,"j":115.89,"k":777.91,"l":""},{"a":"QY_2024","b":"QY-393","c":"托盘及台顶混凝土非泵送","d":"支架制安拆、模板安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":2371.58,"h":0.122,"i":733.26,"j":428.17,"k":"","l":""},{"a":"QY_2024","b":"QY-394","c":"托盘及台顶混凝土泵送","d":"支架制安拆、模板安拆、混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200);","g":2056.21,"h":0.122,"i":1052.91,"j":733.26,"k":270.04,"l":""},{"a":"QY_2024","b":"QY-395","c":"托盘及台顶钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":5210.89,"h":1.035,"i":1238.49,"j":3738.89,"k":233.51,"l":""}]
- 2025-03-10 18:58:02,450 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 18:58:02,468 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_79.png
- 2025-03-10 18:58:02,468 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_80.png
- 2025-03-10 18:58:02,469 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_80.png
- 2025-03-10 18:58:35,997 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-396","c":"通咋槽混凝土非泵送","d":"模板制安拆、混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":3648.55,"h":0.108,"i":3019.55,"j":348.78,"k":280.22,"l":""},{"a":"QY_2024","b":"QY-397","c":"通咋槽混凝土泵送","d":"模板制安拆、混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":3341.26,"h":0.108,"i":2747.3,"j":348.66,"k":245.3,"l":""},{"a":"QY_2024","b":"QY-398","c":"耳墙混凝土非泵送","d":"模板制安拆、混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":2422.16,"h":0.175,"i":1681.41,"j":457.85,"k":282.9,"l":""},{"a":"QY_2024","b":"QY-399","c":"耳墙混凝土泵送","d":"模板制安拆、混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":2114.69,"h":0.175,"i":1408.86,"j":457.85,"k":247.98,"l":""},{"a":"QY_2024","b":"QY-400","c":"通咋槽钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4704.11,"h":1.027,"i":978.47,"j":3626.1,"k":99.54,"l":""}]
- 2025-03-10 18:58:36,064 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_80.png
- 2025-03-10 18:58:36,064 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_81.png
- 2025-03-10 18:58:36,064 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_81.png
- 2025-03-10 18:59:00,714 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-401","c":"耳墙钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4715.43,"h":1.031,"i":987.42,"j":3612.9,"k":115.11,"l":""},{"a":"QY_2024","b":"QY-402","c":"塔座混凝土","d":"脚手架制安拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":2234.97,"h":0.059,"i":864.5,"j":456.09,"k":914.38,"l":""},{"a":"QY_2024","b":"QY-403","c":"下塔柱混凝土","d":"脚手架制安拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":7440.78,"h":0.302,"i":3920.3,"j":1606.44,"k":1914.04,"l":""},{"a":"QY_2024","b":"QY-404","c":"横梁混凝土","d":"脚手架制安拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":9699.91,"h":0.838,"i":4420.8,"j":2718.2,"k":2560.91,"l":""},{"a":"QY_2024","b":"QY-405","c":"中塔柱混凝土","d":"脚手架制安拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m³","f":"HT-0(10.200)","g":8015.57,"h":0.128,"i":4564.76,"j":1280.25,"k":2170.56,"l":""}]
- 2025-03-10 18:59:00,783 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_81.png
- 2025-03-10 18:59:00,783 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_82.png
- 2025-03-10 18:59:00,783 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_82.png
- 2025-03-10 18:59:27,034 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-406","c":"上塔柱 混凝土","d":"脚手架制安拆,模板安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":13686.74,"h":0.54,"i":7662.78,"j":2193.26,"k":3830.7,"l":""},{"a":"QY_2024","b":"QY-407","c":"塔座 钢筋","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":6898.45,"h":1.075,"i":931.03,"j":4070.7,"k":1896.72,"l":""},{"a":"QY_2024","b":"QY-408","c":"下塔柱 钢筋","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5555.07,"h":1.033,"i":944.16,"j":3727.07,"k":883.67,"l":""},{"a":"QY_2024","b":"QY-409","c":"横梁 钢筋","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5794.03,"h":1.026,"i":787.07,"j":3705.44,"k":1291.52,"l":""},{"a":"QY_2024","b":"QY-410","c":"中塔柱 钢筋","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":5735.59,"h":1.021,"i":1041.28,"j":3687.55,"k":1006.76,"l":""}]
- 2025-03-10 18:59:27,099 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_82.png
- 2025-03-10 18:59:27,099 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_83.png
- 2025-03-10 18:59:27,099 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_83.png
- 2025-03-10 19:00:18,263 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-411","c":"上塔柱钢筋","d":"钢筋制作、车丝、绑扎、套筒连接、安放、定位、校正。","e":"t","f":"","g":6608.71,"h":1.021,"i":1522.98,"j":3689.24,"k":1396.49,"l":""},{"a":"QY_2024","b":"QY-412","c":"劲性骨架","d":"劲性钢骨架制安。","e":"t","f":"","g":9494.23,"h":1.05,"i":2141.78,"j":4133.97,"k":3218.48,"l":""},{"a":"QY_2024","b":"QY-413","c":"预应力高强钢丝(中5) 制安","d":"制安波纹管、支承钢板,高强度钢丝下料、制、安、张拉,孔道压浆,切割钢丝头。","e":"10t","f":"","g":79638.42,"h":14.642,"i":25111.62,"j":52402.53,"k":2124.27,"l":""},{"a":"QY_2024","b":"QY-414","c":"预应力高强钢丝(中5) 张拉","d":"制安波纹管、支承钢板,高强度钢丝下料、制、安、张拉,孔道压浆,切割钢丝头。","e":"100束","f":"","g":29254.16,"h":0,"i":5902.31,"j":17958.72,"k":5393.13,"l":""},{"a":"QY_2024","b":"QY-415","c":"预应力高强钢丝(中5) 重复张拉","d":"制安波纹管、支承钢板,高强度钢丝下料、制、安、张拉,孔道压浆,切割钢丝头。","e":"100束","f":"","g":10901,"h":0,"i":5507.87,"j":0,"k":5393.13,"l":""}]
- 2025-03-10 19:00:18,336 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_83.png
- 2025-03-10 19:00:18,336 - INFO - 开始处理图片: ./temp_files/images/output/img/02/part_84.png
- 2025-03-10 19:00:18,337 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/02/part_84.png
- 2025-03-10 19:00:29,054 - INFO - 开始保存图片内到数据库:[{"a":"QV_2024","b":"QY-416","c":"水上混凝土搅拌站100m3/h","d":"混凝土材料水上运输,混凝土搅拌船就位,配料、出料、清洗。","e":"10m³","f":"HT-0(10.200);","g":1147.06,"h":0,"i":77.28,"j":1.1,"k":1068.68,"l":""},{"a":"QV_2024","b":"QY-417","c":"水上混凝土搅拌站150m3/h","d":"混凝土材料水上运输,混凝土搅拌船就位,配料、出料、清洗。","e":"10m³","f":"HT-0(10.200);","g":1259.18,"h":0,"i":37.44,"j":1.1,"k":1220.64,"l":""}]
- 2025-03-10 19:00:29,084 - INFO - 图片处理完成: ./temp_files/images/output/img/02/part_84.png
- 2025-03-10 19:00:29,084 - INFO - 目录处理完成: ./temp_files/images/output/img/02/
- 2025-03-10 19:00:29,084 - INFO - 开始处理目录: ./temp_files/images/output/img/03/
- 2025-03-10 19:00:29,084 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_01.png
- 2025-03-10 19:00:29,084 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_01.png
- 2025-03-10 19:00:57,548 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-418","c":"跨度L≤40m 拱圈混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200):","g":2965.93,"h":0.403,"i":1621.14,"j":943.71,"k":401.08,"l":""},{"a":"QY_2024","b":"QY-419","c":"跨度L≤40m 拱上墙柱混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200):","g":4941.13,"h":0.659,"i":2542.03,"j":1554.48,"k":844.62,"l":""},{"a":"QY_2024","b":"QY-420","c":"跨度L≤40m 桥面板混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200):","g":3729.48,"h":0.359,"i":2007.52,"j":849.84,"k":872.12,"l":""},{"a":"QY_2024","b":"QY-421","c":"跨度L≤40m 拱圈混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200):","g":5056.43,"h":0.456,"i":3036.05,"j":1075.45,"k":942.93,"l":""},{"a":"QY_2024","b":"QY-422","c":"跨度L≤40m 拱上墙柱混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200):","g":9324.13,"h":0.97,"i":5214.74,"j":2284.37,"k":1825.02,"l":""}]
- 2025-03-10 19:00:57,627 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_01.png
- 2025-03-10 19:00:57,627 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_02.png
- 2025-03-10 19:00:57,627 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_02.png
- 2025-03-10 19:01:29,500 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-423","c":"跨度L≤60m 桥面板 混凝土","d":"模板制安拆;混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":5632.9,"h":0.515,"i":3324.77,"j":1207.74,"k":1100.39,"l":""},{"a":"QY_2024","b":"QY-424","c":"拱圈、拱上墙柱钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4440.74,"h":1.034,"i":660.42,"j":3609.33,"k":170.99,"l":""},{"a":"QY_2024","b":"QY-425","c":"桥面板、拱肋钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4783.44,"h":1.031,"i":876.88,"j":3640.56,"k":266,"l":""},{"a":"QY_2024","b":"QY-426","c":"墩上结构L≤60m 混凝土","d":"模板制安拆;混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":4446.82,"h":0.517,"i":2143.72,"j":1202.71,"k":1100.39,"l":""},{"a":"QY_2024","b":"QY-427","c":"墩上结构L≤60m 钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4511.28,"h":1.03,"i":668.33,"j":3637.05,"k":205.9,"l":""}]
- 2025-03-10 19:01:29,608 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_02.png
- 2025-03-10 19:01:29,608 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_03.png
- 2025-03-10 19:01:29,608 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_03.png
- 2025-03-10 19:02:14,820 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-428","c":"拱上填筑混凝土","d":"混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":992.03,"h":0,"i":689.06,"j":32.91,"k":270.06,"l":""},{"a":"QY_2024","b":"QY-429","c":"拱上填筑片石混凝土","d":"洗石及埋置片石、混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(8.670);","g":1181.16,"h":3.996,"i":770.07,"j":141.03,"k":270.06,"l":""},{"a":"QY_2024","b":"QY-430","c":"钢拱架跨度(m)≤25","d":"钢拱架:拱架搭拆,拱架上梳形木及拱上工作台和栏杆制安拆。","e":"t","f":"","g":2064.05,"h":0.08,"i":1724.52,"j":214.7,"k":124.83,"l":""},{"a":"QY_2024","b":"QY-431","c":"钢拱架跨度(m)≤53","d":"钢拱架:拱架搭拆,拱架上梳形木及拱上工作台和栏杆制安拆。","e":"t","f":"","g":1961.43,"h":0.126,"i":1173.15,"j":336.65,"k":451.63,"l":""},{"a":"QY_2024","b":"QY-432","c":"钢拱架跨度(m)>53","d":"钢拱架:拱架搭拆,拱架上梳形木及拱上工作台和栏杆制安拆。","e":"t","f":"","g":1528.42,"h":0.129,"i":735.01,"j":341.75,"k":451.66,"l":""}]
- 2025-03-10 19:02:14,887 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_03.png
- 2025-03-10 19:02:14,887 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_04.png
- 2025-03-10 19:02:14,887 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_04.png
- 2025-03-10 19:02:46,200 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-433","c":"预制T梁 混凝土","d":"模板安拆、排水管预埋、混凝土场内运输、浇筑、振捣、覆盖、洒水养护。","e":"10m3","f":"HT-0(10.100):","g":3029.68,"h":0.151,"i":1362.61,"j":1322.79,"k":344.28,"l":""},{"a":"QY_2024","b":"QY-434","c":"预制T梁 钢筋","d":"钢筋调直、切断、弯制、绑扎、焊接、吊装、定位、校正。","e":"t","f":"","g":4649.52,"h":1.038,"i":495.43,"j":3948.81,"k":205.28,"l":""},{"a":"QY_2024","b":"QY-435","c":"预制T梁场内移梁门式起重机≤2×80t","d":"准备、安装垫板、吊具、提梁、移梁、对中超平、落梁就位、拆除吊具、吊机空回。","e":"片","f":"","g":866.60,"h":0.019,"i":288.51,"j":66.1,"k":511.45,"l":""},{"a":"QY_2024","b":"QY-436","c":"预制箱梁混凝土 单线梁","d":"模板安拆、排水管预埋、混凝土场内运输、浇筑、振捣、覆盖、洒水养护。","e":"10m3","f":"HT-0(10.100):","g":2815.1,"h":0.123,"i":1368.03,"j":1104.67,"k":341.4,"l":""},{"a":"QY_2024","b":"QY-437","c":"预制箱梁混凝土 双线梁","d":"模板安拆、排水管预埋、混凝土场内运输、浇筑、振捣、覆盖、洒水养护。","e":"10m3","f":"HT-0(10.100):","g":2065.61,"h":0.081,"i":911.51,"j":788.79,"k":365.31,"l":""}]
- 2025-03-10 19:02:46,290 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_04.png
- 2025-03-10 19:02:46,290 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_05.png
- 2025-03-10 19:02:46,290 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_05.png
- 2025-03-10 19:03:28,361 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-438","c":"预制箱梁钢筋","d":"钢筋调直、切断、弯制、绑扎、焊接、吊装、定位、校正。","e":"t","f":"","g":4597.1,"h":1.036,"i":461.87,"j":4029.93,"k":105.3,"l":""},{"a":"QY_2024","b":"QY-439","c":"搬梁机场内搬梁≤600t 轮胎式","d":"准备、对孔、安装吊具、提梁、纵横移梁、落梁及支垫、吊具拆除、搬梁机空回。","e":"孔","f":"","g":6165.29,"h":0,"i":411.02,"j":15.81,"k":5738.46,"l":""},{"a":"QY_2024","b":"QY-440","c":"搬梁机场内搬梁≤600t 轮轨式","d":"准备、对孔、安装吊具、提梁、纵横移梁、落梁及支垫、吊具拆除、搬梁机空回。","e":"孔","f":"","g":3389.88,"h":0,"i":411.02,"j":15.81,"k":2962.85,"l":""},{"a":"QY_2024","b":"QY-441","c":"搬梁机场内搬梁≤900t 轮胎式 单线梁","d":"准备、对孔、安装吊具、提梁、纵横移梁、落梁及支垫、吊具拆除、搬梁机空回。","e":"孔","f":"","g":11019.38,"h":0,"i":389.13,"j":15.81,"k":10614.44,"l":""},{"a":"QY_2024","b":"QY-442","c":"搬梁机场内搬梁≤900t 轮胎式 双线梁","d":"准备、对孔、安装吊具、提梁、纵横移梁、落梁及支垫、吊具拆除、搬梁机空回。","e":"孔","f":"","g":11730.67,"h":0,"i":410.05,"j":15.81,"k":11304.81,"l":""}]
- 2025-03-10 19:03:28,439 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_05.png
- 2025-03-10 19:03:28,439 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_06.png
- 2025-03-10 19:03:28,439 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_06.png
- 2025-03-10 19:04:05,076 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-443","c":"搬梁机场内搬梁≤900t轮轨式单线梁","d":"准备、对孔、安装吊具,提梁,纵横移梁,落梁及支垫,吊具拆除,搬梁机空回。","e":"孔","f":"","g":4478.85,"h":0,"i":524.63,"j":15.81,"k":3938.41,"l":""},{"a":"QY_2024","b":"QY-444","c":"搬梁机场内搬梁≤900t轮轨式双线梁","d":"准备、对孔、安装吊具,提梁,纵横移梁,落梁及支垫,吊具拆除,搬梁机空回。","e":"孔","f":"","g":4762.37,"h":0,"i":551.99,"j":15.81,"k":4194.57,"l":""},{"a":"QY_2024","b":"QY-445","c":"轮轨式移梁台车场内移梁单线梁","d":"移梁准备,移梁台车就位,台车顶升梁体,平稳检测,移梁,就位落梁。","e":"孔次","f":"","g":270.94,"h":0.01,"i":56.16,"j":43.71,"k":171.07,"l":""},{"a":"QY_2024","b":"QY-446","c":"轮轨式移梁台车场内移梁双线梁","d":"移梁准备,移梁台车就位,台车顶升梁体,平稳检测,移梁,就位落梁。","e":"孔次","f":"","g":284.9,"h":0.01,"i":58.9,"j":45.6,"k":180.4,"l":""},{"a":"QY_2024","b":"QY-447","c":"安装、调试及拆除轮轨式搬梁机≤600t","d":"安装、调试、拆除","e":"次","f":"","g":171309.266,"h":0.324,"i":40586.39,"j":1374.99,"k":129347.891,"l":""}]
- 2025-03-10 19:04:05,157 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_06.png
- 2025-03-10 19:04:05,157 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_07.png
- 2025-03-10 19:04:05,158 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_07.png
- 2025-03-10 19:04:29,520 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-448","c":"安装、调试及拆除 轮轨式搬梁机≤600t","d":"安装、调试、拆除","e":"次","f":"164438.578","g":0.324,"h":40586.39,"i":1374.99,"j":122477.2,"k":"","l":""},{"a":"QY_2024","b":"QY-449","c":"安装、调试及拆除 轮胎式搬梁机≤900t","d":"安装、调试、拆除","e":"次","f":"228454.609","g":0.431,"h":67241.38,"i":2131.11,"j":159082.125,"k":"","l":""},{"a":"QY_2024","b":"QY-450","c":"安装、调试及拆除 轮轨式搬梁机≤900t","d":"安装、调试、拆除","e":"次","f":"219923.516","g":0.431,"h":54115.13,"i":1833.16,"j":163975.063,"k":"","l":""},{"a":"QY_2024","b":"QY-451","c":"安装、调试及拆除 轮轨式提梁机≥2×450t","d":"安装、调试、拆除","e":"次","f":"320549.563","g":1.353,"h":94723.24,"i":5636.24,"j":220190.063,"k":"","l":""},{"a":"QY_2024","b":"QY-452","c":"预制混凝土梁蒸汽养护 燃气锅炉","d":"安装养护罩,安装蒸汽管路,安装蒸养系统,安放温度表,送汽,测温、记录、恒温养护、降温、停汽、拆移养护罩。","e":"10m3构件","f":"585.79","g":0,"h":244.75,"i":211.52,"j":129.52,"k":"","l":""}]
- 2025-03-10 19:04:29,535 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:04:29,539 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:04:29,566 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:04:29,582 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:04:29,586 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:04:29,588 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_07.png
- 2025-03-10 19:04:29,588 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_08.png
- 2025-03-10 19:04:29,588 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_08.png
- 2025-03-10 19:04:59,572 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-453","c":"预制混凝土梁蒸汽养护燃油锅炉","d":"安装养护罩,安装蒸汽管路,安装蒸养系统、安放温度表,送汽、测温、记录、恒温养护、降温、停汽、拆移养护罩。","e":"10m3构件","f":"","g":716.66,"h":0,"i":244.75,"j":211.52,"k":260.39,"l":""},{"a":"QY_2024","b":"QY-454","c":"支架法现浇预应力混凝土箱梁混凝土","d":"模板处理、拼缝处理、模板安装、调整、验收、砼浇筑准备工作、模板降温、灌主、振捣、收平、清理、凿毛、覆盖、洒水、模板拆除。","e":"10m3","f":"HT-0(10.200):","g":5788.34,"h":0.266,"i":3056.38,"j":2051.95,"k":680.01,"l":""},{"a":"QY_2024","b":"QY-455","c":"支架法现浇预应力混凝土箱梁钢筋","d":"钢筋调直、切断、弯制、焊接、绑扎、吊装、定位、校正。","e":"t","f":"","g":5456.1,"h":1.04,"i":1222.75,"j":4014.97,"k":218.38,"l":""},{"a":"QY_2024","b":"QY-456","c":"移动模架现浇混凝土","d":"模板安拆、混凝土浇注、振捣及覆盖、养护。","e":"10m3","f":"HT-0(10.200):","g":7080.07,"h":0.385,"i":2334.61,"j":2246.42,"k":2499.04,"l":""},{"a":"QY_2024","b":"QY-457","c":"移动模架安装、调试、拆除","d":"移动模架造桥机安装、调试、拆除。","e":"10t·次","f":"","g":10175.83,"h":0.042,"i":3670.01,"j":216.55,"k":6289.27,"l":""}]
- 2025-03-10 19:04:59,655 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_08.png
- 2025-03-10 19:04:59,655 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_09.png
- 2025-03-10 19:04:59,655 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_09.png
- 2025-03-10 19:06:00,160 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-458","c":"移动模架纵向移位","d":"准备,支墩拆搭,外模下移,纵移走行,调整就位,制梁准备。","e":"10m","f":"","g":9075.02,"h":0.308,"i":6915,"j":871.48,"k":1288.54,"l":""},{"a":"QY_2024","b":"QY-459","c":"横向钢绞线制安及张拉 3根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":118118.992,"h":19.062,"i":18886.43,"j":98071.65,"k":1158.91,"l":""},{"a":"QY_2024","b":"QY-460","c":"横向钢绞线制安及张拉 3根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":2749.6,"h":0.116,"i":1484.19,"j":1211.53,"k":53.88,"l":""},{"a":"QY_2024","b":"QY-461","c":"横向钢绞线制安及张拉 4根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":104583.961,"h":16.618,"i":15202.78,"j":86394.14,"k":987.04,"l":""},{"a":"QY_2024","b":"QY-462","c":"横向钢绞线制安及张拉 4根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":3253.85,"h":0.149,"i":1511.04,"j":1680.79,"k":62.02,"l":""}]
- 2025-03-10 19:06:00,250 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_09.png
- 2025-03-10 19:06:00,250 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_10.png
- 2025-03-10 19:06:00,250 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_10.png
- 2025-03-10 19:06:46,481 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-463","c":"钢绞线制安及张拉 4根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":93342.15,"h":17.016,"i":11209.64,"j":80375.87,"k":1756.64,"l":""},{"a":"QY_2024","b":"QY-464","c":"钢绞线制安及张拉 4根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":2992.43,"h":0.131,"i":1045.5,"j":1613.69,"k":333.24,"l":""},{"a":"QY_2024","b":"QY-465","c":"钢绞线制安及张拉 6根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":68133.4,"h":16.377,"i":4786.3,"j":62100.99,"k":1246.11,"l":""},{"a":"QY_2024","b":"QY-466","c":"钢绞线制安及张拉 6根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":3811.43,"h":0.196,"i":1004.03,"j":2420.54,"k":386.86,"l":""},{"a":"QY_2024","b":"QY-467","c":"钢绞线制安及张拉 7根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":66779.05,"h":16.232,"i":4826.27,"j":60801.07,"k":1151.71,"l":""}]
- 2025-03-10 19:06:46,545 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_10.png
- 2025-03-10 19:06:46,545 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_11.png
- 2025-03-10 19:06:46,545 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_11.png
- 2025-03-10 19:07:24,834 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-468","c":"钢绞线制安及张拉 7根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":4428.4,"h":0.269,"i":1056.49,"j":2966.76,"k":405.15,"l":""},{"a":"QY_2024","b":"QY-469","c":"钢绞线制安及张拉 8根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":65074.96,"h":16.001,"i":4284,"j":59766.73,"k":1024.23,"l":""},{"a":"QY_2024","b":"QY-470","c":"钢绞线制安及张拉 8根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":4780.56,"h":0.3,"i":999.21,"j":3370.11,"k":411.24,"l":""},{"a":"QY_2024","b":"QY-471","c":"钢绞线制安及张拉 9根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":61689.74,"h":15.767,"i":3376.33,"j":57341.69,"k":969.72,"l":""},{"a":"QY_2024","b":"QY-472","c":"钢绞线制安及张拉 9根1束 张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":5195.05,"h":0.611,"i":989.36,"j":3788.46,"k":417.23,"l":""}]
- 2025-03-10 19:07:24,904 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_11.png
- 2025-03-10 19:07:24,904 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_12.png
- 2025-03-10 19:07:24,904 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_12.png
- 2025-03-10 19:07:50,084 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-473","c":"钢绞线制安及张拉10根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":60098.28,"h":15.447,"i":3378.33,"j":55811.05,"k":908.9,"l":""},{"a":"QY_2024","b":"QY-474","c":"钢绞线制安及张拉10根1束张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":5836.34,"h":1.552,"i":961.61,"j":4441.67,"k":433.06,"l":""},{"a":"QY_2024","b":"QY-475","c":"钢绞线制安及张拉12根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":59154.51,"h":15.329,"i":2657.79,"j":55528.95,"k":967.77,"l":""},{"a":"QY_2024","b":"QY-476","c":"钢绞线制安及张拉12根1束张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":6538.08,"h":0.646,"i":933.72,"j":4995.32,"k":609.04,"l":""},{"a":"QY_2024","b":"QY-477","c":"钢绞线制安及张拉13根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":58344.85,"h":14.814,"i":2495.78,"j":54918,"k":931.07,"l":""}]
- 2025-03-10 19:07:50,154 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_12.png
- 2025-03-10 19:07:50,154 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_13.png
- 2025-03-10 19:07:50,154 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_13.png
- 2025-03-10 19:08:32,490 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-478","c":"钢绞线制安及张拉13根1束张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":6921.21,"h":0.658,"i":908.06,"j":5397.62,"k":615.53,"l":""},{"a":"QY_2024","b":"QY-479","c":"钢绞线制安及张拉14根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":57605.76,"h":14.373,"i":2425.22,"j":54400.1,"k":780.44,"l":""},{"a":"QY_2024","b":"QY-480","c":"钢绞线制安及张拉8根1束张拉","d":"钢绞线张拉,混凝土凿毛等。","e":"10束","f":"","g":7307.92,"h":0.667,"i":884.49,"j":5799.78,"k":623.65,"l":""},{"a":"QY_2024","b":"QY-481","c":"梁体预埋钢件普通螺栓","d":"预埋件除锈、加工、外露部分涂油。","e":"t","f":"","g":7711.75,"h":0,"i":1412.88,"j":6021.35,"k":277.52,"l":""},{"a":"QY_2024","b":"QY-482","c":"梁体预埋钢件普通钢件","d":"预埋件除锈、加工、外露部分涂油。","e":"t","f":"","g":8016.3,"h":1.024,"i":1412.88,"j":6328.36,"k":275.06,"l":""}]
- 2025-03-10 19:08:32,547 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_13.png
- 2025-03-10 19:08:32,547 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_14.png
- 2025-03-10 19:08:32,547 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_14.png
- 2025-03-10 19:09:25,143 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-483","c":"安拆、调试 铁路架桥机,170t","d":"安装、调试、拆除。","e":"一次","f":"","g":25864.24,"h":2.4,"i":5666.45,"j":5982.79,"k":14215,"l":""},{"a":"QY_2024","b":"QY-484","c":"安拆、调试 公铁两用架桥机,160t","d":"安装、调试、拆除。","e":"一次","f":"","g":40978.55,"h":2.697,"i":10916.4,"j":7836.32,"k":22225.83,"l":""},{"a":"QY_2024","b":"QY-485","c":"170t架桥机架设 跨度(m)≤24","d":"喂梁、架梁、移位、梁体横移,调整,过孔。","e":"单线孔","f":"","g":11658.09,"h":0,"i":1578.03,"j":28.98,"k":10051.08,"l":""},{"a":"QY_2024","b":"QY-486","c":"170t架桥机架设 跨度(m),32","d":"喂梁、架梁、移位、梁体横移,调整,过孔。","e":"单线孔","f":"","g":14451.83,"h":0,"i":1860.57,"j":34.66,"k":12556.6,"l":""},{"a":"QY_2024","b":"QY-487","c":"160t公铁两用架桥机架设T梁","d":"运梁车就位,喂梁、移梁、落梁、调整就位,过孔。","e":"单线孔","f":"","g":10885.63,"h":0,"i":1336.74,"j":90.94,"k":9455.95,"l":""}]
- 2025-03-10 19:09:25,220 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_14.png
- 2025-03-10 19:09:25,220 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_15.png
- 2025-03-10 19:09:25,220 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_15.png
- 2025-03-10 19:09:52,426 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-488","c":"T梁运输装车","d":"两场内起吊、装车、加固。","e":"单线孔","f":"","g":2545.42,"h":0,"i":1385.14,"j":47.15,"k":1113.13,"l":""},{"a":"QY_2024","b":"QY-489","c":"T梁运输每运1km","d":"运输、回空。","e":"单线孔","f":"","g":248.02,"h":0,"i":70.41,"j":0,"k":177.61,"l":""},{"a":"QY_2024","b":"QY-490","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)12","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":2905.63,"h":0.021,"i":1574,"j":117.15,"k":1214.48,"l":""},{"a":"QY_2024","b":"QY-491","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)16","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":3057.73,"h":0.029,"i":1574,"j":157.27,"k":1326.46,"l":""},{"a":"QY_2024","b":"QY-492","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)20","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":4590.34,"h":0.036,"i":1782.25,"j":209.39,"k":2598.7,"l":""}]
- 2025-03-10 19:09:52,500 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_15.png
- 2025-03-10 19:09:52,500 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_16.png
- 2025-03-10 19:09:52,500 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_16.png
- 2025-03-10 19:10:20,479 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-493","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)24","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":5346.89,"h":0.043,"i":2061.22,"j":251.28,"k":3034.39,"l":""},{"a":"QY_2024","b":"QY-494","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)32公路","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,含梁体联结,移动吊机,现场清理。","e":"片","f":"","g":4660.23,"h":5.565,"i":1282.05,"j":1663.63,"k":1714.55,"l":""},{"a":"QY_2024","b":"QY-495","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)32铁路","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":6040.48,"h":0.043,"i":2333.62,"j":251.25,"k":3455.61,"l":""},{"a":"QY_2024","b":"QY-496","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)40公路","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,含梁体联结,移动吊机,现场清理。","e":"片","f":"","g":5348.46,"h":6.703,"i":1602.79,"j":2016.54,"k":1729.13,"l":""},{"a":"QY_2024","b":"QY-497","c":"跨墩龙门吊机架设混凝土T形梁跨度(m)40铁路","d":"起吊准备,构件起吊,纵、横移动就位,校正调整落梁,移动吊机,现场清理。","e":"单线孔","f":"","g":7851.15,"h":0.043,"i":3365.8,"j":264.13,"k":4221.22,"l":""}]
- 2025-03-10 19:10:20,550 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_16.png
- 2025-03-10 19:10:20,550 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_17.png
- 2025-03-10 19:10:20,550 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_17.png
- 2025-03-10 19:10:52,206 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-498","c":"桥头线路加固","d":"桥头穿枕木,机车压道。","e":"一座桥","f":"","g":2828.46,"h":0.366,"i":1123.03,"j":1254.48,"k":450.95,"l":""},{"a":"QY_2024","b":"QY-499","c":"梁间防水铁盖板制安","d":"制作、安装。","e":"t","f":"","g":6271.42,"h":1.066,"i":1537.9,"j":4175.12,"k":558.4,"l":""},{"a":"QY_2024","b":"QY-500","c":"梁间横隔板 钢料制安","d":"钢板划线、下料、钻孔,钢筋制作、焊接,运输、吊装上桥,焊接安装。","e":"t","f":"","g":6125.58,"h":1.067,"i":1468.23,"j":4019.61,"k":637.74,"l":""},{"a":"QY_2024","b":"QY-501","c":"梁间横隔板 混凝土","d":"模板制安拆及挂梯安拆、混凝土浇筑、振捣、养护。","e":"10m3","f":"HT-0(10.200);","g":3805.71,"h":0.169,"i":2776.84,"j":761.18,"k":267.69,"l":""},{"a":"QY_2024","b":"QY-502","c":"梁间横隔板 钢筋制安 t","d":"制作、绑扎、定位、校正。","e":"t","f":"","g":6012.24,"h":1.083,"i":1735.26,"j":4059.71,"k":217.27,"l":""}]
- 2025-03-10 19:10:52,270 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_17.png
- 2025-03-10 19:10:52,270 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_18.png
- 2025-03-10 19:10:52,270 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_18.png
- 2025-03-10 19:11:20,546 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-503","c":"现浇翼缘板及T形梁架设后横向联结湿接缝混凝土","d":"模板制安拆及吊篮安拆,混凝土浇筑、振捣、养护等。","e":"10m3","f":"HT-0(10.240);","g":3095.95,"h":0.084,"i":2381.66,"j":560.56,"k":153.73,"l":""},{"a":"QY_2024","b":"QY-504","c":"现浇翼缘板及T形梁架设后侧向联结湿接缝钢筋制安","d":"制作、绑扎、焊接、位置调整。","e":"t","f":"","g":6062.92,"h":1.109,"i":1760.17,"j":4163.74,"k":139.01,"l":""},{"a":"QY_2024","b":"QY-505","c":"安装、调试及拆除 架桥机 600t","d":"安装、调试、拆除。","e":"一次","f":"","g":278780.125,"h":1.241,"i":84051.81,"j":4194.24,"k":190534.063,"l":""},{"a":"QY_2024","b":"QY-506","c":"安装、调试及拆除 架桥机 900t","d":"安装、调试、拆除。","e":"一次","f":"","g":373444.031,"h":1.367,"i":122257.07,"j":4582.86,"k":246604.1,"l":""},{"a":"QY_2024","b":"QY-507","c":"安装、调试及拆除 运架一体机 900t","d":"安装、调试、拆除。","e":"一次","f":"","g":670401.4,"h":1.547,"i":188813.859,"j":11092.32,"k":470495.2,"l":""}]
- 2025-03-10 19:11:20,611 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_18.png
- 2025-03-10 19:11:20,611 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_19.png
- 2025-03-10 19:11:20,611 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_19.png
- 2025-03-10 19:11:52,533 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-508","c":"安装、调试及拆除运梁车600t","d":"安装、调试、拆除。","e":"一次","f":"157795.563","g":157795.563,"h":0.833,"i":44827.53,"j":2829.92,"k":110138.117,"l":""},{"a":"QY_2024","b":"QY-509","c":"安装、调试及拆除运梁车900t","d":"安装、调试、拆除。","e":"一次","f":"218163.516","g":218163.516,"h":0.9,"i":58470.86,"j":3037.16,"k":156655.484,"l":""},{"a":"QY_2024","b":"QY-510","c":"600t架桥机架设预应力混凝土双线箱梁变跨","d":"拧开连接前吊梁行车、前支腿、前走行支腿上部横梁和主梁的长螺杆的下部螺帽,由上部取出连接螺杆;起动液压系统液压泵,控制变跨纵移油缸顶伸(...","e":"次","f":"14826.26","g":14826.26,"h":0.01,"i":4437.97,"j":213.82,"k":10174.47,"l":""},{"a":"QY_2024","b":"QY-511","c":"600t架桥机架设预应力混凝土双线箱梁隧道口首末孔","d":"架梁准备,安装吊具,支腿安拆,下导梁过孔、抽回,起吊梁体,纵向移梁,落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"46930.66","g":46930.66,"h":0.016,"i":3561.38,"j":247.62,"k":43121.66,"l":""},{"a":"QY_2024","b":"QY-512","c":"600t架桥机架设预应力混凝土双线箱梁其他孔","d":"架梁准备,安装吊具,起吊梁体,落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"25137.17","g":25137.17,"h":0.016,"i":2323.35,"j":225.74,"k":22568.08,"l":""}]
- 2025-03-10 19:11:52,620 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_19.png
- 2025-03-10 19:11:52,620 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_20.png
- 2025-03-10 19:11:52,620 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_20.png
- 2025-03-10 19:12:44,827 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-513","c":"900t架桥机架设预应力混凝土双线箱梁变跨","d":"拧开连接前吊梁行车、前支腿、前走行支腿上部横梁和主梁的长螺杆的下部螺帽。由上部取出连接螺杆;起动液压系统液压泵,控制变跨纵移油缸顶伸(...","e":"次","f":"","g":15403.62,"h":0.01,"i":4163.9,"j":213.82,"k":11025.9,"l":""},{"a":"QY_2024","b":"QY-514","c":"900t架桥机架设预应力混凝土双线箱梁隧道口首末孔","d":"架梁准备,安装吊具,支腿安拆,下导梁过孔、抽回,起吊梁体,纵向移梁、落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"","g":52326.49,"h":0.016,"i":3543.68,"j":247.62,"k":48535.19,"l":""},{"a":"QY_2024","b":"QY-515","c":"900t架桥机架设预应力混凝土双线箱梁其他孔","d":"架梁准备,安装吊具,起吊梁体,落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"","g":28825.79,"h":0.016,"i":2301.3,"j":225.74,"k":26298.75,"l":""},{"a":"QY_2024","b":"QY-516","c":"900t运架一体机架设混凝土双线箱梁变跨","d":"拆除主梁后起重小车纵移范围滑道内的支撑架,纵向油缸和导杆装置将后起重小车前移/后移至待架跨度位置处,恢复主梁内支撑架。","e":"次","f":"","g":27197.34,"h":0,"i":1341.83,"j":131.03,"k":25724.48,"l":""},{"a":"QY_2024","b":"QY-517","c":"900t运架一体机架设混凝土双线箱梁一般孔","d":"架梁准备,安装吊具,起吊梁体,落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"","g":21505.95,"h":0.005,"i":1237.23,"j":67.39,"k":20201.33,"l":""}]
- 2025-03-10 19:12:44,921 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_20.png
- 2025-03-10 19:12:44,921 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_21.png
- 2025-03-10 19:12:44,921 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_21.png
- 2025-03-10 19:13:37,210 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-518","c":"900t运架一体机架设混凝土双线箱梁末孔","d":"架梁准备,安装吊具,支腿安拆,下导梁过孔、抽回,起吊梁体,纵向移梁,落梁、支顶、就位,拆除吊具,纵向移动架桥机,就位调试。","e":"双线孔","f":"61204.11","g":61204.11,"h":0.005,"i":3678.06,"j":78.13,"k":57447.92,"l":""},{"a":"QY_2024","b":"QY-519","c":"架设箱梁 轮轨式提梁机≤2×450t ≤600t","d":"搬梁机准备就位,吊梁准备,安装吊具,起吊箱梁,梁体横移,就位落梁,拆除吊具,返回。","e":"双线孔","f":"4731.94","g":4731.94,"h":0,"i":1344.89,"j":3.83,"k":3383.22,"l":""},{"a":"QY_2024","b":"QY-520","c":"架设箱梁 轮轨式提梁机≤2×450t ≤600t","d":"搬梁机准备就位,吊梁准备,安装吊具,起吊箱梁,梁体横移,就位落梁,拆除吊具,返回。","e":"双线孔","f":"5676.82","g":5676.82,"h":0,"i":1613.81,"j":4.51,"k":4058.5,"l":""},{"a":"QY_2024","b":"QY-521","c":"箱梁装车 轮胎式搬梁机≤600t","d":"搬梁机准备就位,运梁车准备就位、等待接梁,吊梁准备,安装吊具,起吊箱梁(含场内支座安装时间),梁体横移,运梁车接梁,拆除吊具。","e":"双线孔","f":"7457.45","g":7457.45,"h":0.031,"i":266.91,"j":237.81,"k":6950.73,"l":""},{"a":"QY_2024","b":"QY-522","c":"箱梁装车 轮轨式搬梁机≤600t","d":"搬梁机准备就位,运梁车准备就位、等待接梁,吊梁准备,安装吊具,起吊箱梁(含场内支座安装时间),梁体横移,运梁车接梁,拆除吊具。","e":"双线孔","f":"6492.96","g":6492.96,"h":0.031,"i":261.03,"j":295.77,"k":5936.16,"l":""}]
- 2025-03-10 19:13:37,294 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_21.png
- 2025-03-10 19:13:37,294 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_22.png
- 2025-03-10 19:13:37,294 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_22.png
- 2025-03-10 19:14:09,476 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-523","c":"箱梁装车运输车轮胎式搬梁机≤900t","d":"搬梁机准备就位;运梁车准备就位、等待接梁;吊梁准备、安装吊具,起吊箱梁(含场内支座安装时间);梁体横移,运梁车接梁;拆除吊具。","e":"双线孔","f":"","g":13584.32,"h":0.019,"i":268.91,"j":168.11,"k":13147.3,"l":""},{"a":"QY_2024","b":"QY-524","c":"箱梁装车运输车轮轨式搬梁机≤900t","d":"搬梁机准备就位;运梁车准备就位、等待接梁;吊梁准备、安装吊具,起吊箱梁(含场内支座安装时间);梁体横移,运梁车接梁;拆除吊具。","e":"双线孔","f":"","g":10952.54,"h":0.019,"i":261.03,"j":163.06,"k":10528.45,"l":""},{"a":"QY_2024","b":"QY-525","c":"箱梁装车运输车轮轨式提梁机≤2×450t","d":"搬梁机准备就位;运梁车准备就位、等待接梁;吊梁准备、安装吊具,起吊箱梁(含场内支座安装时间);梁体横移,运梁车接梁;拆除吊具。","e":"双线孔","f":"","g":11973.02,"h":0.019,"i":692.64,"j":163.06,"k":11117.32,"l":""},{"a":"QY_2024","b":"QY-526","c":"箱梁装车运架一体机陆上","d":"搬梁机准备就位;运梁车准备就位、等待接梁;吊梁准备、安装吊具,起吊箱梁(含场内支座安装时间);梁体横移,运梁车接梁;拆除吊具。","e":"双线孔","f":"","g":9443,"h":0,"i":362.09,"j":11.9,"k":9069.01,"l":""},{"a":"QY_2024","b":"QY-527","c":"箱梁装车运架一体机桥上","d":"搬梁机准备就位;运梁车准备就位、等待接梁;吊梁准备、安装吊具,起吊箱梁(含场内支座安装时间);梁体横移,运梁车接梁;拆除吊具。","e":"双线孔","f":"","g":19691.58,"h":0,"i":629.4,"j":11.9,"k":19050.28,"l":""}]
- 2025-03-10 19:14:09,531 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_22.png
- 2025-03-10 19:14:09,532 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_23.png
- 2025-03-10 19:14:09,532 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_23.png
- 2025-03-10 19:14:31,443 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-528","c":"箱梁运输1km≤600t","d":"运输、空回。","e":"双线孔","f":"","g":1262.01,"h":0,"i":27.52,"j":0,"k":1234.49,"l":""},{"a":"QY_2024","b":"QY-529","c":"箱梁运输1km≤900t","d":"运输、空回。","e":"双线孔","f":"","g":2313.88,"h":0,"i":27.68,"j":0,"k":2286.2,"l":""},{"a":"QY_2024","b":"QY-530","c":"箱梁运输1km 900t运架一体机","d":"运输、空回。","e":"双线孔","f":"","g":3992.33,"h":0,"i":54.39,"j":0,"k":3937.94,"l":""},{"a":"QY_2024","b":"QY-531","c":"移动支架造桥机安、拆 整顶吊拼","d":"吊拼装准备,吊拼杆件,安装及调试动力机械设备。拆除杆件及机械设备,分类堆放。","e":"10t次","f":"","g":13369.7,"h":0.016,"i":6939.78,"j":191.74,"k":6236.18,"l":""},{"a":"QY_2024","b":"QY-532","c":"移动支架造桥机安、拆 路基上拼装","d":"机械安装、调试、拆除。","e":"10t次","f":"","g":6826.36,"h":0.014,"i":6206.27,"j":230.3,"k":2369.79,"l":""}]
- 2025-03-10 19:14:31,513 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_23.png
- 2025-03-10 19:14:31,513 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_24.png
- 2025-03-10 19:14:31,513 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_24.png
- 2025-03-10 19:14:53,239 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-533","c":"箱节预制 混凝土","d":"模板安拆,混凝土浇筑、振捣,移梁、存梁、养护。","e":"10m3","f":"HT-0(10.100);","g":4513.35,"h":0.3,"i":1894.31,"j":1484.31,"k":1134.73,"l":""},{"a":"QY_2024","b":"QY-534","c":"箱节预制 钢筋","d":"钢筋调直、切断、焊接、弯制、绑扎,吊装、定位、校正。","e":"t","f":"","g":5490.19,"h":1.036,"i":1043.79,"j":4190.23,"k":256.17,"l":""},{"a":"QY_2024","b":"QY-535","c":"梁段运输 装车","d":"吊梁、运梁。","e":"10m3","f":"","g":361.67,"h":0,"i":90.28,"j":10.66,"k":260.73,"l":""},{"a":"QY_2024","b":"QY-536","c":"梁段运输 增运1km","d":"吊梁、运梁。","e":"10m3","f":"","g":124.41,"h":0,"i":16.41,"j":0,"k":108,"l":""},{"a":"QY_2024","b":"QY-537","c":"箱梁梁段桥下提升","d":"起重机准备就位,吊梁准备、安装吊具,起吊梁段,梁段横移,就位落梁,拆除吊具。","e":"10m3","f":"","g":163.26,"h":0,"i":45.06,"j":0,"k":118.2,"l":""}]
- 2025-03-10 19:14:53,316 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_24.png
- 2025-03-10 19:14:53,316 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_25.png
- 2025-03-10 19:14:53,316 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_25.png
- 2025-03-10 19:15:52,110 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-538","c":"箱梁梁架设","d":"梁段里面凿毛,梁段吊入移动支架,轨道小车运输梁段,拼装调整梁段。","e":"10m3","f":"","g":5676.55,"h":0.022,"i":1430.67,"j":131.41,"k":4114.47,"l":""},{"a":"QY_2024","b":"QY-539","c":"节段箱梁湿接缝混凝土","d":"模板安拆,混凝土浇筑、振捣、养护。","e":"10m3","f":"","g":5561.71,"h":0.285,"i":3280.08,"j":1406.76,"k":874.87,"l":""},{"a":"QY_2024","b":"QY-540","c":"节段箱梁湿接缝钢筋","d":"钢筋除锈、调直、切断、弯制、绑扎、焊接、定位、校正。","e":"t","f":"","g":7105.98,"h":1.034,"i":2586.15,"j":4167.38,"k":352.45,"l":""},{"a":"QY_2024","b":"QY-541","c":"移动支架移位","d":"造桥机纵向移位前准备、安拆附属设施、造桥机自行就位、调整准备架梁。","e":"10m","f":"","g":6548.55,"h":0.206,"i":3955.34,"j":1404.68,"k":1188.53,"l":""},{"a":"QY_2024","b":"QY-542","c":"0号块混凝土浇筑 陆上","d":"模板制安拆、内模钢木支架制安拆,0号块与墩顶临时固定,挂篮移位,混凝土浇筑、振捣及养护;泵管安拆、冲洗、码放。","e":"10m3","f":"HT-0(10.200):","g":5305.05,"h":0.309,"i":2363.74,"j":1657.91,"k":1283.4,"l":""}]
- 2025-03-10 19:15:52,161 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_25.png
- 2025-03-10 19:15:52,162 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_26.png
- 2025-03-10 19:15:52,162 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_26.png
- 2025-03-10 19:17:12,187 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-543","c":"0号块混凝土浇筑 水上","d":"模板制安拆,内模钢木支架制安拆,0号块与墩顶临时固定,挂篮移位,混凝土水上运输,浇筑、振捣及养护,泵管安拆、冲洗、码放。","e":"10m3","f":"HT-0(10.200);","g":6292.39,"h":0.307,"i":3211.36,"j":1626.98,"k":1454.05,"l":""},{"a":"QY_2024","b":"QY-544","c":"悬浇混凝土 陆上","d":"模板制安拆,内模钢木支架制安拆,0号块与墩顶临时固定,挂篮移位,混凝土浇筑、振捣及养护,泵管安拆、冲洗、码放。","e":"10m3","f":"HT-0(10.200);","g":5747.28,"h":0.311,"i":2571.5,"j":1755.83,"k":1419.95,"l":""},{"a":"QY_2024","b":"QY-545","c":"悬浇混凝土 水上","d":"模板制安拆,内模钢木支架制安拆,0号块与墩顶临时固定,挂篮移位,混凝土水上运输,浇筑、振捣及养护,泵管安拆、冲洗、码放。","e":"10m3","f":"HT-0(10.200);","g":6733.72,"h":0.309,"i":3400.13,"j":1724.9,"k":1608.69,"l":""},{"a":"QY_2024","b":"QY-546","c":"顶推连续箱 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,泵管安拆、冲洗、码放,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":2935.19,"h":0.143,"i":2011.3,"j":774.93,"k":148.96,"l":""},{"a":"QY_2024","b":"QY-547","c":"拼接顶推","d":"托架、制动架、导向架、拉杆螺栓、顶座、支座、观测架等制安拆,梁体顶推、就位起梁及观测。","e":"10m3混凝土","f":"","g":3673.91,"h":0.095,"i":1825.27,"j":1350.7,"k":497.94,"l":""}]
- 2025-03-10 19:17:12,240 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_26.png
- 2025-03-10 19:17:12,240 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_27.png
- 2025-03-10 19:17:12,240 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_27.png
- 2025-03-10 19:18:33,582 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-548","c":"球绞骨架、滑道、撑脚、砂箱安装","d":"测量定位,球绞骨架吊装、粗调、精调,滑道滑架与滑道板分阶段拼装、整体吊装、粗调、精调,撑脚与砂箱吊装、调整,灌砂,砂箱拆除。","e":"t","f":"","g":6695.64,"h":0.008,"i":1381.26,"j":68.66,"k":5245.72,"l":""},{"a":"QY_2024","b":"QY-549","c":"球绞安装","d":"吊装下球绞、粗调、精调,装滑片,涂黄油,吊装上球绞。","e":"一个墩","f":"","g":45351.34,"h":0.09,"i":17517.76,"j":503.95,"k":27329.63,"l":""},{"a":"QY_2024","b":"QY-550","c":"水平转体","d":"转体准备,安装牵引系统,试转,正式转体。","e":"一个墩","f":"","g":173556.016,"h":0,"i":47137.9,"j":427.6,"k":125990.508,"l":""},{"a":"QY_2024","b":"QY-551","c":"连续箱梁普通钢筋","d":"制作、绑扎、校正、定位。","e":"t","f":"","g":5554.21,"h":1.036,"i":1104.46,"j":4001.96,"k":447.79,"l":""},{"a":"QY_2024","b":"QY-552","c":"预应力粗钢筋制安及张拉直径25制安","d":"钢筋、钢板、钢管、三通管除锈、预拉、制丝、旋圈、钻孔、电焊、安装,粗钢筋张拉、孔道压浆,切割钢筋头。","e":"10t","f":"","g":91758.87,"h":18.072,"i":10580.99,"j":63920.95,"k":17256.93,"l":""}]
- 2025-03-10 19:18:33,670 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_27.png
- 2025-03-10 19:18:33,670 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_28.png
- 2025-03-10 19:18:33,670 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_28.png
- 2025-03-10 19:19:05,901 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-553","c":"预应力粗钢筋制安及张拉直径25张拉","d":"钢筋、钢板、钢管、三通管除锈、预拉、制丝、旋圈、钻孔、电焊、安装,粗钢筋张拉、孔道压浆,切割钢筋头。","e":"100根","f":"","g":10930.56,"h":0.021,"i":6071.41,"j":4185.98,"k":673.17,"l":""},{"a":"QY_2024","b":"QY-554","c":"预应力粗钢筋制安及张拉直径32制安","d":"钢筋、钢板、钢管、三通管除锈、预拉、制丝、旋圈、钻孔、电焊、安装,粗钢筋张拉、孔道压浆,切割钢筋头。","e":"10t","f":"","g":95694.78,"h":18.554,"i":12613.85,"j":65824,"k":17256.93,"l":""},{"a":"QY_2024","b":"QY-555","c":"预应力粗钢筋制安直径32张拉","d":"钢筋、钢板、钢管、三通管除锈、预拉、制丝、旋圈、钻孔、电焊、安装,粗钢筋张拉、孔道压浆,切割钢筋头。","e":"100根","f":"","g":11498.32,"h":0.021,"i":6677.63,"j":4147.52,"k":673.17,"l":""},{"a":"QY_2024","b":"QY-556","c":"束长20m以内3根1束制安","d":"钢绞线切割、制束、波纹管穿束、孔道压浆。","e":"10t","f":"","g":146879.281,"h":19.914,"i":34089.64,"j":107636.11,"k":5153.11,"l":""},{"a":"QY_2024","b":"QY-557","c":"束长20m以内3根1束张拉","d":"钢绞线张拉、混凝土凿毛、封锚。","e":"10束","f":"","g":2970.68,"h":0.032,"i":1666.68,"j":1206.71,"k":95.29,"l":""}]
- 2025-03-10 19:19:05,977 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_28.png
- 2025-03-10 19:19:05,977 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_29.png
- 2025-03-10 19:19:05,977 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_29.png
- 2025-03-10 19:20:06,461 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-558","c":"束长20m以内 4根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":137770.375,"h":19.295,"i":30081.2,"j":102291.0,"k":5398.16,"l":""},{"a":"QY_2024","b":"QY-559","c":"束长20m以内 4根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":3394.6,"h":0.046,"i":1660.48,"j":1610.06,"k":124.08,"l":""},{"a":"QY_2024","b":"QY-560","c":"束长20m以内 5根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":127312.469,"h":18.283,"i":25781.95,"j":97015.17,"k":4515.35,"l":""},{"a":"QY_2024","b":"QY-561","c":"束长20m以内 5根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":3799.42,"h":0.055,"i":1652.59,"j":2011.98,"k":134.85,"l":""},{"a":"QY_2024","b":"QY-562","c":"束长20m以内 7根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":93879.14,"h":17.263,"i":18047.49,"j":71666.84,"k":4162.81,"l":""}]
- 2025-03-10 19:20:06,538 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_29.png
- 2025-03-10 19:20:06,538 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_30.png
- 2025-03-10 19:20:06,538 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_30.png
- 2025-03-10 19:21:03,680 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-563","c":"束长20m以内 7根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":4616.56,"h":0.074,"i":1637.3,"j":2815.65,"k":163.61,"l":""},{"a":"QY_2024","b":"QY-564","c":"束长20m以内 12根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":86667.41,"h":16.984,"i":12091.8,"j":70813.07,"k":3762.54,"l":""},{"a":"QY_2024","b":"QY-565","c":"束长20m以内 12根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":6642.55,"h":0.127,"i":1597.87,"j":4826.83,"k":217.85,"l":""},{"a":"QY_2024","b":"QY-566","c":"束长20m以内 14根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":83900.78,"h":16.442,"i":10682.73,"j":69013.73,"k":4004.32,"l":""},{"a":"QY_2024","b":"QY-567","c":"束长20m以内 14根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":7509,"h":0.151,"i":1501.64,"j":5632.19,"k":375.17,"l":""}]
- 2025-03-10 19:21:03,748 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_30.png
- 2025-03-10 19:21:03,748 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_31.png
- 2025-03-10 19:21:03,748 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_31.png
- 2025-03-10 19:21:32,363 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-568","c":"束长20m以内 15根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":82094.82,"h":15.971,"i":9794.36,"j":67871.7,"k":4428.76,"l":""},{"a":"QY_2024","b":"QY-569","c":"束长20m以内 15根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":7849.02,"h":0.187,"i":1366.71,"j":6043.11,"k":437.2,"l":""},{"a":"QY_2024","b":"QY-570","c":"束长20m以内 19根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":78902.01,"h":15.354,"i":9541.38,"j":64657.54,"k":4703.09,"l":""},{"a":"QY_2024","b":"QY-571","c":"束长20m以内 19根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":9258.49,"h":0.247,"i":1261.85,"j":7658.02,"k":338.62,"l":""},{"a":"QY_2024","b":"QY-572","c":"束长20m以内 22根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":76001.56,"h":16.54,"i":7790.14,"j":63927.97,"k":4283.45,"l":""}]
- 2025-03-10 19:21:32,433 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_31.png
- 2025-03-10 19:21:32,433 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_32.png
- 2025-03-10 19:21:32,433 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_32.png
- 2025-03-10 19:22:10,342 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-573","c":"束长20m以内 22根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":10471.62,"h":0.286,"i":1243.35,"j":8867.18,"k":361.09,"l":""},{"a":"QY_2024","b":"QY-574","c":"束长20m以内 31根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":72856.03,"h":14.219,"i":9104.61,"j":60040.77,"k":3710.65,"l":""},{"a":"QY_2024","b":"QY-575","c":"束长20m以内 31根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":14107.4,"h":0.402,"i":1224.68,"j":12494.66,"k":388.06,"l":""},{"a":"QY_2024","b":"QY-576","c":"束长40m以内 7根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":87326.17,"h":17.439,"i":12503.63,"j":70233.65,"k":4588.9,"l":""},{"a":"QY_2024","b":"QY-577","c":"束长40m以内 7根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":4787.65,"h":0.109,"i":1261.85,"j":2827.59,"k":698.21,"l":""}]
- 2025-03-10 19:22:10,430 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_32.png
- 2025-03-10 19:22:10,430 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_33.png
- 2025-03-10 19:22:10,430 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_33.png
- 2025-03-10 19:22:46,533 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-578","c":"束长40m以内12根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":78212.44,"h":16.957,"i":8579.66,"j":65404.55,"k":4228.23,"l":""},{"a":"QY_2024","b":"QY-579","c":"束长40m以内12根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":6430.56,"h":0.149,"i":1180.74,"j":4834.49,"k":415.33,"l":""},{"a":"QY_2024","b":"QY-580","c":"束长40m以内15根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":75896.79,"h":15.755,"i":7721.74,"j":63374.34,"k":4800.71,"l":""},{"a":"QY_2024","b":"QY-581","c":"束长40m以内15根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":7601.99,"h":0.187,"i":1156.44,"j":6043.11,"k":402.44,"l":""},{"a":"QY_2024","b":"QY-582","c":"束长40m以内19根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":72125.14,"h":15.108,"i":6910.66,"j":60371.5,"k":4842.98,"l":""}]
- 2025-03-10 19:22:46,667 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_33.png
- 2025-03-10 19:22:46,668 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_34.png
- 2025-03-10 19:22:46,668 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_34.png
- 2025-03-10 19:23:22,641 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-583","c":"束长40m以内19根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":9064.03,"h":0.247,"i":1149.2,"j":7658.02,"k":256.81,"l":""},{"a":"QY_2024","b":"QY-584","c":"束长(m) 40以内22根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":69126.29,"h":16.12,"i":5526.59,"j":59269.41,"k":4328.29,"l":""},{"a":"QY_2024","b":"QY-585","c":"束长(m) 40以内28根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":10689.14,"h":0.233,"i":1519.02,"j":8849.18,"k":320.94,"l":""},{"a":"QY_2024","b":"QY-586","c":"束长(m) 40以内31根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":65228.75,"h":14.831,"i":4422.84,"j":56798.17,"k":4007.74,"l":""},{"a":"QY_2024","b":"QY-587","c":"束长(m) 40以内31根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":14080.01,"h":0.328,"i":1456.09,"j":12469.3,"k":154.62,"l":""}]
- 2025-03-10 19:23:22,705 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_34.png
- 2025-03-10 19:23:22,705 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_35.png
- 2025-03-10 19:23:22,705 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_35.png
- 2025-03-10 19:23:56,023 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-588","c":"束长(m) 80以内12根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":72857.07,"h":16.327,"i":8138.87,"j":60460.71,"k":4257.49,"l":""},{"a":"QY_2024","b":"QY-589","c":"束长(m) 80以内12根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":6673.89,"h":0.182,"i":1415.7,"j":4845.56,"k":412.63,"l":""},{"a":"QY_2024","b":"QY-590","c":"束长(m) 80以内15根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":71308.2,"h":15.439,"i":6511.07,"j":59999.01,"k":4798.12,"l":""},{"a":"QY_2024","b":"QY-591","c":"束长(m) 80以内15根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":8562.4,"h":0.193,"i":1372.41,"j":6643.11,"k":546.88,"l":""},{"a":"QY_2024","b":"QY-592","c":"束长(m) 80以内19根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":69234.16,"h":15.086,"i":5848.36,"j":59040.34,"k":4345.46,"l":""}]
- 2025-03-10 19:23:56,057 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_35.png
- 2025-03-10 19:23:56,057 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_36.png
- 2025-03-10 19:23:56,057 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_36.png
- 2025-03-10 19:24:21,640 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-593","c":"束长(m) 80以内19根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":9358.02,"h":0.247,"i":1314.64,"j":7658.02,"k":385.36,"l":""},{"a":"QY_2024","b":"QY-594","c":"束长(m) 80以内22根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":68537.36,"h":16.115,"i":5667.31,"j":58776.72,"k":4093.33,"l":""},{"a":"QY_2024","b":"QY-595","c":"束长(m) 80以内22根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":10507.7,"h":0.285,"i":1275.05,"j":8867.06,"k":365.59,"l":""},{"a":"QY_2024","b":"QY-596","c":"束长(m) 80以内31根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":64139.52,"h":14.805,"i":4691.27,"j":56132.7,"k":3315.55,"l":""},{"a":"QY_2024","b":"QY-597","c":"束长(m) 80以内31根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":13943.62,"h":0.328,"i":1212.12,"j":12469.3,"k":262.2,"l":""}]
- 2025-03-10 19:24:21,699 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_36.png
- 2025-03-10 19:24:21,699 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_37.png
- 2025-03-10 19:24:21,699 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_37.png
- 2025-03-10 19:24:57,952 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-598","c":"束长(m) 120以内 15根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":67592.48,"h":15.177,"i":6174.56,"j":57612.08,"k":3805.84,"l":""},{"a":"QY_2024","b":"QY-599","c":"束长(m) 120以内 15根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":7672.16,"h":0.187,"i":1191.85,"j":6043.11,"k":437.2,"l":""},{"a":"QY_2024","b":"QY-600","c":"束长(m) 120以内 19根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":67045.35,"h":15.544,"i":5781.25,"j":57352.08,"k":3912.02,"l":""},{"a":"QY_2024","b":"QY-601","c":"束长(m) 120以内 19根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":9268.61,"h":0.247,"i":1167.39,"j":7658.02,"k":443.2,"l":""},{"a":"QY_2024","b":"QY-602","c":"束长(m) 120以内 22根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":67064.94,"h":16,"i":5486.43,"j":57504.85,"k":4073.66,"l":""}]
- 2025-03-10 19:24:58,008 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_37.png
- 2025-03-10 19:24:58,008 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_38.png
- 2025-03-10 19:24:58,008 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_38.png
- 2025-03-10 19:25:21,690 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-603","c":"束长(m) 120以内 22根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":10137.92,"h":0.285,"i":1149.2,"j":8867.06,"k":121.66,"l":""},{"a":"QY_2024","b":"QY-604","c":"束长(m) 120以内 31根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":64157.51,"h":14.762,"i":4494.45,"j":55514.42,"k":4148.64,"l":""},{"a":"QY_2024","b":"QY-605","c":"束长(m) 120以内 31根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":13728.27,"h":0.328,"i":1094.16,"j":12469.3,"k":164.81,"l":""},{"a":"QY_2024","b":"QY-606","c":"束长(m) 160以内 31根1束 制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":62785.9,"h":14.513,"i":4994.14,"j":54330.69,"k":3461.07,"l":""},{"a":"QY_2024","b":"QY-607","c":"束长(m) 160以内 31根1束 张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":13643.08,"h":0.328,"i":1066.8,"j":12469.3,"k":106.98,"l":""}]
- 2025-03-10 19:25:21,768 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_38.png
- 2025-03-10 19:25:21,768 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_39.png
- 2025-03-10 19:25:21,768 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_39.png
- 2025-03-10 19:25:50,762 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-608","c":"束长(m) 200以内 31根1束制安","d":"钢绞线切割、制束,波纹管穿束,孔道压浆。","e":"10t","f":"","g":63618.87,"h":14.641,"i":5572.84,"j":54706.29,"k":3339.74,"l":""},{"a":"QY_2024","b":"QY-609","c":"束长(m) 200以内 31根1束张拉","d":"钢绞线张拉,混凝土凿毛,封锚。","e":"10束","f":"","g":13612.84,"h":0.328,"i":1038.96,"j":12469.3,"k":104.58,"l":""},{"a":"QY_2024","b":"QY-610","c":"顶推钢导梁制作","d":"调直整平、划线下料、钻孔(电焊)磨光顶紧,除锈、油漆。","e":"t","f":"","g":3130.63,"h":0.35,"i":1276.34,"j":1393.47,"k":460.82,"l":""},{"a":"QY_2024","b":"QY-611","c":"顶推钢导梁安拆","d":"杆件安拆,脚手架搭拆。","e":"t","f":"","g":1172.75,"h":0.019,"i":935.97,"j":138.67,"k":98.11,"l":""},{"a":"QY_2024","b":"QY-612","c":"悬浇箱梁挂篮安拆","d":"杆件安拆,脚手架搭拆。","e":"t·次","f":"","g":4173.53,"h":0.355,"i":1034.46,"j":2597.96,"k":541.11,"l":""}]
- 2025-03-10 19:25:50,780 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_39.png
- 2025-03-10 19:25:50,780 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_40.png
- 2025-03-10 19:25:50,780 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_40.png
- 2025-03-10 19:26:13,290 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-613","c":"上承钢板梁跨度(m) 24","d":"架梁就位。","e":"单线孔","f":"","g":5365.51,"h":0.265,"i":1179.13,"j":607.43,"k":3578.95,"l":""},{"a":"QY_2024","b":"QY-614","c":"上承钢板梁跨度(m) 28~32","d":"架梁就位。","e":"单线孔","f":"","g":8641.13,"h":0.283,"i":1917.48,"j":648.31,"k":6075.34,"l":""},{"a":"QY_2024","b":"QY-615","c":"下承钢板梁跨度(m) 32","d":"架梁就位。","e":"单线孔","f":"","g":10151.35,"h":0.303,"i":2271.04,"j":694.42,"k":7185.89,"l":""},{"a":"QY_2024","b":"QY-616","c":"岸上栓焊钢桁梁","d":"选配及运输杆件,组拼钢梁,搭拆脚手架,调整拱度,紧固高强度螺栓。","e":"10t","f":"","g":9264.52,"h":0.301,"i":4585.22,"j":2936.38,"k":1742.92,"l":""},{"a":"QY_2024","b":"QY-617","c":"导梁","d":"拼装及拆除导梁、用螺栓连接杆件、拧紧螺栓、搭拆扒杆。","e":"10t","f":"","g":14026.59,"h":2.598,"i":9178.48,"j":3922.33,"k":925.78,"l":""}]
- 2025-03-10 19:26:13,361 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_40.png
- 2025-03-10 19:26:13,361 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_41.png
- 2025-03-10 19:26:13,361 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_41.png
- 2025-03-10 19:26:52,380 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-618","c":"连接及加固杆件","d":"拼装及拆除导梁、用螺栓连接杆件、拧紧螺栓;搭拆扒杆。","e":"10t","f":"","g":19121.83,"h":0.682,"i":14575.59,"j":4083.72,"k":462.52,"l":""},{"a":"QY_2024","b":"QY-619","c":"下滑道下弦下滑道","d":"铺钉垫木、钢轨、弯锚钢轨,用螺栓将上滑道稳固在下弦杆纵梁或端横梁上。","e":"10m","f":"","g":793.65,"h":0.178,"i":335.38,"j":458.27,"k":0,"l":""},{"a":"QY_2024","b":"QY-620","c":"下滑道纵梁下滑道","d":"铺钉垫木、钢轨、弯锚钢轨,用螺栓将上滑道稳固在下弦杆纵梁或端横梁上。","e":"10m","f":"","g":836.97,"h":0.16,"i":397.66,"j":439.31,"k":0,"l":""},{"a":"QY_2024","b":"QY-621","c":"上滑道下弦上滑道","d":"铺钉垫木、钢轨、弯锚钢轨,用螺栓将上滑道稳固在下弦杆纵梁或端横梁上。","e":"10m","f":"","g":6155.34,"h":1.637,"i":2361,"j":3794.34,"k":0,"l":""},{"a":"QY_2024","b":"QY-622","c":"上滑道纵梁上滑道","d":"铺钉垫木、钢轨、弯锚钢轨,用螺栓将上滑道稳固在下弦杆纵梁或端横梁上。","e":"10m","f":"","g":2914.45,"h":0.252,"i":2319.48,"j":594.97,"k":0,"l":""}]
- 2025-03-10 19:26:52,491 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_41.png
- 2025-03-10 19:26:52,491 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_42.png
- 2025-03-10 19:26:52,491 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_42.png
- 2025-03-10 19:28:03,834 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-623","c":"钢梁纵移","d":"埋设地笼,上下滑道间安设滚轴,绑扎滑车组,穿钢丝绳,用卷扬机牵引顺滑道纵移。","e":"1000tm","f":"","g":403.65,"h":0.007,"i":301.26,"j":29.73,"k":72.66,"l":""},{"a":"QY_2024","b":"QY-624","c":"钢梁横移","d":"顶起钢梁,在滑道间安设滚轴,安设千斤顶,将梁横向顺滑道移动。","e":"1000tm","f":"","g":1901.41,"h":0.01,"i":1863.25,"j":38.16,"k":0,"l":""},{"a":"QY_2024","b":"QY-625","c":"钢梁就位","d":"顶起钢梁,落梁就位,校正钢梁中线位置。","e":"孔","f":"","g":10543.55,"h":0,"i":10542.52,"j":1.03,"k":0,"l":""},{"a":"QY_2024","b":"QY-626","c":"钢桁梁悬臂拼栓 跨度(m) 64~80","d":"杆件预拼、高强度螺栓施拧、定落梁、钢梁就位、调整、高强度螺栓检验、电板校正。","e":"10t","f":"","g":13342.01,"h":0.261,"i":6916.13,"j":3780.5,"k":2645.38,"l":""},{"a":"QY_2024","b":"QY-627","c":"钢桁梁悬臂拼栓 跨度(m) 80以上","d":"杆件预拼、高强度螺栓施拧、定落梁、钢梁就位、调整、高强度螺栓检验、电板校正。","e":"10t","f":"","g":15558.21,"h":0.315,"i":6585.74,"j":4480.79,"k":4491.68,"l":""}]
- 2025-03-10 19:28:03,907 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_42.png
- 2025-03-10 19:28:03,907 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_43.png
- 2025-03-10 19:28:03,907 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_43.png
- 2025-03-10 19:28:42,743 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-628","c":"整体节点钢梁悬臂架设","d":"杆件预拼、高强度螺栓施拧、定落梁、钢梁就位、调整、高强度螺栓检验、电板校正。","e":"10t","f":"","g":9899.62,"h":0.258,"i":3539.01,"j":3189.27,"k":3171.34,"l":""},{"a":"QY_2024","b":"QY-629","c":"平衡梁安拆","d":"脚手架搭拆、杆件拼装、拆除。","e":"10t","f":"","g":6095.91,"h":0.116,"i":4677.11,"j":665.03,"k":753.77,"l":""},{"a":"QY_2024","b":"QY-630","c":"浮箱压重安拆","d":"拼装浮箱、起重机起吊安装、注水、放水、拆除。","e":"100t一次","f":"","g":6098.96,"h":0.351,"i":2150.99,"j":1376.73,"k":2571.24,"l":""},{"a":"QY_2024","b":"QY-631","c":"钢桁梁拼装脚手架制安拆","d":"调直、整平、划线、下料、钻孔、组拼、拆除。","e":"10t","f":"","g":24892.68,"h":0.965,"i":15227.36,"j":5342.02,"k":4323.3,"l":""},{"a":"QY_2024","b":"QY-632","c":"钢桁梁下挖运料道(包括轨道间走行板)","d":"铺拆钢轨及配件、枕木、走行板、栏杆、分配梁等制安拆。","e":"100m","f":"","g":10401.98,"h":1.225,"i":6760.51,"j":3507.67,"k":133.8,"l":""}]
- 2025-03-10 19:28:42,833 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_43.png
- 2025-03-10 19:28:42,833 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_44.png
- 2025-03-10 19:28:42,833 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_44.png
- 2025-03-10 19:29:15,241 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-633","c":"钢桁梁下弦人行道及栏杆","d":"铺拆钢轨及配件、枕木、走行板、栏杆、分配梁等制安拆。","e":"100m","f":"","g":9849.18,"h":1.038,"i":7084.62,"j":2666.47,"k":98.09,"l":""},{"a":"QY_2024","b":"QY-634","c":"钢桁梁上弦起重机走道分配梁","d":"铺拆钢轨及配件、枕木、走行板、栏杆、分配梁等制安拆。","e":"100m","f":"","g":137107.391,"h":15.261,"i":44172.71,"j":64423.18,"k":28511.5,"l":""},{"a":"QY_2024","b":"QY-635","c":"钢桁梁上弦吊索架走道","d":"铺拆钢轨及配件、枕木、走行板、栏杆、分配梁等制安拆。","e":"100m","f":"","g":36897.29,"h":7.331,"i":14674.08,"j":22069.67,"k":153.54,"l":""},{"a":"QY_2024","b":"QY-636","c":"吊索塔架制安拆","d":"塔架及上下锚箱制安拆、吊索安拆。","e":"10t/件","f":"","g":36818.65,"h":1.682,"i":19215.58,"j":9691.19,"k":7911.86,"l":""},{"a":"QY_2024","b":"QY-637","c":"吊索塔架卸载","d":"千斤顶起落、张拉、卸载。","e":"1孔","f":"","g":50979.21,"h":0,"i":23789.14,"j":150.83,"k":27039.24,"l":""}]
- 2025-03-10 19:29:15,308 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_44.png
- 2025-03-10 19:29:15,308 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_45.png
- 2025-03-10 19:29:15,309 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_45.png
- 2025-03-10 19:29:47,887 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-638","c":"吊索塔架走行","d":"准备、检查、整理钢丝束、卷扬机牵引走行。","e":"1孔","f":"","g":92625.71,"h":0.035,"i":18074.5,"j":1587.78,"k":72963.43,"l":""},{"a":"QY_2024","b":"QY-639","c":"安全网安拆","d":"墩顶装拆钢支架、安拆钢丝绳及安全网。","e":"100m","f":"","g":45757.46,"h":1.077,"i":6008.82,"j":38737.52,"k":1011.12,"l":""},{"a":"QY_2024","b":"QY-640","c":"吊装法拼装钢梁","d":"吊装钢梁、焊接、安装螺栓、隔板、支撑等连接件,支座安装。","e":"10t","f":"","g":3342.19,"h":0.214,"i":1415.7,"j":1208.78,"k":714.71,"l":""},{"a":"QY_2024","b":"QY-641","c":"路基上拼装钢梁","d":"钢梁调整对位、焊接、横隔板焊接、焊缝打磨、鹰架而连梁。","e":"10t","f":"","g":2509.21,"h":0.09,"i":866.13,"j":877.63,"k":765.45,"l":""},{"a":"QY_2024","b":"QY-642","c":"桥面板混凝土浇筑","d":"脚手及托架安拆、模板安拆、混凝土泵送、浇灌、振捣、顶面找坡抹平、养护等。","e":"10m³","f":"HT-0(10.200):","g":3070.13,"h":0.081,"i":1466.65,"j":1123.53,"k":477.95,"l":""}]
- 2025-03-10 19:29:47,951 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_45.png
- 2025-03-10 19:29:47,951 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_46.png
- 2025-03-10 19:29:47,951 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_46.png
- 2025-03-10 19:30:16,914 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-643","c":"桥面板钢筋","d":"钢筋绑扎,吊装、定位、校正。","e":"t","f":"","g":5124.68,"h":1.036,"i":1251.23,"j":3710.35,"k":163.1,"l":""},{"a":"QY_2024","b":"QY-644","c":"拖拉法 滑道及动力安装","d":"滑道钢轨调直、打磨、吊装、拼接、定位、滑草焊接、打磨、安装,滑块加工、安装,卷扬拖拉基础浇筑,拖拉动力系统安装。","e":"10双延米","f":"","g":4066.08,"h":1.531,"i":2976.24,"j":345.34,"k":744.5,"l":""},{"a":"QY_2024","b":"QY-645","c":"拖拉法 拖拉钢梁","d":"拖拉设备调试、滑道清理、卷扬机拖拉钢梁、千斤顶落梁、支座调整就位等。","e":"1000×10...","f":"","g":4773.37,"h":0.237,"i":2369.53,"j":790.31,"k":1613.53,"l":""},{"a":"QY_2024","b":"QY-646","c":"钢管拱架设(悬臂扣挂法)","d":"吊装前的准备工作,起吊,对位,焊接,抛锚,起锚,扣索制安拆、调整,体系转换。","e":"t","f":"","g":6385.11,"h":0.056,"i":3895.47,"j":696.26,"k":1793.38,"l":""},{"a":"QY_2024","b":"QY-647","c":"钢管拱内混凝土","d":"拱内清洗,支架安拆,混凝土浇筑及养护。","e":"10m3","f":"HT-0(10.200):","g":3615.05,"h":0.835,"i":805.29,"j":2702.29,"k":107.47,"l":""}]
- 2025-03-10 19:30:16,992 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_46.png
- 2025-03-10 19:30:16,992 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_47.png
- 2025-03-10 19:30:16,992 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_47.png
- 2025-03-10 19:31:25,166 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-648","c":"系杆安装","d":"安装锚具,张拉,封锚头。","e":"t","f":"","g":25283.1,"h":1.035,"i":4802.96,"j":17746.58,"k":2733.56,"l":""},{"a":"QY_2024","b":"QY-649","c":"钢管拱桥面拼装","d":"吊装前准备、起吊、对位、焊接、合拢段安装及精调。","e":"1t","f":"","g":2284.45,"h":0,"i":297.24,"j":237.83,"k":1749.38,"l":""},{"a":"QY_2024","b":"QY-650","c":"钢管拱竖向转体","d":"转体前准备、试转、正式转体。","e":"10t","f":"","g":586.95,"h":0,"i":228.52,"j":0,"k":358.43,"l":""},{"a":"QY_2024","b":"QY-651","c":"钢管拱外包混凝土","d":"支架、平台及模板安拆;混凝土浇筑、振捣、养护,凿毛;拱上材料倒运。","e":"10m³","f":"HT-0(10.200);","g":27439.02,"h":2.162,"i":9696.19,"j":12967.31,"k":4775.52,"l":""},{"a":"QY_2024","b":"QY-652","c":"钢管拱外包钢筋","d":"调直、切断、焊接、弯制、绑扎;拱上材料倒运。","e":"t","f":"","g":7568.84,"h":1.031,"i":3269.78,"j":3717.95,"k":581.11,"l":""}]
- 2025-03-10 19:31:25,224 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_47.png
- 2025-03-10 19:31:25,224 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_48.png
- 2025-03-10 19:31:25,224 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_48.png
- 2025-03-10 19:32:02,143 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-653","c":"钢箱拱架设水上吊装","d":"吊装前的准备工作,起吊,对位,焊接,抛锚、起锚,扣索制安拆、调整。","e":"t","f":"","g":4284.56,"h":0.041,"i":1035.42,"j":630.91,"k":2618.23,"l":""},{"a":"QY_2024","b":"QY-654","c":"爬升吊机架设钢桁拱梁(陆上)","d":"杆件预拼、高强度螺栓施拧、顶落梁、钢梁就位、调整、高强度螺栓检验、电板校正,场内运输,扣索制安拆、调整。","e":"10t","f":"","g":18169.66,"h":0.51,"i":5483.53,"j":5302.2,"k":7383.93,"l":""},{"a":"QY_2024","b":"QY-655","c":"爬升吊机架设钢桁拱梁(水上)","d":"杆件预拼、高强度螺栓施拧、顶落梁、钢梁就位、调整、高强度螺栓检验、电板校正,场内运输,扣索制安拆、调整。","e":"10t","f":"","g":23060.61,"h":0.51,"i":5483.53,"j":5302.2,"k":12274.2,"l":""},{"a":"QY_2024","b":"QY-656","c":"钢拱扣索塔架制安拆","d":"塔架制安拆。","e":"10t·杆件","f":"","g":48872.37,"h":3.527,"i":17699.24,"j":15206.34,"k":15966.79,"l":""},{"a":"QY_2024","b":"QY-657","c":"钢桁梁悬臂架设 陆上","d":"杆件预拼、高强度螺栓施拧:顶落梁、钢梁就位、调整,高栓检验,电板校正。","e":"10t","f":"","g":15516.75,"h":0.293,"i":4614.51,"j":4009.61,"k":6892.63,"l":""}]
- 2025-03-10 19:32:02,206 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_48.png
- 2025-03-10 19:32:02,206 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_49.png
- 2025-03-10 19:32:02,206 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_49.png
- 2025-03-10 19:32:48,461 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-658","c":"钢桁梁悬臂架设水上","d":"杆件预拼、高强度螺栓施拧;顶落梁、钢梁就位、调整;高栓检验、电板校正。","e":"10t","f":"18022.21","g":18022.21,"h":0.293,"i":4614.51,"j":4009.61,"k":9398.09,"l":""},{"a":"QY_2024","b":"QY-659","c":"斜拉索挂索","d":"挂索;塔顶膺架、脚手架、塔内平台、索盘支架、入索装置、梁端锚箱平台等临时设施制安拆。","e":"10t","f":"26542.42","g":26542.42,"h":0.409,"i":5957.79,"j":3502.62,"k":17082.01,"l":""},{"a":"QY_2024","b":"QY-660","c":"斜拉索张拉","d":"斜拉索张拉:梁架设过程中将索力张拉至设计索力。","e":"根·次","f":"2112.84","g":2112.84,"h":0,"i":1650.34,"j":0,"k":462.5,"l":""},{"a":"QY_2024","b":"QY-661","c":"斜拉索调索","d":"合龙后调整索力。","e":"根·次","f":"438.82","g":438.82,"h":0,"i":333.77,"j":0,"k":105.05,"l":""},{"a":"QY_2024","b":"QY-662","c":"钢桥梁油漆面漆一度","d":"脚手架搭拆、清理、涂漆。","e":"10t构件","f":"1098.34","g":1098.34,"h":0,"i":887.53,"j":144.04,"k":66.77,"l":""}]
- 2025-03-10 19:32:48,540 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_49.png
- 2025-03-10 19:32:48,540 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_50.png
- 2025-03-10 19:32:48,540 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_50.png
- 2025-03-10 19:33:23,541 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-663","c":"钢桁梁油漆面漆一度","d":"脚手架搭拆,清理,涂漆。","e":"10t构件","f":"","g":1269.47,"h":0.065,"i":825.73,"j":358.69,"k":85.05,"l":""},{"a":"QY_2024","b":"QY-664","c":"弧形支座","d":"支座安装、校正中线、防护罩制安。","e":"单线孔","f":"","g":3588.59,"h":0.228,"i":327.75,"j":1037.1,"k":2223.74,"l":""},{"a":"QY_2024","b":"QY-665","c":"平板支座","d":"支座安装、校正中线、防护罩制安。","e":"单线孔","f":"","g":1091.54,"h":0.204,"i":327.75,"j":763.79,"k":0,"l":""},{"a":"QY_2024","b":"QY-666","c":"摇轴(圆柱面钢)支座 lp=20m","d":"支座安装、校正中线、防护罩制安。","e":"单线孔","f":"","g":979.97,"h":0.109,"i":473.5,"j":469.56,"k":36.91,"l":""},{"a":"QY_2024","b":"QY-667","c":"摇轴(圆柱面钢)支座 lp=24m","d":"支座安装、校正中线、防护罩制安。","e":"单线孔","f":"","g":1089.02,"h":0.109,"i":582.55,"j":469.56,"k":36.91,"l":""}]
- 2025-03-10 19:33:23,624 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_50.png
- 2025-03-10 19:33:23,624 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_51.png
- 2025-03-10 19:33:23,625 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_51.png
- 2025-03-10 19:34:18,655 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-668","c":"摇轴(圆柱面钢)支座1p=32m","d":"支座安装、校正中线、防护罩制安。","e":"单线孔","f":"","g":1234.77,"h":0.109,"i":728.3,"j":469.56,"k":36.91,"l":""},{"a":"QY_2024","b":"QY-669","c":"板式橡胶支座钢筋混凝土梁跨度(m)8","d":"支座安装、找正就位。","e":"单线孔","f":"","g":286.84,"h":0.008,"i":259.72,"j":27.12,"k":0,"l":""},{"a":"QY_2024","b":"QY-670","c":"板式橡胶支座钢筋混凝土梁跨度(m)10","d":"支座安装、找正就位。","e":"单线孔","f":"","g":365.1,"h":0.011,"i":328.49,"j":36.61,"k":0,"l":""},{"a":"QY_2024","b":"QY-671","c":"板式橡胶支座钢筋混凝土梁跨度(m)12","d":"支座安装、找正就位。","e":"单线孔","f":"","g":625.93,"h":0.014,"i":580.16,"j":45.77,"k":0,"l":""},{"a":"QY_2024","b":"QY-672","c":"板式橡胶支座钢筋混凝土梁跨度(m)16","d":"支座安装、找正就位。","e":"单线孔","f":"","g":647.28,"h":0.02,"i":580.16,"j":67.12,"k":0,"l":""}]
- 2025-03-10 19:34:18,733 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_51.png
- 2025-03-10 19:34:18,733 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_52.png
- 2025-03-10 19:34:18,734 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_52.png
- 2025-03-10 19:35:23,562 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-673","c":"板式橡胶支座 钢筋混凝土梁 跨度(m) 20","d":"支座安装、找正就位。","e":"单线孔","f":"","g":1087.78,"h":0.026,"i":1001,"j":86.78,"k":0,"l":""},{"a":"QY_2024","b":"QY-674","c":"盆式橡胶支座 承载力≤3000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":1258.78,"h":0.064,"i":536.15,"j":525.91,"k":196.72,"l":""},{"a":"QY_2024","b":"QY-675","c":"盆式橡胶支座 承载力≤4000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":1469.8,"h":0.083,"i":597.17,"j":670.8,"k":201.79,"l":""},{"a":"QY_2024","b":"QY-676","c":"盆式橡胶支座 承载力≤5000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":2023.13,"h":0.103,"i":936.1,"j":815.24,"k":271.79,"l":""},{"a":"QY_2024","b":"QY-677","c":"盆式橡胶支座 承载力≤7000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":2855.88,"h":0.144,"i":1442.42,"j":1034.86,"k":378.6,"l":""}]
- 2025-03-10 19:35:23,631 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_52.png
- 2025-03-10 19:35:23,631 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_53.png
- 2025-03-10 19:35:23,632 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_53.png
- 2025-03-10 19:36:22,001 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-678","c":"盆式橡胶支座 承载力≤10000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":4504.26,"h":0.218,"i":2206.52,"j":1836.83,"k":460.91,"l":""},{"a":"QY_2024","b":"QY-679","c":"盆式橡胶支座 承载力≤15000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":6737.46,"h":0.285,"i":3622.24,"j":2698.43,"k":416.79,"l":""},{"a":"QY_2024","b":"QY-680","c":"盆式橡胶支座 承载力≤20000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":9543.26,"h":0.366,"i":5275.6,"j":3829.4,"k":438.26,"l":""},{"a":"QY_2024","b":"QY-681","c":"盆式橡胶支座 承载力≤30000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":14086.11,"h":0.489,"i":6857.51,"j":6689,"k":539.6,"l":""},{"a":"QY_2024","b":"QY-682","c":"盆式橡胶支座 承载力≤40000kN","d":"找平,就位,模板安拆,灌浆料拌制、浇筑及养护,支座及防护罩安装。","e":"个","f":"","g":20234.97,"h":0.643,"i":8480.44,"j":10906.02,"k":848.51,"l":""}]
- 2025-03-10 19:36:22,069 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_53.png
- 2025-03-10 19:36:22,069 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_54.png
- 2025-03-10 19:36:22,069 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_54.png
- 2025-03-10 19:36:50,154 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-683","c":"预制简支梁支座安装","d":"在梁场内将支座安装于梁底,架梁时安装支座,精度测定,找平、就位,立模、灌浆、养护、拆模;支座解锁,安装防护罩。","e":"个","f":"","g":1140.34,"h":0.009,"i":546,"j":402.44,"k":191.9,"l":""},{"a":"QY_2024","b":"QY-684","c":"钢桁梁临时支座安拆","d":"运料、顶落钢梁、铺折扣轨束、钢垫块等。","e":"10t","f":"","g":7616.53,"h":0.1,"i":6270.63,"j":1344.33,"k":1.57,"l":""},{"a":"QY_2024","b":"QY-685","c":"钢桁梁支座安装","d":"起顶钢梁、支座安装、落梁就位、校正中线、防护罩制安。","e":"10t","f":"","g":10800.14,"h":0.623,"i":9557.96,"j":958.51,"k":283.67,"l":""},{"a":"QY_2024","b":"QY-686","c":"球形钢支座 承载力 25000kN","d":"起顶的梁,找平、就位,支座安装,模板安拆,灌浆料拌制、浇筑及养护,防护罩制安。","e":"个","f":"","g":9235.41,"h":0.184,"i":4781.52,"j":2931.52,"k":1522.37,"l":""},{"a":"QY_2024","b":"QY-687","c":"球形钢支座 承载力 35000kN","d":"起顶的梁,找平、就位,支座安装,模板安拆,灌浆料拌制、浇筑及养护,防护罩制安。","e":"个","f":"","g":9846.18,"h":0.184,"i":5033.18,"j":3426.54,"k":1386.46,"l":""}]
- 2025-03-10 19:36:50,226 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_54.png
- 2025-03-10 19:36:50,226 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_55.png
- 2025-03-10 19:36:50,226 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_55.png
- 2025-03-10 19:37:16,262 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-688","c":"球形钢支座 承载力 40000kN","d":"起顶钢梁.找平.就位.支座安装.模板安装.灌浆料拌制、浇筑及养护.防护罩制安。","e":"个","f":"","g":11246.34,"h":0.186,"i":5298.28,"j":4495.99,"k":1452.07,"l":""},{"a":"QY_2024","b":"QY-689","c":"球形钢支座 承载力 60000kN","d":"起顶钢梁.找平.就位.支座安装.模板安装.灌浆料拌制、浇筑及养护.防护罩制安。","e":"个","f":"","g":13141.44,"h":0.186,"i":5563.22,"j":6053.62,"k":1524.6,"l":""},{"a":"QY_2024","b":"QY-690","c":"球形钢支座 承载力 100000kN","d":"起顶钢梁.找平.就位.支座安装.模板安装.灌浆料拌制、浇筑及养护.防护罩制安。","e":"个","f":"","g":15780.40,"h":0.187,"i":5841.29,"j":8334.2,"k":1604.9,"l":""},{"a":"QY_2024","b":"QY-691","c":"小构件预制 混凝土","d":"模板安装、调整、刷脱模剂、拆除、清理堆放:混凝土浇筑、振捣、养护.场内集中堆放。","e":"10m3","f":"HT-0(10.200):","g":3999.95,"h":0.064,"i":3454.85,"j":468.99,"k":76.11,"l":""},{"a":"QY_2024","b":"QY-692","c":"小构件预制 钢筋","d":"调直、除锈、配料、制弯、绑扎、定位、校正。","e":"t","f":"","g":4566.36,"h":1.041,"i":815.43,"j":3682,"k":68.93,"l":""}]
- 2025-03-10 19:37:16,320 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_55.png
- 2025-03-10 19:37:16,320 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_56.png
- 2025-03-10 19:37:16,320 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_56.png
- 2025-03-10 19:37:43,247 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-693","c":"小型构件安装","d":"吊装、安置,调整预制件,点焊连接筋,水泥砂浆拌制,垫层找平及填缝。","e":"10m3","f":"","g":2990.46,"h":0.897,"i":2037.7,"j":107.53,"k":845.23,"l":""},{"a":"QY_2024","b":"QY-694","c":"小型构件运输装卸","d":"装车、支垫、卸车、堆码。","e":"10m3","f":"","g":642.97,"h":0.004,"i":184.59,"j":8.14,"k":450.24,"l":""},{"a":"QY_2024","b":"QY-695","c":"小型构件运输每运1km","d":"运输、空回。","e":"10m3","f":"","g":21.16,"h":0,"i":0,"j":0,"k":21.16,"l":""},{"a":"QY_2024","b":"QY-696","c":"钢制桥上栏杆(电缆槽托架)制作","d":"金属构件制作、油漆。","e":"t","f":"","g":7828.28,"h":1.049,"i":2436.48,"j":5199.08,"k":192.72,"l":""},{"a":"QY_2024","b":"QY-697","c":"钢制桥上栏杆(电缆槽托架)安装","d":"金属构件安装。","e":"t","f":"","g":2486.59,"h":0.001,"i":1779.56,"j":410.2,"k":296.83,"l":""}]
- 2025-03-10 19:37:43,326 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_56.png
- 2025-03-10 19:37:43,326 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_57.png
- 2025-03-10 19:37:43,326 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_57.png
- 2025-03-10 19:38:04,806 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-698","c":"钢筋混凝土栏杆预制 混凝土","d":"模板安拆,混凝土拌制、浇筑、养护,场内堆放。","e":"10m3","f":"HT-0(10.200);","g":3100.97,"h":0.042,"i":2586.15,"j":347.06,"k":167.76,"l":""},{"a":"QY_2024","b":"QY-699","c":"钢筋混凝土栏杆预制 钢筋","d":"调直、切断、焊接、弯制、绑扎。","e":"t","f":"","g":4623.97,"h":1.044,"i":918.91,"j":3636.03,"k":69.03,"l":""},{"a":"QY_2024","b":"QY-700","c":"钢筋混凝土栏杆安装","d":"吊装、定位、固定。","e":"100单侧米","f":"","g":13025.57,"h":0.002,"i":11796.17,"j":232.51,"k":996.89,"l":""},{"a":"QY_2024","b":"QY-701","c":"钢梁桥面防护网 制作","d":"防护网制作、油漆。","e":"100m2","f":"","g":29064.35,"h":2.757,"i":9624.58,"j":18109.9,"k":1329.87,"l":""},{"a":"QY_2024","b":"QY-702","c":"钢梁桥面防护网 安装","d":"防护网安装。","e":"100m2","f":"","g":5333.63,"h":0,"i":1666.27,"j":3383.4,"k":283.96,"l":""}]
- 2025-03-10 19:38:04,898 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_57.png
- 2025-03-10 19:38:04,898 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_58.png
- 2025-03-10 19:38:04,898 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_58.png
- 2025-03-10 19:38:36,182 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-703","c":"钢梁电缆槽道安装","d":"钢电缆槽道制作、油漆。","e":"100延米桥长","f":"","g":55005.74,"h":6.169,"i":16981.82,"j":34841.73,"k":3182.19,"l":""},{"a":"QY_2024","b":"QY-704","c":"钢梁电缆槽道制作","d":"电缆槽道安装。","e":"100延米桥长","f":"","g":4946.89,"h":0,"i":3729.23,"j":608.4,"k":609.26,"l":""},{"a":"QY_2024","b":"QY-705","c":"钢梁明桥面风水管路制作","d":"钢支架制作。","e":"100延米桥长","f":"","g":12217.75,"h":1.246,"i":2477.36,"j":6706.43,"k":3033.96,"l":""},{"a":"QY_2024","b":"QY-706","c":"钢梁明桥面风水管路安装","d":"管路安装、油漆、焊接法兰盘。","e":"100延米桥长","f":"","g":13062.63,"h":0.018,"i":5180.98,"j":7729.82,"k":151.83,"l":""},{"a":"QY_2024","b":"QY-707","c":"梁端伸缩缝制安 T型 160km/h","d":"连接钢筋焊接,清扫、冲洗,修补梁端,锚固钢筋与预埋钢板焊接,安装伸缩缝,钢盖板制安,整理。","e":"10横延米","f":"","g":3926.97,"h":0.669,"i":986.91,"j":2635.35,"k":302.71,"l":""}]
- 2025-03-10 19:38:36,252 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_58.png
- 2025-03-10 19:38:36,252 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_59.png
- 2025-03-10 19:38:36,252 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_59.png
- 2025-03-10 19:39:14,635 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-708","c":"梁端伸缩缝制安T梁200km/h","d":"连接钢筋焊接;清扫、冲洗、修补梁端,锚固钢筋与预埋钢板焊接,安装伸缩缝,钢盖板制安,整理。","e":"10横延米","f":"","g":5124.25,"h":1.72,"i":1179.62,"j":3484.9,"k":459.73,"l":""},{"a":"QY_2024","b":"QY-709","c":"耐候钢梁端伸缩缝安装箱梁无砟轨道","d":"连接钢筋焊接;清扫、冲洗、修补梁端,安装耐候钢伸缩缝;整理。","e":"10横延米","f":"","g":7599.54,"h":0.133,"i":1170.77,"j":6405.83,"k":22.94,"l":""},{"a":"QY_2024","b":"QY-710","c":"耐候钢梁端伸缩缝安装箱梁有砟轨道","d":"连接钢筋焊接;清扫、冲洗、修补梁端;安装耐候钢伸缩缝;整理。","e":"10横延米","f":"","g":12471.33,"h":0.49,"i":1286.64,"j":11161.75,"k":22.94,"l":""},{"a":"QY_2024","b":"QY-711","c":"聚氨酯弹性体伸缩缝制安梁缝宽100mm","d":"基层处理;测水份,底座安装、端封、刷底涂料,浇筑弹性体,刷面涂料,清理。","e":"m","f":"","g":1179.76,"h":0,"i":402.33,"j":740.58,"k":36.85,"l":""},{"a":"QY_2024","b":"QY-712","c":"聚氨酯弹性体伸缩缝制安每增减10mm","d":"基层处理;测水份,底座安装、端封、刷底涂料,浇筑弹性体,刷面涂料,清理。","e":"m","f":"","g":109.9,"h":0,"i":32.19,"j":74.05,"k":3.66,"l":""}]
- 2025-03-10 19:39:14,689 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_59.png
- 2025-03-10 19:39:14,689 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_60.png
- 2025-03-10 19:39:14,689 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_60.png
- 2025-03-10 19:40:14,306 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-713","c":"铝合金可更换伸缩缝制安TSSF-100有砟轨道","d":"连接钢筋焊接,清扫、冲洗、修补梁端,安装伸缩缝,清理。","e":"m","f":"","g":1145.18,"h":0.039,"i":225.95,"j":907.79,"k":11.44,"l":""},{"a":"QY_2024","b":"QY-714","c":"铝合金可更换伸缩缝制安TSSF-100无砟轨道","d":"连接钢筋焊接,清扫、冲洗、修补梁端,安装伸缩缝,清理。","e":"m","f":"","g":801.71,"h":0.007,"i":205.51,"j":585.79,"k":10.41,"l":""},{"a":"QY_2024","b":"QY-715","c":"挡砟(防撞)墙及竖墙混凝土","d":"模板安装、调整、刷脱模剂、拆除、清理堆放;混凝土浇筑、振捣、养护。","e":"10m³","f":"HT-0(10.200);","g":3643.33,"h":0.178,"i":2769.12,"j":721.89,"k":152.32,"l":""},{"a":"QY_2024","b":"QY-716","c":"挡砟(防撞)墙及竖墙钢筋","d":"调直、除锈、配料、制弯、绑扎、定位、校正。","e":"t","f":"","g":4838.68,"h":1.03,"i":937.74,"j":3690.16,"k":210.78,"l":""},{"a":"QY_2024","b":"QY-717","c":"公路桥面结合板场内预拌混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,凿毛。","e":"10m³","f":"HT-0(10.200);","g":4660.1,"h":0.36,"i":2689.62,"j":1508.8,"k":461.68,"l":""}]
- 2025-03-10 19:40:14,381 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_60.png
- 2025-03-10 19:40:14,381 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_61.png
- 2025-03-10 19:40:14,381 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_61.png
- 2025-03-10 19:40:38,485 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-718","c":"公路桥面结合板安装","d":"预拼,吊装、安装,垫水泥砂浆,橡胶条铺垫。","e":"10m3","f":"","g":3551.18,"h":0.091,"i":2444.85,"j":337.51,"k":768.82,"l":""},{"a":"QY_2024","b":"QY-719","c":"公路桥面结合板湿接缝混凝土","d":"模板制安拆,混凝土浇筑、抹平、养护。","e":"10m3","f":"HT-0(10.200):","g":5419.34,"h":0.507,"i":4112.57,"j":1067.51,"k":239.26,"l":""},{"a":"QY_2024","b":"QY-720","c":"围栏制作","d":"钢结构制作、油漆。","e":"t","f":"","g":6475.31,"h":1.043,"i":1368.71,"j":4967.7,"k":138.9,"l":""},{"a":"QY_2024","b":"QY-721","c":"围栏安装","d":"钢结构安装。","e":"t","f":"","g":976.58,"h":0.005,"i":541.85,"j":43.1,"k":391.63,"l":""},{"a":"QY_2024","b":"QY-722","c":"吊篮支架、栏杆、检查梯制作","d":"钢结构制作、油漆。","e":"t","f":"","g":6678.65,"h":0.994,"i":1850.86,"j":4727.61,"k":100.18,"l":""}]
- 2025-03-10 19:40:38,531 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_61.png
- 2025-03-10 19:40:38,531 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_62.png
- 2025-03-10 19:40:38,531 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_62.png
- 2025-03-10 19:40:58,504 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-723","c":"吊篮支架、栏杆、检查梯安装","d":"钢结构安装。","e":"t","f":"","g":1990.87,"h":0.002,"i":1238.2,"j":450.82,"k":301.85,"l":""},{"a":"QY_2024","b":"QY-724","c":"混凝土梁活动检查梯制作","d":"钢结构制作、油漆。","e":"t","f":"","g":7279.19,"h":1.109,"i":2016.13,"j":5255.02,"k":8.04,"l":""},{"a":"QY_2024","b":"QY-725","c":"混凝土梁活动检查梯安装","d":"钢结构安装。","e":"t","f":"","g":1202.78,"h":0,"i":546.84,"j":654.25,"k":1.69,"l":""},{"a":"QY_2024","b":"QY-726","c":"钢筋混凝土拱桥检查设施制作","d":"钢结构制作、油漆。","e":"t","f":"","g":5321.88,"h":1.015,"i":937.42,"j":4335.6,"k":48.86,"l":""},{"a":"QY_2024","b":"QY-727","c":"钢筋混凝土拱桥检查设施安装铁箍","d":"钢结构安装。","e":"t","f":"","g":363.76,"h":0.007,"i":340.53,"j":23.23,"k":0,"l":""}]
- 2025-03-10 19:40:58,536 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_62.png
- 2025-03-10 19:40:58,536 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_63.png
- 2025-03-10 19:40:58,536 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_63.png
- 2025-03-10 19:41:20,419 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-728","c":"钢筋混凝土拱桥检查设施安装护栅","d":"钢结构安装。","e":"t","f":"","g":3126.05,"h":0.007,"i":2403.81,"j":139.61,"k":582.63,"l":""},{"a":"QY_2024","b":"QY-729","c":"预应力混凝土梁检查车轨道制作","d":"钢结构制作、油漆。","e":"100m","f":"","g":35675.29,"h":4.712,"i":11041.09,"j":24607.88,"k":26.32,"l":""},{"a":"QY_2024","b":"QY-730","c":"预应力混凝土梁检查车轨道安装","d":"钢结构安装。","e":"100m","f":"","g":5881.74,"h":0,"i":2448.87,"j":1033.85,"k":2399.02,"l":""},{"a":"QY_2024","b":"QY-731","c":"钢筋混凝土电缆槽宽度(m)1.0","d":"就地浇筑槽道墙,钢筋混凝土电缆槽盖板制安。","e":"10m","f":"HT-0(2.900);","g":1742.84,"h":0.188,"i":946.91,"j":756.87,"k":39.06,"l":""},{"a":"QY_2024","b":"QY-732","c":"钢筋混凝土电缆槽宽度(m)1.5","d":"就地浇筑槽道墙,钢筋混凝土电缆槽盖板制安。","e":"10m","f":"HT-0(3.540);","g":2547.55,"h":0.275,"i":1371.61,"j":1114.34,"k":61.6,"l":""}]
- 2025-03-10 19:41:20,525 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_63.png
- 2025-03-10 19:41:20,525 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_64.png
- 2025-03-10 19:41:20,525 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_64.png
- 2025-03-10 19:42:02,353 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-733","c":"钢筋混凝土电缆槽宽度(m) 2.0","d":"就地浇捣槽道墙,钢筋混凝土电缆槽盖板制安。","e":"10m","f":"HT-0(4.900);","g":2882.8,"h":0.31,"i":1563.92,"j":1251.47,"k":67.41,"l":""},{"a":"QY_2024","b":"QY-734","c":"玻璃钢电缆槽(宽+高) ≤200","d":"组对、螺栓固定、弯头、三通或四通、盖板、隔板、附件安装。","e":"10m","f":"","g":765.34,"h":0,"i":148.86,"j":616.48,"k":0,"l":""},{"a":"QY_2024","b":"QY-735","c":"玻璃钢电缆槽(宽+高) ≤400","d":"组对、螺栓固定、弯头、三通或四通、盖板、隔板、附件安装。","e":"10m","f":"","g":1535.37,"h":0,"i":232.06,"j":1303.31,"k":0,"l":""},{"a":"QY_2024","b":"QY-736","c":"玻璃钢电缆槽(宽+高) ≤600","d":"组对、螺栓固定、弯头、三通或四通、盖板、隔板、附件安装。","e":"10m","f":"","g":2965.06,"h":0,"i":357.59,"j":2607.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-737","c":"玻璃钢电缆槽(宽+高) ≤800","d":"组对、螺栓固定、弯头、三通或四通、盖板、隔板、附件安装。","e":"10m","f":"","g":3886.4,"h":0,"i":600.11,"j":3286.29,"k":0,"l":""}]
- 2025-03-10 19:42:02,427 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_64.png
- 2025-03-10 19:42:02,427 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_65.png
- 2025-03-10 19:42:02,427 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_65.png
- 2025-03-10 19:42:39,713 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-738","c":"玻璃钢电缆槽(宽*高)≤1000","d":"组对,螺栓固定,弯头、三通或四通、盖板、隔板、附件安装。","e":"10m","f":"","g":5237.65,"h":0,"i":667.54,"j":4570.11,"k":0,"l":""},{"a":"QY_2024","b":"QY-739","c":"T梁防震落梁挡块制安制作","d":"钢筋制作,绑扎,安装,定位;旧钢轨截断,绑扎,定位,校正,涂装等。","e":"t","f":"","g":3713.59,"h":1.013,"i":753.64,"j":2941.99,"k":17.96,"l":""},{"a":"QY_2024","b":"QY-740","c":"T梁防震落梁挡块制安安装","d":"钢筋制作,绑扎,安装,定位;旧钢轨截断,绑扎,定位,校正,涂装等。","e":"t","f":"","g":519.92,"h":0.002,"i":383.17,"j":15.81,"k":120.94,"l":""},{"a":"QY_2024","b":"QY-741","c":"箱梁防震落梁挡块制作","d":"钢结构制作,油漆,安装,定位,校正等。","e":"t","f":"","g":5304.58,"h":1.056,"i":1298.38,"j":3848.7,"k":157.5,"l":""},{"a":"QY_2024","b":"QY-742","c":"箱梁防震落梁挡块安装","d":"钢结构制作,油漆,安装,定位,校正等。","e":"t","f":"","g":1185.17,"h":0.003,"i":548.61,"j":114.42,"k":522.14,"l":""}]
- 2025-03-10 19:42:39,810 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_65.png
- 2025-03-10 19:42:39,810 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_66.png
- 2025-03-10 19:42:39,810 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_66.png
- 2025-03-10 19:43:07,793 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-743","c":"排水管道安装 无砟轨道 引下式 中间","d":"箱梁中间排水管路安装及支、连、吊、固。外侧排水口的弯管粘接。梁上泄水管的防水固化封口。管盖安装。防撞墙下泄水篦子安装等。","e":"10延长米","f":"","g":1497.88,"h":0.017,"i":402.65,"j":1095.23,"k":"","l":""},{"a":"QY_2024","b":"QY-744","c":"排水管道安装 无砟轨道 引下式 双侧、三列","d":"箱梁中间排水管路安装及支、连、吊、固。外侧排水口的弯管粘接。梁上泄水管的防水固化封口。管盖安装。防撞墙下泄水篦子安装等。","e":"10延长米","f":"","g":3314.71,"h":0.151,"i":832.01,"j":2482.7,"k":"","l":""},{"a":"QY_2024","b":"QY-745","c":"排水管道安装 无砟轨道 直排式 双侧","d":"箱梁中间排水管路安装及支、连、吊、固。外侧排水口的弯管粘接。梁上泄水管的防水固化封口。管盖安装。防撞墙下泄水篦子安装等。","e":"10延长米","f":"","g":1150.78,"h":0.025,"i":225.14,"j":925.64,"k":"","l":""},{"a":"QY_2024","b":"QY-746","c":"排水管道安装 有砟轨道 引下式 双侧","d":"泄水管管口与梁体的防水固化封口等。各种接头与直管的粘接。管身与梁体、墩身的支吊。连接。管卡安装。防撞墙下泄水篦子安装等。","e":"10延长米","f":"","g":3107.31,"h":0.037,"i":904.75,"j":2202.56,"k":"","l":""},{"a":"QY_2024","b":"QY-747","c":"排水管道安装 有砟轨道 直排式 双侧","d":"泄水管与梁体固化封口。箱梁两侧泄水管及管座的安装。泄水管下部的弯管粘接。挡砟墙下泄水篦子安装等。","e":"10延长米","f":"","g":665.03,"h":0.005,"i":117,"j":548.03,"k":"","l":""}]
- 2025-03-10 19:43:07,805 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:43:07,808 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:43:07,821 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:43:07,838 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:43:07,842 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:43:07,842 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_66.png
- 2025-03-10 19:43:07,843 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_67.png
- 2025-03-10 19:43:07,843 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_67.png
- 2025-03-10 19:43:40,437 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-748","c":"桥梁地段综合接地增加简支箱梁","d":"梁部接地钢筋与接地端子的焊接。","e":"孔","f":"","g":92.65,"h":0.001,"i":31.06,"j":34.9,"k":26.69,"l":""},{"a":"QY_2024","b":"QY-749","c":"桥梁地段综合接地增加简支T形梁","d":"梁部接地钢筋与接地端子的焊接。","e":"孔","f":"","g":137.03,"h":0,"i":48.44,"j":47.86,"k":40.73,"l":""},{"a":"QY_2024","b":"QY-750","c":"桥梁地段综合接地增加大跨连续梁","d":"梁部接地钢筋与接地端子的焊接。","e":"联","f":"","g":118.33,"h":0.003,"i":34.44,"j":54.63,"k":29.26,"l":""},{"a":"QY_2024","b":"QY-751","c":"桥梁地段综合接地增加钻孔桩基础","d":"基础接地钢筋与接地端子的焊接。","e":"10处","f":"","g":433.55,"h":0,"i":150.47,"j":155.51,"k":127.57,"l":""},{"a":"QY_2024","b":"QY-752","c":"桥梁地段综合接地增加明挖基础","d":"基础接地钢筋与接地端子的焊接。","e":"10处","f":"","g":1366.1,"h":0,"i":480.54,"j":477.79,"k":407.77,"l":""}]
- 2025-03-10 19:43:40,524 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_67.png
- 2025-03-10 19:43:40,524 - INFO - 开始处理图片: ./temp_files/images/output/img/03/part_68.png
- 2025-03-10 19:43:40,524 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/03/part_68.png
- 2025-03-10 19:43:48,485 - INFO - 开始保存图片内到数据库:[{"a":"QV_2024","b":"QY-753","c":"梁、墩之间综合接地连接","d":"梁、墩之间综合接地连接制安。","e":"10处","f":"","g":37.66,"h":0.004,"i":10.78,"j":26.68,"k":0,"l":""}]
- 2025-03-10 19:43:48,513 - INFO - 图片处理完成: ./temp_files/images/output/img/03/part_68.png
- 2025-03-10 19:43:48,513 - INFO - 目录处理完成: ./temp_files/images/output/img/03/
- 2025-03-10 19:43:48,513 - INFO - 开始处理目录: ./temp_files/images/output/img/04/
- 2025-03-10 19:43:48,513 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_01.png
- 2025-03-10 19:43:48,513 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_01.png
- 2025-03-10 19:45:10,021 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-754","c":"现浇框架式桥涵 混凝土","d":"模板安拆、混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":3146.44,"h":0.204,"i":2174.23,"j":909.34,"k":62.87,"l":""},{"a":"QY_2024","b":"QY-755","c":"现浇框架式桥涵 钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4587.97,"h":1.033,"i":690.04,"j":3701.12,"k":196.81,"l":""},{"a":"QY_2024","b":"QY-756","c":"预制框架式桥涵 单孔 混凝土","d":"脚手架及支撑搭拆,模板制安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":2719.58,"h":0.194,"i":1876.09,"j":790.55,"k":52.94,"l":""},{"a":"QY_2024","b":"QY-757","c":"预制框架式桥涵 双孔 混凝土","d":"脚手架及支撑搭拆,模板制安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":2783.36,"h":0.198,"i":1911,"j":814.57,"k":57.79,"l":""},{"a":"QY_2024","b":"QY-758","c":"预制框架式桥涵 三、四孔 混凝土","d":"脚手架及支撑搭拆,模板制安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":3079.87,"h":0.203,"i":2189.07,"j":833.01,"k":57.79,"l":""}]
- 2025-03-10 19:45:10,110 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_01.png
- 2025-03-10 19:45:10,110 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_02.png
- 2025-03-10 19:45:10,110 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_02.png
- 2025-03-10 19:45:31,446 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-759","c":"预制框架式桥涵钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4487,"h":1.034,"i":636.4,"j":3696.04,"k":154.56,"l":""},{"a":"QY_2024","b":"QY-760","c":"钢筋混凝土板桩","d":"制作、吊桩、定位、施打、拔除、堆放。","e":"10m3","f":"HT-0(10.100);","g":3629.17,"h":0.121,"i":1922.48,"j":397.2,"k":1309.49,"l":""},{"a":"QY_2024","b":"QY-761","c":"打拔后背槽钢桩","d":"整理钢桩、吊运、定位、施打、校正、拔除、清除积土校正槽钢、堆放。","e":"t","f":"","g":4607.06,"h":0.131,"i":2197.42,"j":481.05,"k":1928.89,"l":""},{"a":"QY_2024","b":"QY-762","c":"钢轨后背梁安拆","d":"选择整理钢轨、组合、安装、拆除、清理、修整、堆放。","e":"t","f":"","g":629.71,"h":0.027,"i":393.54,"j":104.24,"k":131.93,"l":""},{"a":"QY_2024","b":"QY-763","c":"后背梁混凝土","d":"模板安拆、混凝土浇筑、振捣及养护、底板顶面抹平。","e":"10m3","f":"HT-0(10.200);","g":826.97,"h":0.009,"i":756.94,"j":65.18,"k":4.85,"l":""}]
- 2025-03-10 19:45:31,513 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_02.png
- 2025-03-10 19:45:31,514 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_03.png
- 2025-03-10 19:45:31,514 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_03.png
- 2025-03-10 19:46:20,819 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-764","c":"后背梁钢筋","d":"绑扎、安放、定位、校正。","e":"t","f":"","g":4273.11,"h":1.029,"i":524.67,"j":3679.66,"k":68.78,"l":""},{"a":"QY_2024","b":"QY-765","c":"后背梁砂浆片石M10","d":"砂浆制作、砌筑片石、养护。","e":"10m³","f":"HT-915(3.3...","g":1924.92,"h":27.442,"i":774.1,"j":1131.68,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-766","c":"后背梁钢柱接构件安拆","d":"构件制安拆、整修、堆放。","e":"t","f":"","g":1846.65,"h":0.188,"i":942.07,"j":760.85,"k":143.73,"l":""},{"a":"QY_2024","b":"QY-767","c":"底板混凝土","d":"模板安拆、混凝土浇筑、振捣及养护,底板顶面抹平。","e":"10m³","f":"HT-0(10.200);","g":1074.75,"h":0.063,"i":795.88,"j":256.02,"k":22.85,"l":""},{"a":"QY_2024","b":"QY-768","c":"底板钢筋","d":"绑扎、安放、定位、校正。","e":"t","f":"","g":4159.97,"h":1.024,"i":456.94,"j":3634.25,"k":68.78,"l":""}]
- 2025-03-10 19:46:20,900 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_03.png
- 2025-03-10 19:46:20,900 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_04.png
- 2025-03-10 19:46:20,900 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_04.png
- 2025-03-10 19:46:58,037 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-769","c":"底板隔层及润滑层","d":"砂浆制作、抹平、养护,熔涂石腊,铺塑料布等。","e":"10m2","f":"HT-915(0.3...","g":357.69,"h":0.592,"i":175.73,"j":181.96,"k":0,"l":""},{"a":"QY_2024","b":"QY-770","c":"顶部防护层混凝土","d":"混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200):","g":1604.99,"h":0,"i":1583.4,"j":20.48,"k":1.11,"l":""},{"a":"QY_2024","b":"QY-771","c":"桥涵身涂石蜡","d":"脚手架搭拆,清扫刚架身,喷涂涂面,熔化石蜡,涂石蜡。","e":"10m2","f":"","g":430.38,"h":0.009,"i":121.86,"j":308.5,"k":0,"l":""},{"a":"QY_2024","b":"QY-772","c":"框架式桥涵身聚氨脂弹性止水缝","d":"制作、填塞水泥砂浆、安装止水胶管、拌制及堵塞聚氨脂弹性胶。","e":"10m","f":"","g":388.83,"h":0.376,"i":127.4,"j":259.93,"k":1.5,"l":""},{"a":"QY_2024","b":"QY-773","c":"框架式桥涵身平板橡胶止水缝 止水带铁框制安","d":"裁切钢材,除锈,焊制抹箍,上底漆,刷防锈锌,吊装就位安装。","e":"10m","f":"","g":3835.44,"h":0.534,"i":1206.12,"j":1581.17,"k":1048.15,"l":""}]
- 2025-03-10 19:46:58,117 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_04.png
- 2025-03-10 19:46:58,118 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_05.png
- 2025-03-10 19:46:58,118 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_05.png
- 2025-03-10 19:47:21,188 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-774","c":"框架式桥涵身平板橡胶止水缝 平板止水带制安","d":"安装浸制沥青木板,剔除部分木板,嵌塞聚氯乙烯油膏、油灰,拧紧扣件。","e":"10m","f":"","g":2202.62,"h":0.125,"i":1150.77,"j":1051.85,"k":0,"l":""},{"a":"QY_2024","b":"QY-775","c":"框架式桥涵身平板橡胶止水缝 沉降缝中间橡胶止水带制安","d":"堵塞聚氯乙烯油膏,安装橡胶止水带等。","e":"10m","f":"","g":786.23,"h":0.006,"i":379.07,"j":407.16,"k":0,"l":""},{"a":"QY_2024","b":"QY-776","c":"人行道梁场内预制 混凝土","d":"模板制安拆,混凝土浇筑、振捣及养护,成品堆放。","e":"10m3","f":"HT-0(10.200);","g":4745.57,"h":0.131,"i":3722.49,"j":884.11,"k":138.97,"l":""},{"a":"QY_2024","b":"QY-777","c":"人行道梁场内预制 钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4497.32,"h":1.045,"i":617.16,"j":3742.23,"k":137.93,"l":""},{"a":"QY_2024","b":"QY-778","c":"人行道梁安装","d":"修正构件、吊装定位。","e":"10m3","f":"","g":851.99,"h":0,"i":436.65,"j":11.39,"k":403.95,"l":""}]
- 2025-03-10 19:47:21,271 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_05.png
- 2025-03-10 19:47:21,271 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_06.png
- 2025-03-10 19:47:21,271 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_06.png
- 2025-03-10 19:47:44,165 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-779","c":"钢刃脚制作","d":"下料、制作、除锈、涂油、堆放。","e":"t","f":"","g":5177.1,"h":0.67,"i":1868.63,"j":2519.25,"k":789.22,"l":""},{"a":"QY_2024","b":"QY-780","c":"钢刃脚安拆","d":"安装、拆除、整修。","e":"t","f":"","g":2132.6,"h":0.133,"i":1511.04,"j":433.59,"k":187.97,"l":""},{"a":"QY_2024","b":"QY-781","c":"预埋普通螺栓","d":"除锈、预埋、外露部分涂油。","e":"t","f":"","g":7648.59,"h":0,"i":1414.23,"j":5970.69,"k":263.67,"l":""},{"a":"QY_2024","b":"QY-782","c":"预埋普通钢件","d":"除锈、预埋、外露部分涂油。","e":"t","f":"","g":7972.39,"h":1.02,"i":1414.23,"j":6294.49,"k":263.67,"l":""},{"a":"QY_2024","b":"QY-783","c":"空顶桥涵身重量≤1000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁。试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":2256.13,"h":0.135,"i":1079.47,"j":671.74,"k":504.92,"l":""}]
- 2025-03-10 19:47:44,206 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_06.png
- 2025-03-10 19:47:44,206 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_07.png
- 2025-03-10 19:47:44,206 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_07.png
- 2025-03-10 19:48:33,690 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-784","c":"空顶桥涵身重量≤1500t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":2711.42,"h":0.169,"i":1291.9,"j":851.57,"k":567.95,"l":""},{"a":"QY_2024","b":"QY-785","c":"空顶桥涵身重量≤2000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":3473.21,"h":0.201,"i":1509.85,"j":1025.77,"k":937.59,"l":""},{"a":"QY_2024","b":"QY-786","c":"空顶桥涵身重量≤3000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":4510.20,"h":0.32,"i":1896.82,"j":1576.03,"k":1035.43,"l":""},{"a":"QY_2024","b":"QY-787","c":"空顶桥涵身重量≤4000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":5967.6,"h":0.455,"i":2757.59,"j":2150.26,"k":1059.75,"l":""},{"a":"QY_2024","b":"QY-788","c":"空顶桥涵身重量≤5000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":7941.59,"h":0.586,"i":3985.34,"j":2710.26,"k":1245.99,"l":""}]
- 2025-03-10 19:48:33,758 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_07.png
- 2025-03-10 19:48:33,758 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_08.png
- 2025-03-10 19:48:33,758 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_08.png
- 2025-03-10 19:49:20,301 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-789","c":"挖土顶进桥涵身重量≤1000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":3503.38,"h":0.135,"i":1928.15,"j":671.74,"k":903.49,"l":""},{"a":"QY_2024","b":"QY-790","c":"挖土顶进桥涵身重量≤1500t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":4179.37,"h":0.169,"i":2316.02,"j":851.57,"k":1011.78,"l":""},{"a":"QY_2024","b":"QY-791","c":"挖土顶进桥涵身重量≤2000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":5400.80,"h":0.201,"i":2696.73,"j":1025.77,"k":1677.56,"l":""},{"a":"QY_2024","b":"QY-792","c":"挖土顶进桥涵身重量≤3000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":6806.80,"h":0.32,"i":3387.58,"j":1578.03,"k":1841.19,"l":""},{"a":"QY_2024","b":"QY-793","c":"挖土顶进桥涵身重量≤4000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶、顶进操作及纠偏、拆除后的顶进设备分类堆码。","e":"m","f":"","g":8782.91,"h":0.411,"i":4924.43,"j":1971.44,"k":1887.04,"l":""}]
- 2025-03-10 19:49:20,383 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_08.png
- 2025-03-10 19:49:20,383 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_09.png
- 2025-03-10 19:49:20,384 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_09.png
- 2025-03-10 19:49:51,092 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-794","c":"挖土顶进桥涵身重量≤5000t","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶,项进操作及纠偏,拆除后的顶进设备分类堆码。","e":"m","f":"","g":12041.07,"h":0.586,"i":7116.33,"j":2710.26,"k":2214.48,"l":""},{"a":"QY_2024","b":"QY-795","c":"挖土顶进桥涵身重量≤1000t 顶拉法","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶,项进操作及纠偏。拆除后的顶进设备分类堆码。","e":"m","f":"","g":2072.77,"h":0.027,"i":1266.48,"j":147.17,"k":657.12,"l":""},{"a":"QY_2024","b":"QY-796","c":"挖土顶进桥涵身重量≤1000t 中间法","d":"安装千斤顶、油泵、油管路、控制台、配电盘及钢传力柱与横梁、试顶,项进操作及纠偏。拆除后的顶进设备分类堆码。","e":"m","f":"","g":3377.46,"h":0.119,"i":1266.48,"j":524.16,"k":1583.78,"l":""},{"a":"QY_2024","b":"QY-797","c":"接缝处隔板与钢筋销铆安","d":"制作、安装。","e":"m","f":"","g":511.32,"h":0.095,"i":127.4,"j":328.43,"k":55.49,"l":""},{"a":"QY_2024","b":"QY-798","c":"顶进框架身内挖土 人力挖装双轮车运弃","d":"人力挖装,胶轮车运,基坑外100m。","e":"10m3","f":"","g":496.94,"h":0,"i":416.81,"j":1.53,"k":78.6,"l":""}]
- 2025-03-10 19:49:51,167 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_09.png
- 2025-03-10 19:49:51,168 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_10.png
- 2025-03-10 19:49:51,168 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_10.png
- 2025-03-10 19:50:39,744 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-799","c":"顶进框架身内挖土 人挖机装汽车运弃","d":"人力挖土,装载机装,自卸汽车运弃,基坑外500m,出土走道平台制安拆。","e":"10m3","f":"","g":452.69,"h":0.011,"i":335.06,"j":36.69,"k":80.94,"l":""},{"a":"QY_2024","b":"QY-800","c":"框架身内路面 无路缘石 混凝土","d":"刷洗刚架桥底版面,凿除浮浆,混凝土浇筑、振捣及养护,带路缘石的路面包括路缘石的制作安砌、沥青灌缝。","e":"10m3","f":"HT-0(10.200):","g":808.92,"h":0,"i":804.68,"j":4.24,"k":0,"l":""},{"a":"QY_2024","b":"QY-801","c":"框架身内路面 有路缘石 混凝土","d":"刷洗刚架桥底版面,凿除浮浆,混凝土浇筑、振捣及养护,带路缘石的路面包括路缘石的制作安砌、沥青灌缝。","e":"10m3","f":"HT-0(10.200):","g":918.4,"h":0.009,"i":891.95,"j":26.41,"k":0.04,"l":""},{"a":"QY_2024","b":"QY-802","c":"边孔内支墩 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200):","g":2029.2,"h":0.051,"i":1685.2,"j":325.06,"k":18.85,"l":""},{"a":"QY_2024","b":"QY-803","c":"边孔内路面盖板制安 慢车道 混凝土","d":"制作、安砌。","e":"10m3","f":"HT-0(10.200):","g":3069.14,"h":0.03,"i":2876.04,"j":199.1,"k":14,"l":""}]
- 2025-03-10 19:50:39,815 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_10.png
- 2025-03-10 19:50:39,815 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_11.png
- 2025-03-10 19:50:39,815 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_11.png
- 2025-03-10 19:51:37,672 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-804","c":"边孔内路面盖板制安人行道混凝土","d":"制作、安砌。","e":"10m3","f":"HT-0(10.200);","g":4317.14,"h":0.258,"i":3714.58,"j":601.75,"k":0.81,"l":""},{"a":"QY_2024","b":"QY-805","c":"慢车道盖板钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4516.54,"h":1.045,"i":601.05,"j":3657.22,"k":258.27,"l":""},{"a":"QY_2024","b":"QY-806","c":"人行道盖板钢筋","d":"钢筋制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4721.09,"h":1.031,"i":748.59,"j":3714.23,"k":258.27,"l":""},{"a":"QY_2024","b":"QY-807","c":"D型梁安拆木枕地段跨度(m) 12","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整,垫支座;扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔次","f":"","g":11541.81,"h":24.625,"i":6314.06,"j":2651.47,"k":2576.28,"l":""},{"a":"QY_2024","b":"QY-808","c":"D型梁安拆木枕地段跨度(m) 16","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整,垫支座;扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔次","f":"","g":12467.22,"h":29.072,"i":6856.84,"j":3034.1,"k":2576.28,"l":""}]
- 2025-03-10 19:51:37,730 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_11.png
- 2025-03-10 19:51:37,730 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_12.png
- 2025-03-10 19:51:37,730 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_12.png
- 2025-03-10 19:52:26,017 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-809","c":"D型梁安拆 木枕地段 跨度(m) 20","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔.次","f":"15506.83","g":33.576,"h":8574.31,"i":3482.43,"j":3450.09,"k":"","l":""},{"a":"QY_2024","b":"QY-810","c":"D型梁安拆 木枕地段 跨度(m) 24","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔.次","f":"16499.04","g":37.969,"h":9117.66,"i":3931.29,"j":3450.09,"k":"","l":""},{"a":"QY_2024","b":"QY-811","c":"D型梁安拆 混凝土枕地段 跨度(m) 12","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔","f":"11963.26","g":24.625,"h":6735.51,"i":2651.47,"j":2576.28,"k":"","l":""},{"a":"QY_2024","b":"QY-812","c":"D型梁安拆 混凝土枕地段 跨度(m) 16","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔","f":"12918.8","g":29.072,"h":7308.42,"i":3034.1,"j":2576.28,"k":"","l":""},{"a":"QY_2024","b":"QY-813","c":"D型梁安拆 混凝土枕地段 跨度(m) 20","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔","f":"16078.9","g":33.576,"h":9146.38,"i":3482.43,"j":3450.09,"k":"","l":""}]
- 2025-03-10 19:52:26,031 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:26,034 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:26,046 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:26,061 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:26,076 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:26,077 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_12.png
- 2025-03-10 19:52:26,077 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_13.png
- 2025-03-10 19:52:26,077 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_13.png
- 2025-03-10 19:52:49,756 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-814","c":"D型梁安拆 混凝土枕地段 跨度(m)24","d":"调运纵横梁及连接件至路肩,调整枕距,纵梁就位,抽换枕木,换横梁,联结纵横梁,调整:垫支座:扣配件拆安,安装斜杆和所有连接系统,安挡砟板:道砟清...","e":"孔","f":"17101.23","g":37.969,"h":9719.85,"i":3931.29,"j":3450.09,"k":"","l":""},{"a":"QY_2024","b":"QY-815","c":"D型梁使用 每使用1季度 跨度(m)12","d":"巡视、维护,便梁摊销。","e":"孔","f":"8932.78","g":0.671,"h":4215.07,"i":4717.71,"j":"","k":"0","l":""},{"a":"QY_2024","b":"QY-816","c":"D型梁使用 每使用1季度 跨度(m)16","d":"巡视、维护,便梁摊销。","e":"孔","f":"11116.06","g":0.982,"h":4215.07,"i":6900.99,"j":"","k":"0","l":""},{"a":"QY_2024","b":"QY-817","c":"D型梁使用 每使用1季度 跨度(m)20","d":"巡视、维护,便梁摊销。","e":"孔","f":"14516.1","g":1.467,"h":4215.07,"i":10301.03,"j":"","k":"0","l":""},{"a":"QY_2024","b":"QY-818","c":"D型梁使用 每使用1季度 跨度(m)24","d":"巡视、维护,便梁摊销。","e":"孔","f":"17944.1","g":1.956,"h":4215.07,"i":13729.03,"j":"","k":"0","l":""}]
- 2025-03-10 19:52:49,785 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 19:52:49,789 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'material_cost' at row 1")
- 2025-03-10 19:52:49,815 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'material_cost' at row 1")
- 2025-03-10 19:52:49,830 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'material_cost' at row 1")
- 2025-03-10 19:52:49,834 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'material_cost' at row 1")
- 2025-03-10 19:52:49,835 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_13.png
- 2025-03-10 19:52:49,835 - INFO - 开始处理图片: ./temp_files/images/output/img/04/part_14.png
- 2025-03-10 19:52:49,835 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/04/part_14.png
- 2025-03-10 19:52:54,542 - INFO - 开始保存图片内到数据库:[{"a":"书号","b":"定额编号","c":"定额名称","d":"工作内容","e":"单位","f":"基本定额","g":null,"h":null,"i":null,"j":null,"k":null,"l":""}]
- 2025-03-10 19:52:54,558 - INFO - 图片处理完成: ./temp_files/images/output/img/04/part_14.png
- 2025-03-10 19:52:54,558 - INFO - 目录处理完成: ./temp_files/images/output/img/04/
- 2025-03-10 19:52:54,559 - INFO - 开始处理目录: ./temp_files/images/output/img/05/
- 2025-03-10 19:52:54,559 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_01.png
- 2025-03-10 19:52:54,559 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_01.png
- 2025-03-10 19:53:17,671 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-819","c":"涵洞基础浆砌片石M10","d":"搭拆脚手板,选、修、洗石,砂浆制作、安砌及养护。","e":"10m3","f":"HT-915(3.300);","g":1875.88,"h":27.442,"i":724.65,"j":1133.29,"k":17.94,"l":""},{"a":"QY_2024","b":"QY-820","c":"涵洞基础片石混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,洗刷、埋置片石。","e":"10m3","f":"HT-0(8.670);","g":940.46,"h":4.033,"i":695.65,"j":217.09,"k":27.72,"l":""},{"a":"QY_2024","b":"QY-821","c":"涵洞基础混凝土","d":"模板安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":1015.35,"h":0.104,"i":749.17,"j":238.14,"k":28.04,"l":""},{"a":"QY_2024","b":"QY-822","c":"涵洞基础 钢筋","d":"制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4222.52,"h":1.034,"i":451.29,"j":3701.69,"k":69.54,"l":""},{"a":"QY_2024","b":"QY-823","c":"涵洞墙身及端翼墙 浆砌片石M10","d":"选、修、洗石,砂浆制作、安砌及养护,脚手架搭拆。","e":"10m3","f":"HT-915(3.300);","g":2373.76,"h":27.456,"i":1190.79,"j":1164.88,"k":18.09,"l":""}]
- 2025-03-10 19:53:17,735 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_01.png
- 2025-03-10 19:53:17,735 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_02.png
- 2025-03-10 19:53:17,735 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_02.png
- 2025-03-10 19:53:49,901 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-824","c":"砌间墙身及端翼墙 砌砌块石M10","d":"选、修、洗石,砂浆制作、安砌及养护,脚手架搭拆。","e":"10m3","f":"HT-915(2.700);","g":2329.98,"h":26.236,"i":1126.76,"j":1188.43,"k":14.79,"l":""},{"a":"QY_2024","b":"QY-825","c":"端翼墙 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":2497.91,"h":0.28,"i":1799.43,"j":695.42,"k":3.06,"l":""},{"a":"QY_2024","b":"QY-826","c":"中边墙 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":1657.82,"h":0.053,"i":1402.08,"j":241.27,"k":14.47,"l":""},{"a":"QY_2024","b":"QY-827","c":"帽石、墙顶 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":3157.34,"h":0.478,"i":2010.86,"j":1143.76,"k":2.72,"l":""},{"a":"QY_2024","b":"QY-828","c":"双孔间填筑 混凝土","d":"模板安拆,混凝土浇筑、振捣及养护,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":878.51,"h":0,"i":874.15,"j":4.36,"k":0,"l":""}]
- 2025-03-10 19:53:49,977 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_02.png
- 2025-03-10 19:53:49,977 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_03.png
- 2025-03-10 19:53:49,977 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_03.png
- 2025-03-10 19:54:28,411 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-829","c":"场内预制管节混凝土 孔径(m)≤1.00","d":"模板安拆,混凝土浇筑、振捣及养护,管节堆放。","e":"10m3","f":"HT-0(10.200);","g":7230.91,"h":0.175,"i":5935.48,"j":1295.43,"k":0,"l":""},{"a":"QY_2024","b":"QY-830","c":"场内预制管节混凝土 孔径(m)≤2.00","d":"模板安拆,混凝土浇筑、振捣及养护,管节堆放。","e":"10m3","f":"HT-0(10.200);","g":5033.94,"h":0.118,"i":4154.26,"j":879.68,"k":0,"l":""},{"a":"QY_2024","b":"QY-831","c":"场内预制管节混凝土 孔径(m)≥2.00","d":"模板安拆,混凝土浇筑、振捣及养护,管节堆放。","e":"10m3","f":"HT-0(10.200);","g":4345.1,"h":0.098,"i":3620.44,"j":724.66,"k":0,"l":""},{"a":"QY_2024","b":"QY-832","c":"管节钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4377.51,"h":1.041,"i":689.9,"j":3640.67,"k":46.94,"l":""},{"a":"QY_2024","b":"QY-833","c":"现浇管座混凝土","d":"模板安拆,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":1359.68,"h":0.128,"i":1057.27,"j":301.13,"k":1.28,"l":""}]
- 2025-03-10 19:54:28,472 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_03.png
- 2025-03-10 19:54:28,472 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_04.png
- 2025-03-10 19:54:28,472 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_04.png
- 2025-03-10 19:55:06,552 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-834","c":"管节安装 孔径(m)≤1.00m","d":"制作砂浆,修正构件,吊装定位,砂浆嵌缝、养护。","e":"10m³混凝土","f":"HT-915(0.450);","g":1532.98,"h":0.87,"i":666.08,"j":80.15,"k":786.75,"l":""},{"a":"QY_2024","b":"QY-835","c":"管节安装 孔径(m)≥1.00m","d":"制作砂浆,修正构件,吊装定位,砂浆嵌缝、养护。","e":"10m³混凝土","f":"HT-915(0.370);","g":833.32,"h":0.715,"i":359.24,"j":66.57,"k":407.51,"l":""},{"a":"QY_2024","b":"QY-836","c":"圆涵顶进 准备工作","d":"除线路加固、底板及基坑开挖外的项顶进前一切准备工作。","e":"单孔每处","f":"","g":4130.08,"h":0.237,"i":3546.16,"j":583.92,"k":0,"l":""},{"a":"QY_2024","b":"QY-837","c":"C15底板混凝土及导轨","d":"夯填碎石垫层,模板制安拆、混凝土拌制、浇筑、振捣及养护,导轨、钢传力柱安拆。","e":"单孔每处","f":"HT-14(3.890);","g":3113.22,"h":9.224,"i":883.59,"j":1733.96,"k":495.67,"l":""},{"a":"QY_2024","b":"QY-838","c":"管节顶进 孔径(m)1","d":"吊装管节、千斤顶、油泵管路及控制台安拆,管节表面涂抹润滑剂,管节沉降缝防水处理及堵塞,管内挖土外运50m。","e":"m","f":"","g":891.88,"h":0.016,"i":369.52,"j":106.41,"k":415.95,"l":""}]
- 2025-03-10 19:55:06,663 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_04.png
- 2025-03-10 19:55:06,663 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_05.png
- 2025-03-10 19:55:06,663 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_05.png
- 2025-03-10 19:56:36,844 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-839","c":"管节顶进孔径(m)1.25","d":"吊装管节,千斤顶、油泵管路及控制台安拆,管节表面涂抹润滑剂,管节沉降缝防水处理及堵塞,管内挖土外运51m。","e":"m","f":"","g":998.12,"h":0.016,"i":454.1,"j":130.35,"k":413.67,"l":""},{"a":"QY_2024","b":"QY-840","c":"管节顶进孔径(m)1.5","d":"吊装管节,千斤顶、油泵管路及控制台安拆,管节表面涂抹润滑剂,管节沉降缝防水处理及堵塞,管内挖土外运52m。","e":"m","f":"","g":1154.62,"h":0.017,"i":558.68,"j":154.26,"k":441.68,"l":""},{"a":"QY_2024","b":"QY-841","c":"管节顶进孔径(m)2","d":"吊装管节,千斤顶、油泵管路及控制台安拆,管节表面涂抹润滑剂,管节沉降缝防水处理及堵塞,管内挖土外运53m。","e":"m","f":"","g":1556.84,"h":0.018,"i":848.69,"j":203.37,"k":504.78,"l":""},{"a":"QY_2024","b":"QY-842","c":"钢板内圈接口","d":"制作、安装、除锈、涂沥青。","e":"t","f":"","g":5291.32,"h":1.06,"i":1429.44,"j":3859.79,"k":2.09,"l":""},{"a":"QY_2024","b":"QY-843","c":"加固长度(m)≤5木枕地段","d":"吊轨梁架设及拆除,抽换枕木,整理线路及补充道砟,线路防护。","e":"每一股道","f":"","g":6960.43,"h":7.53,"i":5641.54,"j":1318.89,"k":0,"l":""}]
- 2025-03-10 19:56:36,901 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_05.png
- 2025-03-10 19:56:36,901 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_06.png
- 2025-03-10 19:56:36,901 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_06.png
- 2025-03-10 19:57:13,262 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-844","c":"加固长度(m)≤5混凝土枕地段","d":"吊轨梁架设及拆除、钢筋混凝土枕抽换成木枕、整理线路及补充道砟、线路防护、恢复钢筋混凝土枕。","e":"每一股道","f":"HT-0(10,200);","g":8554.33,"h":7.381,"i":7677.7,"j":876.63,"k":0,"l":""},{"a":"QY_2024","b":"QY-845","c":"加固长度(m)≤7木枕地段","d":"吊轨梁架设及拆除、抽换枕木、整理线路及补充道砟、线路防护。","e":"每一股道","f":"","g":10685.73,"h":10.524,"i":8879.79,"j":1805.94,"k":0,"l":""},{"a":"QY_2024","b":"QY-846","c":"加固长度(m)≤7混凝土枕地段","d":"吊轨梁架设及拆除、钢筋混凝土枕抽换成木枕、整理线路及补充道砟、线路防护、恢复钢筋混凝土枕。","e":"每一股道","f":"","g":12642.39,"h":10.315,"i":11455.98,"j":1186.41,"k":0,"l":""},{"a":"QY_2024","b":"QY-847","c":"场内预制箱涵盖板混凝土","d":"模板安拆、混凝土浇筑、振捣及养护、堆放成品。","e":"10m³","f":"HT-0(10,200);","g":2575.16,"h":0.068,"i":1820.87,"j":426.67,"k":327.62,"l":""},{"a":"QY_2024","b":"QY-848","c":"场内预制箱涵盖板钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4424.61,"h":1.045,"i":511.4,"j":3669.56,"k":223.65,"l":""}]
- 2025-03-10 19:57:13,350 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_06.png
- 2025-03-10 19:57:13,350 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_07.png
- 2025-03-10 19:57:13,350 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_07.png
- 2025-03-10 19:57:43,602 - INFO - 开始保存图片内到数据库:[{"a":"QY-849","b":"QY_2024","c":"盖板安砌M10钢筋混凝土盖板","d":"砂浆制作,安砌盖板,处理预留吊环,养护及清理。","e":"10m3","f":"HT-915(0.270);","g":514.64,"h":0.522,"i":195.17,"j":49.12,"k":270.35,"l":""},{"a":"QY-850","b":"QY_2024","c":"盖板安砌M10毛方石盖板","d":"模板安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-915(2.220);","g":2611.24,"h":28.863,"i":1237.17,"j":1374.07,"k":0,"l":""},{"a":"QY-851","b":"QY_2024","c":"就地浇筑钢筋混凝土矩形涵混凝土孔径1m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":5853.06,"h":0.239,"i":4294.65,"j":1469.4,"k":89.01,"l":""},{"a":"QY-852","b":"QY_2024","c":"就地浇筑钢筋混凝土矩形涵混凝土孔径1.25~1.5m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":5350.44,"h":0.218,"i":3923.64,"j":1343.71,"k":83.09,"l":""},{"a":"QY-853","b":"QY_2024","c":"就地浇筑钢筋混凝土矩形涵混凝土孔径2~3m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":4105.05,"h":0.159,"i":3068.97,"j":979.55,"k":56.53,"l":""}]
- 2025-03-10 19:57:43,679 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_07.png
- 2025-03-10 19:57:43,679 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_08.png
- 2025-03-10 19:57:43,679 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_08.png
- 2025-03-10 19:58:08,655 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-854","c":"就地浇筑钢筋混凝土矩形涵 钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4673.72,"h":1.031,"i":814.32,"j":3714.15,"k":145.25,"l":""},{"a":"QY_2024","b":"QY-855","c":"场内预制混凝土涵身 混凝土 孔径 1m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m³","f":"HT-0(10.200);","g":4535.38,"h":0.087,"i":3928.54,"j":606.84,"k":0,"l":""},{"a":"QY_2024","b":"QY-856","c":"场内预制混凝土涵身 混凝土 孔径 1.25~1.5m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m³","f":"HT-0(10.200);","g":4213.83,"h":0.079,"i":3658.41,"j":555.42,"k":0,"l":""},{"a":"QY_2024","b":"QY-857","c":"场内预制混凝土涵身 混凝土 孔径 2~3m","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m³","f":"HT-0(10.200);","g":3323.77,"h":0.058,"i":2920.17,"j":403.6,"k":0,"l":""},{"a":"QY_2024","b":"QY-858","c":"场内预制混凝土涵身 钢筋","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4482.47,"h":1.04,"i":593.09,"j":3680.79,"k":208.59,"l":""}]
- 2025-03-10 19:58:08,714 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_08.png
- 2025-03-10 19:58:08,714 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_09.png
- 2025-03-10 19:58:08,715 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_09.png
- 2025-03-10 19:58:48,696 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-859","c":"场内预制混凝土成品块 混凝土翼墙","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":3650.55,"h":0.062,"i":3216.79,"j":433.76,"k":0,"l":""},{"a":"QY_2024","b":"QY-860","c":"场内预制混凝土成品块 混凝土 帽石","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":3612.23,"h":0.069,"i":3128.24,"j":483.99,"k":0,"l":""},{"a":"QY_2024","b":"QY-861","c":"场内预制混凝土成品块 混凝土基础及泄床","d":"模板及支架安拆,混凝土浇筑、振捣及养护,堆放成品。","e":"10m3","f":"HT-0(10.200);","g":2338.07,"h":0.07,"i":1998.67,"j":335.65,"k":3.75,"l":""},{"a":"QY_2024","b":"QY-862","c":"场内预制混凝土成品块 钢筋 翼墙","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4318.39,"h":1.038,"i":612,"j":3659.45,"k":46.94,"l":""},{"a":"QY_2024","b":"QY-863","c":"场内预制混凝土成品块 钢筋 帽石","d":"制作、绑扎、安放、定位、校正。","e":"t","f":"","g":4694.29,"h":1.03,"i":969.28,"j":3678.07,"k":46.94,"l":""}]
- 2025-03-10 19:58:48,762 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_09.png
- 2025-03-10 19:58:48,762 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_10.png
- 2025-03-10 19:58:48,762 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_10.png
- 2025-03-10 19:59:39,963 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-864","c":"通身M10水泥砂浆","d":"洗刷成品块,铺设、校正。砂浆制作,安砌成品块并勾缝,养护,处理吊环孔。","e":"10m3","f":"HT-915(0.440);","g":505.87,"h":0.85,"i":430.98,"j":74.89,"k":0,"l":""},{"a":"QY_2024","b":"QY-865","c":"仰石M10水泥砂浆","d":"洗刷成品块,铺设、校正。砂浆制作,安砌成品块并勾缝,养护,处理吊环孔。","e":"10m3","f":"HT-915(1.110);","g":1069.81,"h":2.147,"i":341.73,"j":188.49,"k":539.59,"l":""},{"a":"QY_2024","b":"QY-866","c":"翼墙M10水泥砂浆","d":"洗刷成品块,铺设、校正。砂浆制作,安砌成品块并勾缝,养护,处理吊环孔。","e":"10m3","f":"HT-915(0.520);","g":451.2,"h":1.005,"i":192.23,"j":88.46,"k":170.51,"l":""},{"a":"QY_2024","b":"QY-867","c":"基础及泄床M10水泥砂浆","d":"洗刷成品块,铺设、校正。砂浆制作,安砌成品块并勾缝,养护,处理吊环孔。","e":"10m3","f":"HT-915(0.670);","g":362.42,"h":1.295,"i":142.63,"j":113.88,"k":105.91,"l":""},{"a":"QY_2024","b":"QY-868","c":"就地浇筑混凝土拱圈","d":"模板安装,混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":2509.9,"h":0.103,"i":1854.36,"j":632.77,"k":22.77,"l":""}]
- 2025-03-10 19:59:40,065 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_10.png
- 2025-03-10 19:59:40,065 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_11.png
- 2025-03-10 19:59:40,065 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_11.png
- 2025-03-10 20:00:16,266 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-869","c":"拱圈砌筑M10粗料石","d":"选料、清洗砂浆制作、拱架制安拆、整修,安砌拱圈,填塞预留孔。","e":"10m3","f":"HT-915(2.200);","g":2168.7,"h":27.944,"i":1215.17,"j":931.73,"k":21.8,"l":""},{"a":"QY_2024","b":"QY-870","c":"拱圈砌筑M10粗料拱石","d":"选料、清洗砂浆制作、拱架制安拆、整修,安砌拱圈,填塞预留孔。","e":"10m3","f":"HT-915(2.200);","g":2871.4,"h":27.944,"i":1215.17,"j":1634.43,"k":21.8,"l":""},{"a":"QY_2024","b":"QY-871","c":"钢筋混凝土倒虹吸管身及管套(单孔)孔径(m)0.5","d":"钢筋混凝土圆管管节制安、钢筋混凝土套管,包括模板安拆、钢筋安装,混凝土拌制、浇筑、振捣及养护。","e":"10m","f":"HT-6143(8.910)...","g":7059.78,"h":21.772,"i":3053.98,"j":3821.67,"k":184.13,"l":""},{"a":"QY_2024","b":"QY-872","c":"钢筋混凝土倒虹吸管身及管套(单孔)孔径(m)0.75","d":"钢筋混凝土圆管管节制安、钢筋混凝土套管,包括模板安拆、钢筋安装,混凝土拌制、浇筑、振捣及养护。","e":"10m","f":"HT-6143(13.31...","g":10387.13,"h":32.534,"i":4485.06,"j":5595.77,"k":306.3,"l":""},{"a":"QY_2024","b":"QY-873","c":"钢筋混凝土倒虹吸管身及管套(单孔)孔径(m)1","d":"钢筋混凝土圆管管节制安、钢筋混凝土套管,包括模板安拆、钢筋安装,混凝土拌制、浇筑、振捣及养护。","e":"10m","f":"HT-6143(17.77...","g":14962.65,"h":43.737,"i":6063.54,"j":8453.25,"k":445.86,"l":""}]
- 2025-03-10 20:00:16,332 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_11.png
- 2025-03-10 20:00:16,332 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_12.png
- 2025-03-10 20:00:16,332 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_12.png
- 2025-03-10 20:01:22,351 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-874","c":"钢筋混凝土倒虹吸管身及管套(单孔) 孔径(m) 1.25","d":"钢筋混凝土圆管管节制安、钢筋混凝土套梁,包括模板安拆、钢筋安装,混凝土拌制、浇筑、振捣及养护。","e":"10m","f":"HT-6143(23.48...","g":18860.66,"h":57.469,"i":7820.38,"j":10380.67,"k":659.61,"l":""},{"a":"QY_2024","b":"QY-875","c":"钢筋混凝土倒虹吸管身及管套(单孔) 孔径(m) 1.5","d":"钢筋混凝土圆管管节制安、钢筋混凝土套梁,包括模板安拆、钢筋安装,混凝土拌制、浇筑、振捣及养护。","e":"10m","f":"HT-6143(29.84...","g":23952.38,"h":72.971,"i":9814.57,"j":13245.58,"k":892.23,"l":""},{"a":"QY_2024","b":"QY-876","c":"竖井及基础","d":"模板制安拆、混凝土浇筑、振捣及养护;铁梯制安,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":2845.94,"h":0.076,"i":2297.52,"j":485.94,"k":62.48,"l":""},{"a":"QY_2024","b":"QY-877","c":"出入口矩形槽","d":"模板制安拆、混凝土浇筑、振捣及养护;铁梯制安,脚手架搭拆。","e":"10m3","f":"HT-0(10.200);","g":1881.72,"h":0.048,"i":1555.22,"j":307.97,"k":18.53,"l":""},{"a":"QY_2024","b":"QY-878","c":"附属设施 孔径(m) 0.5","d":"竖井盖板、闸门板的模板制安拆、钢筋制作及绑扎,混凝土浇筑、振捣、养护及安装;拦污栅的钢筋、角钢制安,泄水管安装。","e":"单孔·座","f":"HT-37(0.120);","g":390.67,"h":0.352,"i":112.51,"j":275.24,"k":2.92,"l":""}]
- 2025-03-10 20:01:22,441 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_12.png
- 2025-03-10 20:01:22,441 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_13.png
- 2025-03-10 20:01:22,441 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_13.png
- 2025-03-10 20:02:02,569 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-879","c":"附属设施 孔径(m) 0.75","d":"竖井盖板、闸门板的模板制安拆。钢筋制作及绑扎,混凝土浇筑、振捣、养护及安装;拦污栅的钢筋、角钢制安,泄水管安装。","e":"单孔·座","f":"HT-37(0.184);","g":553.49,"h":0.532,"i":160.15,"j":389.55,"k":3.79,"l":""},{"a":"QY_2024","b":"QY-880","c":"附属设施 孔径(m) 1.0","d":"竖井盖板、闸门板的模板制安拆。钢筋制作及绑扎,混凝土浇筑、振捣、养护及安装;拦污栅的钢筋、角钢制安,泄水管安装。","e":"单孔·座","f":"HT-37(0.240);","g":757.15,"h":0.701,"i":223.62,"j":528.21,"k":5.32,"l":""},{"a":"QY_2024","b":"QY-881","c":"附属设施 孔径(m) 1.25","d":"竖井盖板、闸门板的模板制安拆。钢筋制作及绑扎,混凝土浇筑、振捣、养护及安装;拦污栅的钢筋、角钢制安,泄水管安装。","e":"单孔·座","f":"HT-37(0.330);","g":1018.13,"h":0.959,"i":307.68,"j":702.94,"k":7.68,"l":""},{"a":"QY_2024","b":"QY-882","c":"附属设施 孔径(m) 1.5","d":"竖井盖板、闸门板的模板制安拆。钢筋制作及绑扎,混凝土浇筑、振捣、养护及安装;拦污栅的钢筋、角钢制安,泄水管安装。","e":"单孔·座","f":"HT-37(0.404);","g":1378.08,"h":1.203,"i":412.76,"j":954.39,"k":10.93,"l":""},{"a":"QY_2024","b":"QY-883","c":"铺设铸铁管节 管径 150","d":"刷管、切管及铸铁管铺设。调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":1182.89,"h":0.357,"i":76.36,"j":1083.64,"k":22.89,"l":""}]
- 2025-03-10 20:02:02,609 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_13.png
- 2025-03-10 20:02:02,609 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_14.png
- 2025-03-10 20:02:02,609 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_14.png
- 2025-03-10 20:02:42,098 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-864","c":"铺设铸铁管节 管径 200","d":"刷管、切管及铸铁管铺设,调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":1557.05,"h":0.473,"i":84.63,"j":1449.53,"k":22.89,"l":""},{"a":"QY_2024","b":"QY-865","c":"铺设铸铁管节 管径 250","d":"刷管、切管及铸铁管铺设,调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":2075.75,"h":0.642,"i":91.49,"j":1947.07,"k":37.19,"l":""},{"a":"QY_2024","b":"QY-866","c":"铺设铸铁管节 管径 300","d":"刷管、切管及铸铁管铺设,调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":2660.7,"h":0.822,"i":116.71,"j":2506.8,"k":37.19,"l":""},{"a":"QY_2024","b":"QY-867","c":"铺设铸铁管节 管径 350","d":"刷管、切管及铸铁管铺设,调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":3338.54,"h":1.033,"i":123.58,"j":3168.71,"k":46.25,"l":""},{"a":"QY_2024","b":"QY-868","c":"铺设铸铁管节 管径 400","d":"刷管、切管及铸铁管铺设,调制接口材料,做接头及养护,水压试验。","e":"10m","f":"","g":4020.76,"h":1.258,"i":157.06,"j":3817.45,"k":46.25,"l":""}]
- 2025-03-10 20:02:42,205 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_14.png
- 2025-03-10 20:02:42,205 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_15.png
- 2025-03-10 20:02:42,205 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_15.png
- 2025-03-10 20:03:34,242 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-889","c":"安装曲管或丁字管","d":"刷接口、卸接头,调制接口材料,做接头及养护。","e":"t","f":"","g":3807.36,"h":0.027,"i":455.5,"j":3351.86,"k":0,"l":""},{"a":"QY_2024","b":"QY-890","c":"场内预制U形渡槽槽身混凝土孔径(m) 0.6~0.8","d":"模板制安拆、混凝土浇筑、振捣及养护,成品堆放。","e":"10m³","f":"HT-0(10.200);","g":12532.6,"h":1.055,"i":8570.81,"j":2708.05,"k":1253.74,"l":""},{"a":"QY_2024","b":"QY-891","c":"场内预制U形渡槽槽身混凝土孔径(m) 1.0~1.8","d":"模板制安拆、混凝土浇筑、振捣及养护,成品堆放。","e":"10m³","f":"HT-0(10.200);","g":8456.93,"h":0.673,"i":5931.7,"j":1727.31,"k":797.92,"l":""},{"a":"QY_2024","b":"QY-892","c":"场内预制U形渡槽槽身混凝土孔径(m) 2.2","d":"模板制安拆、混凝土浇筑、振捣及养护,成品堆放。","e":"10m³","f":"HT-0(10.200);","g":6886.43,"h":0.524,"i":4907.91,"j":1345.16,"k":633.36,"l":""},{"a":"QY_2024","b":"QY-893","c":"渡槽钢筋","d":"钢筋制作、绑扎、安装、定位、校正。","e":"t","f":"","g":4467.26,"h":1.038,"i":725.77,"j":3659.15,"k":82.34,"l":""}]
- 2025-03-10 20:03:34,297 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_15.png
- 2025-03-10 20:03:34,297 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_16.png
- 2025-03-10 20:03:34,297 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_16.png
- 2025-03-10 20:04:04,858 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-894","c":"机械架设渡槽","d":"构件加固及吊装就位,检查校正与整理。","e":"10m3","f":"","g":2385.98,"h":0.05,"i":1193.74,"j":118.95,"k":1073.29,"l":""},{"a":"QY_2024","b":"QY-895","c":"渡槽双侧人行道栏杆无步行板","d":"角钢立柱、栏杆、扶手制安,钢构件除锈、涂油漆,有步行板时,钢筋混凝土步行板制安。","e":"100m","f":"","g":28801.23,"h":5.518,"i":3060.7,"j":23614.29,"k":2126.24,"l":""},{"a":"QY_2024","b":"QY-896","c":"渡槽双侧人行道栏杆有步行板","d":"角钢立柱、栏杆、扶手制安,钢构件除锈、涂油漆,有步行板时,钢筋混凝土步行板制安。","e":"100m","f":"HT-6001(2.660);","g":31358.7,"h":12.454,"i":5485.87,"j":23943.61,"k":1928.89,"l":""},{"a":"QY_2024","b":"QY-897","c":"钢筋混凝土渡槽止水缝孔径(m)0.6","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":99.04,"h":0.015,"i":16.11,"j":82.93,"k":0,"l":""},{"a":"QY_2024","b":"QY-898","c":"钢筋混凝土渡槽止水缝孔径(m)0.8","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":133.68,"h":0.03,"i":21.3,"j":112.38,"k":0,"l":""}]
- 2025-03-10 20:04:04,919 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_16.png
- 2025-03-10 20:04:04,919 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_17.png
- 2025-03-10 20:04:04,920 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_17.png
- 2025-03-10 20:05:08,482 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-899","c":"钢筋混凝土渡槽止水缝 孔径(m)1.0","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":158.57,"h":0.03,"i":24.38,"j":134.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-900","c":"钢筋混凝土渡槽止水缝 孔径(m)1.4","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":180.54,"h":0.043,"i":36.57,"j":143.97,"k":0,"l":""},{"a":"QY_2024","b":"QY-901","c":"钢筋混凝土渡槽止水缝 孔径(m)1.8","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":227.19,"h":0.058,"i":43.43,"j":183.96,"k":0,"l":""},{"a":"QY_2024","b":"QY-902","c":"钢筋混凝土渡槽止水缝 孔径(m)2.2","d":"拌制沥青砂胶,混凝土表面涂环氧树脂、粘贴橡皮带、填注沥青砂胶及塑料油膏。","e":"孔","f":"","g":277.15,"h":0.073,"i":51.14,"j":226.01,"k":0,"l":""},{"a":"QY_2024","b":"QY-903","c":"钢筋混凝土渡槽支座 孔径(m)0.8~1.0","d":"制作及安装铁垫板、螺栓、支座。","e":"t","f":"","g":5484,"h":1.046,"i":938.32,"j":3895.24,"k":650.44,"l":""}]
- 2025-03-10 20:05:08,553 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_17.png
- 2025-03-10 20:05:08,553 - INFO - 开始处理图片: ./temp_files/images/output/img/05/part_18.png
- 2025-03-10 20:05:08,553 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/05/part_18.png
- 2025-03-10 20:05:19,032 - INFO - 开始保存图片内到数据库:[{"a":"QV_2024","b":"QV-904","c":"钢轨混凝土渡槽支座 孔径(m) 1.4~2.2","d":"制作及安装铁垫板、螺栓、支座。","e":"t","f":"","g":6657.67,"h":1.045,"i":938.32,"j":5068.91,"k":650.44,"l":""}]
- 2025-03-10 20:05:19,056 - INFO - 图片处理完成: ./temp_files/images/output/img/05/part_18.png
- 2025-03-10 20:05:19,056 - INFO - 目录处理完成: ./temp_files/images/output/img/05/
- 2025-03-10 20:05:19,056 - INFO - 开始处理目录: ./temp_files/images/output/img/06/
- 2025-03-10 20:05:19,057 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 20:05:19,057 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 20:05:40,347 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-905","c":"热沥青防水层 涂沥青一层","d":"防水层部分清理及洗刷.炼制沥青,浸制沥青麻布,配置石棉沥青.在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":79.15,"h":0,"i":21.78,"j":57.37,"k":0,"l":""},{"a":"QY_2024","b":"QY-906","c":"热沥青防水层 涂沥青增加一层","d":"防水层部分清理及洗刷.炼制沥青,浸制沥青麻布,配置石棉沥青.在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":61.48,"h":0,"i":11.93,"j":49.55,"k":0,"l":""},{"a":"QY_2024","b":"QY-907","c":"热沥青防水层 浸制麻布一层","d":"防水层部分清理及洗刷.炼制沥青,浸制沥青麻布,配置石棉沥青.在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":237.36,"h":0,"i":52.81,"j":184.55,"k":0,"l":""},{"a":"QY_2024","b":"QY-908","c":"热沥青防水层 浸制麻布增加一层","d":"防水层部分清理及洗刷.炼制沥青,浸制沥青麻布,配置石棉沥青.在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":209.97,"h":0,"i":35.36,"j":174.61,"k":0,"l":""},{"a":"QY_2024","b":"QY-909","c":"石棉沥青 一层厚1.5","d":"防水层部分清理及洗刷.炼制沥青,浸制沥青麻布,配置石棉沥青.在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":95.08,"h":0,"i":35.36,"j":59.72,"k":0,"l":""}]
- 2025-03-10 20:05:40,424 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 20:05:40,424 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 20:05:40,424 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 20:06:15,748 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-910","c":"岩棉沥青一布二粉防霉青一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":89.39,"h":0,"i":30.43,"j":58.96,"k":0,"l":""},{"a":"QY_2024","b":"QY-911","c":"甲种防水层 石棉沥青两层沥青麻布一层涂沥青两层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":547.28,"h":0,"i":157.09,"j":390.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-912","c":"再生橡胶沥青防水涂料 涂料两层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":139.23,"h":0.019,"i":29.69,"j":109.54,"k":0,"l":""},{"a":"QY_2024","b":"QY-913","c":"再生橡胶沥青防水涂料 涂料两层薄膜卷材一层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":251.51,"h":0.043,"i":52.81,"j":198.7,"k":0,"l":""},{"a":"QY_2024","b":"QY-914","c":"再生橡胶沥青防水涂料 涂料三层玻璃丝布两层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":295.79,"h":0.028,"i":120.24,"j":175.55,"k":0,"l":""}]
- 2025-03-10 20:06:15,838 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 20:06:15,838 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 20:06:15,838 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 20:07:04,316 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-915","c":"熟丁橡胶沥青防水涂料三层","d":"铺匀底锌剂清理施工表面刷涂沥青水涂料铺贴卷材下纤维布","e":"10m2","f":"","g":206.29,"h":0.014,"i":56.09,"j":150.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-916","c":"氯丁橡胶沥青防水涂料 涂料六层玻璃丝布两层","d":"调匀涂料,清扫圬工表面;涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":455.64,"h":0.023,"i":206.91,"j":248.73,"k":0,"l":""},{"a":"QY_2024","b":"QY-917","c":"TQF-I(甲)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":747.49,"h":0.04,"i":96.97,"j":650.52,"k":0,"l":""},{"a":"QY_2024","b":"QY-918","c":"TQF-II(丙)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":329.25,"h":0.018,"i":84.88,"j":244.37,"k":0,"l":""},{"a":"QY_2024","b":"QY-919","c":"THF-I(甲)","d":"清理基层、分割缝嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":761.83,"h":0.041,"i":118.45,"j":643.36,"k":0,"l":""}]
- 2025-03-10 20:07:04,384 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 20:07:04,384 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 20:07:04,384 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 20:07:29,613 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-920","c":"清埋基层\\'方钢刷防锈、铺毡层处理剂、砌底涂防水卷材、收头导!^n^n^^+^+^+\",\"d":"","e":"10m2","f":"","g":20.65,"h":0.019,"i":78.47,"j":42.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-921","c":"聚脂防水层 底座板下","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘:底胶滚涂,防水层喷涂,整理。","e":"10m2","f":"","g":822.58,"h":0,"i":16.11,"j":780.55,"k":25.92,"l":""},{"a":"QY_2024","b":"QY-922","c":"聚脂防水层 底座板以外","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘:底胶滚涂,防水层喷涂,整理。","e":"10m2","f":"","g":807.91,"h":0.002,"i":19.24,"j":751.17,"k":37.5,"l":""},{"a":"QY_2024","b":"QY-923","c":"氯化聚乙烯卷材及聚氨酯防水涂料","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘:底胶滚涂,防水层喷涂,整理。","e":"10m2","f":"","g":721.25,"h":0.113,"i":105.02,"j":616.23,"k":0,"l":""},{"a":"QY_2024","b":"QY-924","c":"防护层 钢丝网水泥砂浆 厚20","d":"砂浆制作,安装钢丝网,抹砂浆,养护。","e":"10m2","f":"HT-915(0.204);","g":331.71,"h":0.395,"i":52.21,"j":279.5,"k":0,"l":""}]
- 2025-03-10 20:07:29,613 - ERROR - 保存图片内容失败: Expecting ',' delimiter: line 1 column 85 (char 84)
- 2025-03-10 20:07:29,614 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 20:07:29,614 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 20:07:29,614 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 20:07:56,952 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-925","c":"防护层喷射混凝土水泥砂浆厚30","d":"砂浆制作、安装钢丝网、抹砂浆、养护。","e":"10m2","f":"HT-915(U.3Ub);","g":43.07,"h":0.592,"i":41.62,"j":307.45,"k":0,"l":""},{"a":"QY_2024","b":"QY-926","c":"防护层沥青混凝土厚30","d":"熬沥青、砂子石粉加热、制作及铺设、养护。","e":"10m2","f":"","g":427.07,"h":1.209,"i":67.28,"j":359.79,"k":0,"l":""},{"a":"QY_2024","b":"QY-927","c":"防护层沥青砂胶厚10","d":"熬沥青、砂子石粉加热、制作及铺设、养护。","e":"10m2","f":"","g":109.51,"h":0,"i":44.16,"j":65.35,"k":0,"l":""},{"a":"QY_2024","b":"QY-928","c":"防护层黏土厚200","d":"拌合、摊铺、夯实、养护。","e":"10m2","f":"","g":126.6,"h":3.996,"i":99.35,"j":27.25,"k":0,"l":""},{"a":"QY_2024","b":"QY-929","c":"玻璃纤维混凝土","d":"基面清理、混凝土浇筑、抹平、养护。","e":"10m3","f":"HT-0(10,200);","g":4063.95,"h":0,"i":2615.72,"j":264.37,"k":1183.86,"l":""}]
- 2025-03-10 20:07:57,053 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 20:07:57,053 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 20:07:57,053 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 20:08:46,224 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-930","c":"热作式伸缩缝、沉降缝沥青麻筋厚20","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"HT-915(10.200);","g":1844.86,"h":0,"i":155.45,"j":1689.41,"k":0,"l":""},{"a":"QY_2024","b":"QY-931","c":"垫层混凝土","d":"混凝土浇筑、振捣和养护。","e":"10m3","f":"HT-0(10.200);","g":621.69,"h":0,"i":601.05,"j":20.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-932","c":"垫层水泥砂浆M10","d":"配料、拌制、抹平和养护。","e":"10m3","f":"HT-915(10.200);","g":2455.02,"h":19.725,"i":714.27,"j":1740.75,"k":0,"l":""},{"a":"QY_2024","b":"QY-933","c":"热作式伸缩缝、沉降缝沥青麻筋厚30","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":2780.27,"h":0,"i":182.75,"j":2597.52,"k":0,"l":""}]
- 2025-03-10 20:08:46,275 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 20:08:46,275 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 20:08:46,275 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 20:09:12,450 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-935","c":"热作式伸缩缝、沉降缝沥青麻筋厚10","d":"陈制沥青,浸制沥青青麻筋油毡剪裁,涂沥青及安装,嵌塞伸缩缝制作、抹铺砂浆。","e":"10m2","f":"","g":426.15,"h":0,"i":388.76,"j":4236.39,"k":0,"l":""},{"a":"QY_2024","b":"QY-936","c":"热作式伸缩缝、沉降缝一层油毡两层沥青","d":"炼制沥青,浸制沥青青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":206.4,"h":0,"i":92.94,"j":113.46,"k":0,"l":""},{"a":"QY_2024","b":"QY-937","c":"热作式伸缩缝、沉降缝两层油毛毡三层沥青","d":"炼制沥青,浸制沥青青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":320.37,"h":0,"i":136.95,"j":183.42,"k":0,"l":""},{"a":"QY_2024","b":"QY-938","c":"热作式伸缩缝、沉降缝三层油毛毡四层沥青","d":"炼制沥青,浸制沥青青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":438.77,"h":0,"i":185.13,"j":253.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-939","c":"热作式伸缩缝、沉降缝水泥砂浆M10","d":"炼制沥青,浸制沥青青筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"HT-915(3.060);","g":637.02,"h":5.919,"i":117.11,"j":519.91,"k":0,"l":""}]
- 2025-03-10 20:09:12,497 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 20:09:12,498 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 20:09:12,498 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 20:09:37,930 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-940","c":"伸缩缝、沉降缝沥青木板","d":"陈制沥青防腐沥青防潮剂油毡沥青涂沥青及贴纸不撒布制作活动筋及安装嵌基伸缩缝制作、抹铺砂浆。","e":"10m2","f":"","g":84.37,"h":0.576,"i":76.98,"j":7.39,"k":0,"l":""},{"a":"QY_2024","b":"QY-941","c":"伸缩缝、沉降缝黏土","d":"炼制沥青,浸制沥青麻筋、油毡剪裁、涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":1779.98,"h":0.037,"i":155.45,"j":1624.53,"k":0,"l":""},{"a":"QY_2024","b":"QY-942","c":"冷作式伸缩缝、沉降缝JS-18涂料麻筋厚20","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":2470.5,"h":0.038,"i":247.64,"j":2222.86,"k":0,"l":""},{"a":"QY_2024","b":"QY-943","c":"冷作式伸缩缝、沉降缝JS-18涂料麻筋厚30","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":3795.29,"h":0.041,"i":388.76,"j":3406.53,"k":0,"l":""},{"a":"QY_2024","b":"QY-944","c":"冷作式伸缩缝、沉降缝JS-18涂料麻筋厚50","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":0,"h":0,"i":0,"j":0,"k":0,"l":""}]
- 2025-03-10 20:09:37,988 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 20:09:37,988 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_09.png
- 2025-03-10 20:09:37,989 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_09.png
- 2025-03-10 20:12:39,435 - ERROR - 处理图片失败 ./temp_files/images/output/img/06/part_09.png: 调用 AI 错误: Error code: 400 - {'error': {'code': 'RequestTimeOut', 'param': None, 'message': 'Request timed out, please try again later.', 'type': 'RequestTimeOut'}, 'id': 'chatcmpl-271c9bce-b843-978b-8198-f86d7dafad21', 'request_id': '271c9bce-b843-978b-8198-f86d7dafad21'}
- 2025-03-10 20:12:39,435 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 20:12:39,435 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 20:13:16,037 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-980","c":"浆砌片石混凝土护坡","d":"砂浆制作\\选修洗石\\抹浆安砌\\填塞孔隙\\整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2372.13,"h":27.442,"i":1158.08,"j":1134.97,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-951","c":"浆砌片石河床护底","d":"砂浆制作、选修洗石、抹浆安砌、填塞孔隙、整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2207.24,"h":27.442,"i":1052.17,"j":1135.93,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-952","c":"浆砌片石河床护坡及导流堤","d":"砂浆制作、选修洗石、抹浆安砌、填塞孔隙、整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2256.63,"h":27.442,"i":1103.34,"j":1134.15,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-953","c":"M10砂浆预制块锥体护坡","d":"清理基面,脚手架搭拆,砂浆拌制、安砌、养护。","e":"10m³","f":"CL-01(9.100),HT-915(1.300);","g":1156.62,"h":2.617,"i":697.27,"j":451.86,"k":7.49,"l":"CL-01 混凝土预制件(m3)"},{"a":"QY_2024","b":"QY-954","c":"钢丝笼装片石","d":"片石选取、填装、码砌。","e":"10m³","f":"","g":1765.63,"h":18.511,"i":735.61,"j":1030.02,"k":0,"l":""}]
- 2025-03-10 20:13:16,112 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 20:13:16,112 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 20:13:16,113 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 20:13:47,737 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-955","c":"桥头检查台阶涂砌片石面iu","d":"砂浆制作\\选择沉降\\抹灰安砌\\基垫至原位整理及养护等","e":"10m3","f":"HL-915(3.300);","g":2258.77,"h":21.442,"i":1101.25,"j":1138.38,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-956","c":"桥头检查台阶M10砂浆砌筑预制块","d":"清理基面、砂浆拌制、砌筑、养护。","e":"10m3","f":"CL-01(9.100);HT-915(1.300);","g":936.23,"h":2.514,"i":697.27,"j":231.47,"k":7.49,"l":"CL-01 混凝土预制件(m3)"},{"a":"QY_2024","b":"QY-957","c":"水泥砂浆勾缝M10","d":"洗刷表面、搭拆脚手架、砂浆制作、勾缝、剔缝、清理及养护。","e":"100m2","f":"HT-915(0.870);","g":1141.36,"h":1.682,"i":984.89,"j":151.98,"k":4.49,"l":""},{"a":"QY_2024","b":"QY-958","c":"水泥砂浆抹面M10厚度2cm","d":"洗刷表面、搭拆脚手架、砂浆制作、勾缝、剔缝、清理及养护。","e":"100m2","f":"HT-915(2.600);","g":1390.87,"h":5.028,"i":922.53,"j":468.34,"k":0,"l":""},{"a":"QY_2024","b":"QY-959","c":"水泥砂浆抹面每增加2cm","d":"清扫、冲刷、砂浆拌制、抹平、养护。","e":"100m2","f":"HT-915(2.600);","g":1152.75,"h":5.028,"i":698.01,"j":440.93,"k":13.81,"l":""}]
- 2025-03-10 20:13:47,822 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 20:13:47,822 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 20:13:47,822 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 20:14:15,538 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-960","c":"禁锈膏右面石加工","d":"面右表面给面加工:上卜面及侧面局部修整。","e":"m3/m2","f":"","g":3450.65,"h":0,"i":3409.96,"j":40.59,"k":0,"l":""},{"a":"QY_2024","b":"QY-961","c":"重型栓接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":4917.86,"h":1.05,"i":3849.94,"j":438.08,"k":0,"l":""},{"a":"QY_2024","b":"QY-962","c":"轻型栓接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":5567.06,"h":1.05,"i":1098.71,"j":3952.9,"k":515.45,"l":""},{"a":"QY_2024","b":"QY-963","c":"一般焊接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":5594.41,"h":1.05,"i":954.45,"j":3983.95,"k":656.01,"l":""},{"a":"QY_2024","b":"QY-964","c":"钢结构安拆 陆上","d":"铺拆临时排手架,杆件安装、拆除。","e":"t","f":"","g":1958.67,"h":0.273,"i":802.89,"j":1059.43,"k":96.35,"l":""}]
- 2025-03-10 20:14:15,587 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 20:14:15,587 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 20:14:15,587 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 20:15:38,611 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-965","c":"钢筋网安拆水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":3087.12,"h":0.213,"i":1315.92,"j":1063.68,"k":1406.12,"l":""},{"a":"QY_2024","b":"QY-966","c":"万能杆件安拆陆上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":623.54,"h":0.026,"i":462.46,"j":153.76,"k":7.32,"l":""},{"a":"QY_2024","b":"QY-967","c":"万能杆件安拆水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":2075.68,"h":0.026,"i":605.97,"j":158.01,"k":1311.7,"l":""},{"a":"QY_2024","b":"QY-968","c":"贝雷梁安拆陆上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":499.52,"h":0.02,"i":422.63,"j":71.46,"k":5.43,"l":""},{"a":"QY_2024","b":"QY-969","c":"贝雷梁安拆水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":1941.02,"h":0.02,"i":553.61,"j":75.71,"k":1311.7,"l":""}]
- 2025-03-10 20:15:38,686 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 20:15:38,686 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 20:15:38,686 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 20:16:03,061 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-970","c":"热室式支架层析","d":"鹤官柱及分配梁架导结构安拆。","e":"100m3全间","f":"","g":3684.65,"h":0.429,"i":1609.95,"j":1670.13,"k":204.57,"l":""},{"a":"QY_2024","b":"QY-971","c":"辅助钢结构支架","d":"钢管柱及分配梁等钢结构安拆。","e":"10t","f":"","g":23012.26,"h":2.847,"i":10021.91,"j":10898.3,"k":2092.05,"l":""},{"a":"QY_2024","b":"QY-972","c":"堆载预压","d":"工作准备,袋装土堆载预压、卸载。","e":"100t","f":"","g":2569.9,"h":0,"i":279.26,"j":1337,"k":953.64,"l":""},{"a":"QY_2024","b":"QY-973","c":"钢塔架安拆","d":"搭架新制杆件制作安拆。","e":"t","f":"","g":2849.56,"h":0.194,"i":1427.95,"j":889.36,"k":532.25,"l":""},{"a":"QY_2024","b":"QY-974","c":"地面混凝土","d":"挖基、混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":821.09,"h":0,"i":685.18,"j":121.19,"k":14.72,"l":""}]
- 2025-03-10 20:16:03,123 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 20:16:03,123 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 20:16:03,123 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 20:16:20,335 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-975","c":"拖抽肉结构安装","d":"鹅结饲前肩座","e":"t","f":"","g":4087.61,"h":0.316,"i":1751.67,"j":1628.61,"k":707.23,"l":""},{"a":"QY_2024","b":"QY-976","c":"索鞍安拆","d":"安拆。","e":"t","f":"","g":4930.3,"h":0.35,"i":1100.2,"j":1349.28,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-977","c":"主缆安拆","d":"安拆。","e":"t","f":"HT-0(10.200):","g":6790.17,"h":0,"i":1136.3,"j":3173.05,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-978","c":"牵引索起重索安拆","d":"结构安拆。","e":"t","f":"","g":6731.7,"h":0,"i":1077.83,"j":3173.05,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-979","c":"缆风索安拆","d":"结构安拆。","e":"t","f":"","g":6717.23,"h":0,"i":1063.36,"j":3173.05,"k":2480.82,"l":""}]
- 2025-03-10 20:16:20,392 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 20:16:20,392 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 20:16:20,392 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 20:16:45,241 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-980","c":"结构安装φ16mm~φ32mm钢筋线夹安拆","d":"","e":"t","f":"by67.35","g":1107.51,"h":0,"i":3173.05,"j":2400.02,"k":"","l":""},{"a":"QY_2024","b":"QY-981","c":"水深≤10m 桩桥(宽4m)","d":"钢管桩制作、插打、桩间连接系、分配梁、桥面板及栏杆等钢结构制安拆。主桁及连接系军用梁构架安拆。","e":"延长米","f":"8611.09","g":2835.32,"h":1.114,"i":4770.89,"j":1004.88,"k":"","l":""},{"a":"QY_2024","b":"QY-982","c":"水深≤10m 宽度每增加1m","d":"钢管桩制作、插打、桩间连接系、分配梁、桥面板及栏杆等钢结构制安拆。主桁及连接系军用梁构架安拆。","e":"延长米","f":"1649.33","g":709.35,"h":0.157,"i":756.36,"j":183.62,"k":"","l":""},{"a":"QY_2024","b":"QY-983","c":"航标灯支架制安","d":"钢构件调整整平,划线、下料、钻孔、电焊、组拼、杆件安装、油漆。","e":"一个墩","f":"5034.37","g":1675.44,"h":0.712,"i":3038.95,"j":319.98,"k":"","l":""},{"a":"QY_2024","b":"QY-984","c":"钢结构限高防撞架","d":"钢结构制作、安装、油漆。","e":"t","f":"8360.08","g":5137.54,"h":0.968,"i":2385.98,"j":836.56,"k":"","l":""}]
- 2025-03-10 20:16:45,264 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 20:16:45,287 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 20:16:45,310 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 20:16:45,313 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 20:16:45,325 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '' for column 'machine_cost' at row 1")
- 2025-03-10 20:16:45,326 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 20:16:45,326 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 20:16:45,326 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 20:17:16,526 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-985","c":"拆除五菱牌厢式货车","d":"踏直屋架分线线下料电焊组拼安装油漆。","e":"30m","f":"","g":1003.64,"h":0.29,"i":395.78,"j":1003.8,"k":104.56,"l":""},{"a":"QY_2024","b":"QY-986","c":"陆上 人力拆除混凝土","d":"气镐开凿、清理等。","e":"10m³","f":"","g":1405.7,"h":0,"i":1215.52,"j":35.45,"k":154.73,"l":""},{"a":"QY_2024","b":"QY-987","c":"陆上 人力拆除钢筋混凝土","d":"气镐开凿、清理等。","e":"10m³","f":"","g":1720.63,"h":0,"i":1458.53,"j":46.08,"k":216.02,"l":""},{"a":"QY_2024","b":"QY-988","c":"陆上 爆破拆除混凝土","d":"人力开眼、爆破、清理。","e":"10m³","f":"","g":1910.57,"h":0.006,"i":1464.8,"j":445.77,"k":0,"l":""},{"a":"QY_2024","b":"QY-989","c":"陆上 爆破拆除钢筋混凝土","d":"人力开眼、爆破、清理。","e":"10m³","f":"","g":2314.75,"h":0.007,"i":1714.23,"j":585.62,"k":14.9,"l":""}]
- 2025-03-10 20:17:16,596 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 20:17:16,596 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 20:17:16,596 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 20:17:45,677 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-990","c":"陆上机械拆除混凝土","d":"机械就位、凿除、清理、堆放。","e":"10m³","f":"","g":830.17,"h":0,"i":124.71,"j":"--","k":0,"l":""},{"a":"QY_2024","b":"QY-991","c":"陆上机械拆除钢筋混凝土","d":"机械就位、凿除、清理、堆放。","e":"10m³","f":"","g":1220.98,"h":0,"i":373.99,"j":"--","k":0,"l":""},{"a":"QY_2024","b":"QY-992","c":"水上人力拆除混凝土","d":"气镐开凿、清理等。","e":"10m³","f":"","g":1685.17,"h":0,"i":1458.53,"j":40.77,"k":185.87,"l":""},{"a":"QY_2024","b":"QY-993","c":"水上人力拆除钢筋混凝土","d":"气镐开凿、清理等。","e":"10m³","f":"","g":2020.52,"h":0,"i":1707.81,"j":53.03,"k":259.68,"l":""},{"a":"QY_2024","b":"QY-994","c":"水上爆破拆除混凝土","d":"人力开眼、爆破、清理。","e":"10m³","f":"","g":2190.33,"h":0.008,"i":1707.81,"j":482.52,"k":0,"l":""}]
- 2025-03-10 20:17:45,689 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '--' for column 'material_cost' at row 1")
- 2025-03-10 20:17:45,692 - ERROR - 执行非查询时出错:(1366, "Incorrect decimal value: '--' for column 'material_cost' at row 1")
- 2025-03-10 20:17:45,727 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 20:17:45,727 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_19.png
- 2025-03-10 20:17:45,727 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_19.png
- 2025-03-10 20:20:47,180 - ERROR - 处理图片失败 ./temp_files/images/output/img/06/part_19.png: 调用 AI 错误: Error code: 400 - {'error': {'code': 'RequestTimeOut', 'param': None, 'message': 'Request timed out, please try again later.', 'type': 'RequestTimeOut'}, 'id': 'chatcmpl-902c7f58-19db-97f4-960b-3adef611fc27', 'request_id': '902c7f58-19db-97f4-960b-3adef611fc27'}
- 2025-03-10 20:20:47,180 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 20:20:47,181 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 20:21:19,288 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1000u","c":"欠万麻陈永勋片石厂商上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":438.65,"h":0,"i":436.65,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1001","c":"人力拆除浆砌片石水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":547.9,"h":0,"i":545.7,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1002","c":"人力拆除浆砌石料陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":757.95,"h":0,"i":755.75,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1003","c":"人力拆除浆砌块石水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":946.21,"h":0,"i":944.01,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1004","c":"人力拆除浆砌石陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":229.86,"h":0,"i":228.39,"j":1.47,"k":0,"l":""}]
- 2025-03-10 20:21:19,322 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 20:21:19,322 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 20:21:19,322 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 20:22:04,734 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1005","c":"欠万拆除石层水下","d":"凿眼、装药、爆破、清理、堆放砌块。","e":"10m³","f":"","g":287.5,"h":0,"i":286.73,"j":7.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-1006","c":"爆破拆除浆砌石陆上","d":"人力凿眼、装药、爆破、清理、堆放搭拆跳板。","e":"10m³","f":"","g":640.28,"h":0.004,"i":381.45,"j":258.83,"k":0,"l":""},{"a":"QY_2024","b":"QY-1007","c":"爆破拆除浆砌石水上","d":"人力凿眼、装药、爆破、清理、堆放搭拆跳板。","e":"10m³","f":"","g":757.42,"h":0.005,"i":476.78,"j":280.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-1008","c":"机械拆除浆砌砌体","d":"机械就位、凿除、清理、堆放。","e":"10m³","f":"","g":314.16,"h":0,"i":62.36,"j":0,"k":251.8,"l":""},{"a":"QY_2024","b":"QY-1009","c":"架桥机拆除上承钢梁跨度(m)8~16","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":2834.45,"h":0.028,"i":790.36,"j":52.81,"k":1991.28,"l":""}]
- 2025-03-10 20:22:04,806 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 20:22:04,806 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 20:22:04,806 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 20:22:42,887 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-107U","c":"柴桥杭甬疏港线承板梁跨度(m)20~24","d":"拆除支座锚栓,细梁吊起吊运至桥头。落梁横移路基一侧。","e":"孔","f":"","g":3925.23,"h":0.08,"i":1212.98,"j":109.09,"k":2303.16,"l":""},{"a":"QY_2024","b":"QY-1011","c":"架桥机拆除上承板梁跨度(m)28~32","d":"拆除支座锚栓,细梁吊起吊运至桥头。落梁横移路基一侧。","e":"孔","f":"","g":5604.04,"h":0.094,"i":1768.98,"j":176.39,"k":3658.67,"l":""},{"a":"QY_2024","b":"QY-1012","c":"架桥机拆除下承板梁跨度(m)16","d":"拆除支座锚栓,细梁吊起吊运至桥头。落梁横移路基一侧。","e":"孔","f":"","g":5002.41,"h":0.047,"i":1020.24,"j":88.29,"k":3893.88,"l":""},{"a":"QY_2024","b":"QY-1013","c":"架桥机拆除下承板梁跨度(m)20","d":"拆除支座锚栓,细梁吊起吊运至桥头。落梁横移路基一侧。","e":"孔","f":"","g":6024.25,"h":0.062,"i":1529.84,"j":117.66,"k":4376.75,"l":""},{"a":"QY_2024","b":"QY-1014","c":"架桥机拆除下承板梁跨度(m)24","d":"拆除支座锚栓,细梁吊起吊运至桥头。落梁横移路基一侧。","e":"孔","f":"","g":6390.55,"h":0.078,"i":1821.64,"j":147.03,"k":4421.88,"l":""}]
- 2025-03-10 20:22:42,974 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 20:22:42,974 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 20:22:42,974 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 20:23:03,266 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1015","c":"拆除机拆除下承板梁跨度(m) 28","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":28.02,"h":0.109,"i":39.44,"j":65.76,"k":408.82,"l":""},{"a":"QY_2024","b":"QY-1016","c":"架桥机拆除下承板梁跨度(m) 32","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":7354.93,"h":0.133,"i":2258.29,"j":249.81,"k":4846.83,"l":""}]
- 2025-03-10 20:23:03,302 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 20:23:03,302 - INFO - 目录处理完成: ./temp_files/images/output/img/06/
- 2025-03-10 20:23:03,302 - ERROR - ----【处理图片失败】-----: ['./temp_files/images/output/img/06/part_09.png', './temp_files/images/output/img/06/part_19.png']
- 2025-03-10 20:23:03,302 - INFO - 开始导出数据库数据
- 2025-03-10 20:23:03,305 - ERROR - 执行查询时出错:(1064, "You have an error in your SQL syntax; check the manual that corresponds to your MySQL server version for the right syntax to use near 'grouped_data AS (\n SELECT DISTINCT book_number\n FR' at line 1")
- 2025-03-10 20:23:03,306 - INFO - 成功导出数据库数据
- 进程已结束,退出代码为 0
- D:\01Work\1012_DataMiddleware\SourceCode\DataMiddleware\.venv\Scripts\python.exe D:\01Work\1012_DataMiddleware\SourceCode\DataMiddleware\tools\img_spilt\run.py
- 2025-03-10 21:11:41,957 - INFO - 开始处理目录: ./temp_files/images/output/img/06/
- 2025-03-10 21:11:41,957 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 21:11:41,958 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 21:12:16,764 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-905","c":"热沥青防水层 涂沥青一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":79.15,"h":0,"i":21.78,"j":57.37,"k":0,"l":""},{"a":"QY_2024","b":"QY-906","c":"热沥青防水层 涂沥青增加一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":61.48,"h":0,"i":11.93,"j":49.55,"k":0,"l":""},{"a":"QY_2024","b":"QY-907","c":"热沥青防水层 浸制麻布一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":237.36,"h":0,"i":52.81,"j":184.55,"k":0,"l":""},{"a":"QY_2024","b":"QY-908","c":"热沥青防水层 浸制麻布增加一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":209.97,"h":0,"i":35.36,"j":174.61,"k":0,"l":""},{"a":"QY_2024","b":"QY-909","c":"石棉沥青 一层厚1.5","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":95.08,"h":0,"i":35.36,"j":59.72,"k":0,"l":""}]
- 2025-03-10 21:12:16,843 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_01.png
- 2025-03-10 21:12:16,843 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 21:12:16,843 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 21:13:08,992 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-910","c":"石棉沥青 石棉沥青每增加一层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":89.39,"h":0,"i":30.43,"j":58.96,"k":0,"l":""},{"a":"QY_2024","b":"QY-911","c":"甲种防水层 石棉沥青两层沥清麻布一层涂沥青两层","d":"防水层部分清理及洗刷,炼制沥青,浸制沥青麻布,配置石棉沥青,在垫层上铺设或涂抹防水层。","e":"10m2","f":"","g":547.28,"h":0,"i":157.09,"j":390.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-912","c":"再生橡胶沥青防水涂料 涂料两层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":139.23,"h":0.019,"i":29.69,"j":109.54,"k":0,"l":""},{"a":"QY_2024","b":"QY-913","c":"再生橡胶沥青防水涂料 涂料两层薄膜卷材一层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":251.51,"h":0.043,"i":52.81,"j":198.7,"k":0,"l":""},{"a":"QY_2024","b":"QY-914","c":"再生橡胶沥青防水涂料 涂料三层玻璃丝布两层","d":"调匀涂料,清扫圬工表面,涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":295.79,"h":0.026,"i":120.24,"j":175.55,"k":0,"l":""}]
- 2025-03-10 21:13:09,033 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_02.png
- 2025-03-10 21:13:09,033 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 21:13:09,033 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 21:13:30,975 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-915","c":"氯丁橡胶沥青防水涂料 三层","d":"调匀涂料,清扫圬工表面.涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":206.29,"h":0.014,"i":56.09,"j":150.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-916","c":"氯丁橡胶沥青防水涂料 涂料六层玻璃丝布两层","d":"调匀涂料,清扫圬工表面.涂刷防水涂料,铺贴卷材、纤维布。","e":"10m2","f":"","g":455.64,"h":0.023,"i":206.91,"j":248.73,"k":0,"l":""},{"a":"QY_2024","b":"QY-917","c":"TGF-I(甲)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":747.49,"h":0.04,"i":96.97,"j":650.52,"k":0,"l":""},{"a":"QY_2024","b":"QY-918","c":"TGF-II(丙)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":329.25,"h":0.018,"i":84.88,"j":244.37,"k":0,"l":""},{"a":"QY_2024","b":"QY-919","c":"THF-I(甲)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":761.83,"h":0.041,"i":118.45,"j":643.38,"k":0,"l":""}]
- 2025-03-10 21:13:31,055 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_03.png
- 2025-03-10 21:13:31,056 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 21:13:31,056 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 21:13:57,234 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-920","c":"THF-II(丙)","d":"清理基层、分割逢嵌逢、刷基层处理剂、刷胶、铺贴防水卷材、收头等。","e":"10m2","f":"","g":320.66,"h":0.019,"i":78.47,"j":242.19,"k":0,"l":""},{"a":"QY_2024","b":"QY-921","c":"聚脲防水层底座板下","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘;底胶滚涂,防水层喷涂;整理。","e":"10m2","f":"","g":822.58,"h":0,"i":16.11,"j":780.55,"k":25.92,"l":""},{"a":"QY_2024","b":"QY-922","c":"聚脲防水层底座板以外","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘;底胶滚涂,防水层喷涂;整理。","e":"10m2","f":"","g":807.91,"h":0.002,"i":19.24,"j":751.17,"k":37.5,"l":""},{"a":"QY_2024","b":"QY-923","c":"氯化聚乙烯卷材及聚氨酯防水涂料","d":"准备工作:拉毛,钢刷打磨,喷灯去除纤维;清扫,吹尘;底胶滚涂,防水层喷涂;整理。","e":"10m2","f":"","g":721.25,"h":0.113,"i":105.02,"j":616.23,"k":0,"l":""},{"a":"QY_2024","b":"QY-924","c":"防护层钢丝网水泥砂浆厚20","d":"砂浆制作,安装钢丝网,抹砂浆,养护。","e":"10m2","f":"HT-915(0.204);","g":331.71,"h":0.395,"i":52.21,"j":279.5,"k":0,"l":""}]
- 2025-03-10 21:13:57,311 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_04.png
- 2025-03-10 21:13:57,311 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 21:13:57,311 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 21:14:22,863 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-925","c":"防护层钢丝网水泥砂浆厚30","d":"砂浆制作、安装钢筋网、抹砂浆、养护。","e":"10m²","f":"HT-915(0.306);","g":343.07,"h":0.592,"i":41.62,"j":301.45,"k":0,"l":""},{"a":"QY_2024","b":"QY-926","c":"防护层沥青混凝土厚30","d":"熬沥清、砂子石粉加热、制作及铺设、养护。","e":"10m²","f":"","g":427.07,"h":1.209,"i":67.28,"j":359.79,"k":0,"l":""},{"a":"QY_2024","b":"QY-927","c":"防护层沥青砂胶厚10","d":"熬沥清、砂子石粉加热、制作及铺设、养护。","e":"10m²","f":"","g":109.51,"h":0,"i":44.16,"j":65.35,"k":0,"l":""},{"a":"QY_2024","b":"QY-928","c":"防护层黏土厚200","d":"拌合、摊铺、夯实、养护。","e":"10m²","f":"","g":126.6,"h":3.996,"i":99.35,"j":27.25,"k":0,"l":""},{"a":"QY_2024","b":"QY-929","c":"玻璃纤维混凝土","d":"基面清理、混凝土浇筑、抹平、养护。","e":"10m³","f":"HT-0(10.200);","g":4063.95,"h":0,"i":2615.72,"j":264.37,"k":1183.86,"l":""}]
- 2025-03-10 21:14:22,937 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_05.png
- 2025-03-10 21:14:22,937 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 21:14:22,937 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 21:15:13,122 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-930","c":"聚丙烯网状纤维混凝土","d":"基面清理、混凝土浇筑、抹平、养护。","e":"10m³","f":"HT-0(10.200);","g":4359.49,"h":0,"i":2615.72,"j":559.91,"k":1183.86,"l":""},{"a":"QY_2024","b":"QY-931","c":"垫层 混凝土","d":"混凝土浇筑、振捣和养护。","e":"10m³","f":"HT-0(10.200);","g":621.69,"h":0,"i":601.05,"j":20.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-932","c":"垫层 水泥砂浆M10","d":"配料、拌制、抹平和养护。","e":"10m³","f":"HT-915(10.200);","g":2455.02,"h":19.725,"i":714.27,"j":1740.75,"k":0,"l":""},{"a":"QY_2024","b":"QY-933","c":"热作式伸缩缝、沉降缝 沥青麻筋 厚20","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":1844.86,"h":0,"i":155.45,"j":1689.41,"k":0,"l":""},{"a":"QY_2024","b":"QY-934","c":"热作式伸缩缝、沉降缝 沥青麻筋 厚30","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":2780.27,"h":0,"i":182.75,"j":2597.52,"k":0,"l":""}]
- 2025-03-10 21:15:13,198 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_06.png
- 2025-03-10 21:15:13,199 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 21:15:13,199 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 21:15:52,841 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-935","c":"热作式伸缩缝、沉降缝沥青麻筋厚50","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":4625.15,"h":0,"i":388.76,"j":4236.39,"k":0,"l":""},{"a":"QY_2024","b":"QY-936","c":"热作式伸缩缝、沉降缝一层油毛毡两层沥青","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":206.4,"h":0,"i":92.94,"j":113.46,"k":0,"l":""},{"a":"QY_2024","b":"QY-937","c":"热作式伸缩缝、沉降缝两层油毛毡三层沥青","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":320.37,"h":0,"i":136.95,"j":183.42,"k":0,"l":""},{"a":"QY_2024","b":"QY-938","c":"热作式伸缩缝、沉降缝三层油毛毡四层沥青","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"","g":438.77,"h":0,"i":185.13,"j":253.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-939","c":"伸缩缝、沉降缝水泥砂浆M10","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m²","f":"HT-915(3.060);","g":637.02,"h":5.919,"i":117.11,"j":519.91,"k":0,"l":""}]
- 2025-03-10 21:15:52,909 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_07.png
- 2025-03-10 21:15:52,909 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 21:15:52,909 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 21:16:17,981 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-940","c":"伸缩缝、沉降缝沥青木板","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":641.15,"h":0.16,"i":190.65,"j":450.5,"k":0,"l":""},{"a":"QY_2024","b":"QY-941","c":"伸缩缝、沉降缝黏土","d":"炼制沥青,浸制沥青麻筋,油毡剪裁,涂沥青及张贴木板制作,涂沥青及安装,嵌塞伸缩缝,制作、抹铺砂浆。","e":"10m2","f":"","g":84.37,"h":0.576,"i":76.98,"j":7.39,"k":0,"l":""},{"a":"QY_2024","b":"QY-942","c":"冷作式伸缩缝、沉降缝JS-18余料麻筋厚20","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":1779.98,"h":0.037,"i":155.45,"j":1624.53,"k":0,"l":""},{"a":"QY_2024","b":"QY-943","c":"冷作式伸缩缝、沉降缝JS-18余料麻筋厚30","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":2470.5,"h":0.038,"i":247.64,"j":2222.86,"k":0,"l":""},{"a":"QY_2024","b":"QY-944","c":"冷作式伸缩缝、沉降缝JS-18余料麻筋厚50","d":"浸制麻筋,木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":3795.29,"h":0.041,"i":388.76,"j":3406.53,"k":0,"l":""}]
- 2025-03-10 21:16:18,016 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_08.png
- 2025-03-10 21:16:18,016 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_09.png
- 2025-03-10 21:16:18,016 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_09.png
- 2025-03-10 21:17:14,409 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-945","c":"冷作式伸缩缝、沉降缝_JS-18涂料木板","d":"浸制麻筋.木板涂贴及制安,嵌塞伸缩缝。","e":"10m2","f":"","g":776.72,"h":0.176,"i":173.94,"j":602.78,"k":0,"l":""},{"a":"QY_2024","b":"QY-946","c":"干砌片石 锥体护坡","d":"选修石、安砌、填塞孔隙。","e":"10m3","f":"","g":1346.23,"h":21.06,"i":777.38,"j":568.85,"k":0,"l":""},{"a":"QY_2024","b":"QY-947","c":"干砌片石 河床护底","d":"选修石、安砌、填塞孔隙。","e":"10m3","f":"","g":1139.24,"h":21.06,"i":568.97,"j":570.27,"k":0,"l":""},{"a":"QY_2024","b":"QY-948","c":"干砌片石 河床护坡","d":"选修石、安砌、填塞孔隙。","e":"10m3","f":"","g":1168.18,"h":21.06,"i":597.91,"j":570.27,"k":0,"l":""},{"a":"QY_2024","b":"QY-949","c":"干砌片石 导流堤","d":"选修石、安砌、填塞孔隙。","e":"10m3","f":"","g":1168.18,"h":21.06,"i":597.91,"j":570.27,"k":0,"l":""}]
- 2025-03-10 21:17:14,485 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_09.png
- 2025-03-10 21:17:14,485 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 21:17:14,485 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 21:17:42,058 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-950","c":"浆砌片石 锥体护坡","d":"砂浆制作、选修洗石、抹浆安砌、填塞孔隙、整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2312.13,"h":27.442,"i":1158.08,"j":1134.91,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-951","c":"浆砌片石 河床护底","d":"砂浆制作、选修洗石、抹浆安砌、填塞孔隙、整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2207.17,"h":27.442,"i":1052.17,"j":1135.93,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-952","c":"浆砌片石 河床护坡及导流堤","d":"砂浆制作、选修洗石、抹浆安砌、填塞孔隙、整理及养护。","e":"10m³","f":"HT-915(3.300);","g":2256.63,"h":27.442,"i":1103.34,"j":1134.15,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-953","c":"M10浆砌预制块锥体护坡","d":"清理基面、脚手架搭拆、砂浆拌制、安砌、养护。","e":"10m³","f":"CL-01(9.100);HT-915(1.300);","g":1156.62,"h":2.617,"i":697.27,"j":451.86,"k":7.49,"l":"CL-01 混凝土预制件(m³)"},{"a":"QY_2024","b":"QY-954","c":"钢丝笼装片石","d":"片石选取、填装、码砌。","e":"10m³","f":"","g":1765.63,"h":18.511,"i":735.61,"j":1030.02,"k":0,"l":""}]
- 2025-03-10 21:17:42,164 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_10.png
- 2025-03-10 21:17:42,165 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 21:17:42,165 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 21:17:57,417 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-955","c":"桥头检查台阶 砂砌片石M10","d":"砂浆制作、选修洗石、抹浆安砌、填塞空隙、整理及养护。","e":"10m3","f":"HT-915(3.300);","g":2258.77,"h":27.442,"i":1101.25,"j":1138.38,"k":19.14,"l":""},{"a":"QY_2024","b":"QY-956","c":"桥头检查台阶 M10砂浆砌筑预制块","d":"清理基面,砂浆拌制、砌筑,养护。","e":"10m3","f":"CL-01(9.100);HT-915(1.300);","g":936.23,"h":2.514,"i":697.27,"j":231.47,"k":7.49,"l":"CL-01 混凝土预制件(m3)"}]
- 2025-03-10 21:17:57,446 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_11.png
- 2025-03-10 21:17:57,446 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 21:17:57,446 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 21:18:24,768 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-960","c":"浆砌片石面石加工","d":"面石表面粗凿加工,上下面及侧面局部修凿。","e":"100m2","f":"","g":3450.55,"h":0,"i":3409.96,"j":40.59,"k":0,"l":""},{"a":"QY_2024","b":"QY-961","c":"重型栓接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":4917.86,"h":1.05,"i":629.84,"j":3849.94,"k":438.08,"l":""},{"a":"QY_2024","b":"QY-962","c":"轻型栓接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":5567.06,"h":1.05,"i":1098.71,"j":3952.9,"k":515.45,"l":""},{"a":"QY_2024","b":"QY-963","c":"一般焊接结构","d":"调直整平、划线下料、钻孔、电焊、组拼。","e":"t","f":"","g":5594.41,"h":1.05,"i":954.45,"j":3983.95,"k":656.01,"l":""},{"a":"QY_2024","b":"QY-964","c":"钢结构安拆 陆上","d":"铺拆临时脚手架、杆件安装、拆除。","e":"t","f":"","g":1958.67,"h":0.273,"i":802.89,"j":1059.43,"k":96.35,"l":""}]
- 2025-03-10 21:18:24,851 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_12.png
- 2025-03-10 21:18:24,851 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 21:18:24,851 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 21:19:12,379 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-965","c":"钢结构安拆 水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":3867.72,"h":0.273,"i":1315.92,"j":1063.68,"k":1488.12,"l":""},{"a":"QY_2024","b":"QY-966","c":"万能杆件安拆 陆上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":623.54,"h":0.026,"i":462.46,"j":153.76,"k":7.32,"l":""},{"a":"QY_2024","b":"QY-967","c":"万能杆件安拆 水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":2075.68,"h":0.026,"i":605.97,"j":158.01,"k":1311.7,"l":""},{"a":"QY_2024","b":"QY-968","c":"贝雷梁安拆 陆上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":499.52,"h":0.02,"i":422.63,"j":71.46,"k":5.43,"l":""},{"a":"QY_2024","b":"QY-969","c":"贝雷梁安拆 水上","d":"铺拆临时脚手架,杆件安装、拆除。","e":"t","f":"","g":1941.02,"h":0.02,"i":553.61,"j":75.71,"k":1311.7,"l":""}]
- 2025-03-10 21:19:12,418 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_13.png
- 2025-03-10 21:19:12,418 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 21:19:12,418 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 21:19:33,490 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-970","c":"满堂式支架搭拆","d":"钢管柱及分配梁等钢结构安拆。","e":"100m3空间","f":"","g":3564.65,"h":0.429,"i":1609.95,"j":1670.13,"k":284.57,"l":""},{"a":"QY_2024","b":"QY-971","c":"辅助钢结构支架","d":"钢管柱及分配梁等钢结构安拆。","e":"10t","f":"","g":23012.26,"h":2.847,"i":10021.91,"j":10898.3,"k":2092.05,"l":""},{"a":"QY_2024","b":"QY-972","c":"堆载预压","d":"工作准备,袋装土堆载预压、卸载。","e":"100t","f":"","g":2569.9,"h":0,"i":279.26,"j":1337,"k":953.64,"l":""},{"a":"QY_2024","b":"QY-973","c":"钢塔架安拆","d":"塔架新制杆件制安拆。","e":"t","f":"","g":2849.56,"h":0.194,"i":1427.95,"j":869.36,"k":532.25,"l":""},{"a":"QY_2024","b":"QY-974","c":"地锚混凝土","d":"挖基、混凝土浇筑、振捣及养护。","e":"10m3","f":"HT-0(10.200);","g":821.09,"h":0,"i":685.18,"j":121.19,"k":14.72,"l":""}]
- 2025-03-10 21:19:33,564 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_14.png
- 2025-03-10 21:19:33,564 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 21:19:33,564 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 21:19:55,994 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-975","c":"地锚钢结构安拆","d":"钢结构制安拆。","e":"t","f":"","g":4087.51,"h":0.376,"i":1751.67,"j":1628.61,"k":707.23,"l":""},{"a":"QY_2024","b":"QY-976","c":"索鞍安拆","d":"安拆。","e":"t","f":"","g":4930.3,"h":0.35,"i":1100.2,"j":1349.28,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-977","c":"主缆安拆","d":"安拆。","e":"t","f":"HT-0(10.200);","g":6790.17,"h":0,"i":1136.3,"j":3173.05,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-978","c":"牵引索起重索安拆","d":"结构安拆。","e":"t","f":"","g":6731.7,"h":0,"i":1077.83,"j":3173.05,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-979","c":"缆风索安拆","d":"结构安拆。","e":"t","f":"","g":6717.23,"h":0,"i":1063.36,"j":3173.05,"k":2480.82,"l":""}]
- 2025-03-10 21:19:56,057 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_15.png
- 2025-03-10 21:19:56,057 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 21:19:56,057 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 21:20:30,486 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-980","c":"后塔架锚绳钢绞线安装","d":"结构安拆。","e":"t","f":"","g":6761.38,"h":0,"i":1107.51,"j":3173.05,"k":2480.82,"l":""},{"a":"QY_2024","b":"QY-981","c":"水深≤10m 桩桥(宽4m)","d":"钢管桩制作、插打、桩间连接系、分配梁、桥面板及栏杆等钢结构制安拆,主桁及连接系军用梁构架安拆。","e":"延长米","f":"","g":8611.09,"h":1.114,"i":2835.32,"j":4770.80,"k":1004.88,"l":""},{"a":"QY_2024","b":"QY-982","c":"水深≤10m 宽度每增加1m","d":"钢管桩制作、插打、桩间连接系、分配梁、桥面板及栏杆等钢结构制安拆,主桁及连接系军用梁构架安拆。","e":"延长米","f":"","g":1649.33,"h":0.157,"i":709.35,"j":756.36,"k":183.62,"l":""},{"a":"QY_2024","b":"QY-983","c":"航标灯支架制安","d":"钢构件调整整平、划线、下料、钻孔、电焊、组拼、杆件安装、油漆。","e":"一个墩","f":"","g":5034.37,"h":0.712,"i":1675.44,"j":3038.95,"k":319.98,"l":""},{"a":"QY_2024","b":"QY-984","c":"钢结构限高防撞架","d":"钢结构制作、安装、油漆。","e":"t","f":"","g":8360.08,"h":0.966,"i":2385.98,"j":5137.54,"k":836.56,"l":""}]
- 2025-03-10 21:20:30,565 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_16.png
- 2025-03-10 21:20:30,565 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 21:20:30,565 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 21:21:24,277 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-985","c":"水上航标牌制安","d":"调直整平、划线下料、电焊、组拼、安装,油漆。","e":"处","f":"","g":1503.54,"h":0.239,"i":395.18,"j":1003.8,"k":104.56,"l":""},{"a":"QY_2024","b":"QY-986","c":"陆上人力拆除混凝土","d":"气镐开凿、清理等。","e":"10m3","f":"","g":1405.7,"h":0,"i":1215.52,"j":35.45,"k":154.73,"l":""},{"a":"QY_2024","b":"QY-987","c":"陆上人力拆除钢筋混凝土","d":"气镐开凿、清理等。","e":"10m3","f":"","g":1720.63,"h":0,"i":1458.53,"j":46.08,"k":216.02,"l":""},{"a":"QY_2024","b":"QY-988","c":"陆上爆破拆除混凝土","d":"人力开眼、爆破、清理。","e":"10m3","f":"","g":1910.57,"h":0.006,"i":1464.8,"j":445.77,"k":0,"l":""},{"a":"QY_2024","b":"QY-989","c":"陆上爆破拆除钢筋混凝土","d":"人力开眼、爆破、清理。","e":"10m3","f":"","g":2314.75,"h":0.007,"i":1714.23,"j":585.62,"k":14.9,"l":""}]
- 2025-03-10 21:21:24,379 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_17.png
- 2025-03-10 21:21:24,380 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 21:21:24,380 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 21:21:57,244 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-990","c":"陆上 机械拆除混凝土","d":"机械就位、凿除、清理、堆放。","e":"10m3","f":"","g":880.11,"h":0,"i":124.71,"j":0,"k":755.4,"l":""},{"a":"QY_2024","b":"QY-991","c":"陆上 机械拆除钢筋混凝土","d":"机械就位、凿除、清理、堆放。","e":"10m3","f":"","g":1220.98,"h":0,"i":373.99,"j":0,"k":846.99,"l":""},{"a":"QY_2024","b":"QY-992","c":"水上 人力拆除混凝土","d":"气镐开凿、清理等。","e":"10m3","f":"","g":1685.17,"h":0,"i":1458.53,"j":40.77,"k":185.87,"l":""},{"a":"QY_2024","b":"QY-993","c":"水上 人力拆除钢筋混凝土","d":"气镐开凿、清理等。","e":"10m3","f":"","g":2020.52,"h":0,"i":1707.81,"j":53.03,"k":259.68,"l":""},{"a":"QY_2024","b":"QY-994","c":"水上 爆破拆除混凝土","d":"人力开眼、爆破、清理。","e":"10m3","f":"","g":2190.33,"h":0.006,"i":1707.81,"j":482.52,"k":0,"l":""}]
- 2025-03-10 21:21:57,329 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_18.png
- 2025-03-10 21:21:57,330 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_19.png
- 2025-03-10 21:21:57,330 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_19.png
- 2025-03-10 21:22:15,912 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-995","c":"水上爆破拆除钢筋混凝土","d":"人力开眼、爆破、清理。","e":"10m3","f":"","g":2688.9,"h":0.012,"i":1957.24,"j":713.63,"k":18.03,"l":""},{"a":"QY_2024","b":"QY-996","c":"混凝土凿毛平面","d":"凿毛。","e":"10m2","f":"","g":100.37,"h":0,"i":100.25,"j":0.12,"k":0,"l":""},{"a":"QY_2024","b":"QY-997","c":"混凝土凿毛立面","d":"凿毛。","e":"10m2","f":"","g":150.99,"h":0,"i":150.82,"j":0.17,"k":0,"l":""},{"a":"QY_2024","b":"QY-998","c":"人力拆除干砌片石陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":206.59,"h":0,"i":205.12,"j":1.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-999","c":"人力拆除干砌片石水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":258.61,"h":0,"i":257.34,"j":1.47,"k":0,"l":""}]
- 2025-03-10 21:22:16,002 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_19.png
- 2025-03-10 21:22:16,002 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 21:22:16,002 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 21:22:57,463 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1000","c":"人力拆除浆砌片石 陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":438.85,"h":0,"i":436.65,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1001","c":"人力拆除浆砌片石 水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":547.9,"h":0,"i":545.7,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1002","c":"人力拆除浆砌料石 陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":757.95,"h":0,"i":755.75,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1003","c":"人力拆除浆砌石 水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":946.21,"h":0,"i":944.01,"j":2.2,"k":0,"l":""},{"a":"QY_2024","b":"QY-1004","c":"人力拆除石笼 陆上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":229.86,"h":0,"i":228.39,"j":1.47,"k":0,"l":""}]
- 2025-03-10 21:22:57,531 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_20.png
- 2025-03-10 21:22:57,531 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 21:22:57,531 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 21:23:29,414 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1005","c":"人力拆除石笼 水上","d":"凿眼、撬动、运出、清理、堆放、搭拆跳板。","e":"10m3","f":"","g":287.6,"h":0,"i":286.13,"j":1.47,"k":0,"l":""},{"a":"QY_2024","b":"QY-1006","c":"爆破拆除浆砌石 陆上","d":"人力凿眼、装药、爆破、清理、堆放搭拆跳板。","e":"10m3","f":"","g":640.28,"h":0.004,"i":381.45,"j":258.83,"k":0,"l":""},{"a":"QY_2024","b":"QY-1007","c":"爆破拆除浆砌石 水上","d":"人力凿眼、装药、爆破、清理、堆放搭拆跳板。","e":"10m3","f":"","g":757.42,"h":0.005,"i":476.78,"j":280.64,"k":0,"l":""},{"a":"QY_2024","b":"QY-1008","c":"机械拆除浆砌石挡","d":"机械就位、凿除、清理、堆放。","e":"10m3","f":"","g":314.16,"h":0,"i":62.36,"j":0,"k":251.8,"l":""},{"a":"QY_2024","b":"QY-1009","c":"架桥机拆除上承板梁 跨度(m)8~16","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":2834.45,"h":0.026,"i":790.36,"j":52.81,"k":1991.26,"l":""}]
- 2025-03-10 21:23:29,517 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_21.png
- 2025-03-10 21:23:29,518 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 21:23:29,518 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 21:24:02,849 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1010","c":"架桥机拆除上承板梁 跨度(m) 20~24","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":3625.23,"h":0.058,"i":1212.98,"j":109.09,"k":2303.16,"l":""},{"a":"QY_2024","b":"QY-1011","c":"架桥机拆除上承板梁 跨度(m) 28~32","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":5604.04,"h":0.094,"i":1768.98,"j":176.39,"k":3658.67,"l":""},{"a":"QY_2024","b":"QY-1012","c":"架桥机拆除下承板梁 跨度(m) 16","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":5002.41,"h":0.047,"i":1020.24,"j":88.29,"k":3893.88,"l":""},{"a":"QY_2024","b":"QY-1013","c":"架桥机拆除下承板梁 跨度(m) 20","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":6024.25,"h":0.062,"i":1529.84,"j":117.66,"k":4376.75,"l":""},{"a":"QY_2024","b":"QY-1014","c":"架桥机拆除下承板梁 跨度(m) 24","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":6390.55,"h":0.076,"i":1821.64,"j":147.03,"k":4421.88,"l":""}]
- 2025-03-10 21:24:02,930 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_22.png
- 2025-03-10 21:24:02,930 - INFO - 开始处理图片: ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 21:24:02,930 - INFO - 调用AI API IMAGE==> Url:https://dashscope.aliyuncs.com/compatible-mode/v1,Model:qwen2.5-vl-72b-instruct ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 21:24:23,823 - INFO - 开始保存图片内到数据库:[{"a":"QY_2024","b":"QY-1015","c":"架桥机拆除下承板梁 跨度(m)28","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":6728.02,"h":0.109,"i":2039.44,"j":205.76,"k":4482.82,"l":""},{"a":"QY_2024","b":"QY-1016","c":"架桥机拆除下承板梁 跨度(m)32","d":"拆除支座锚栓,捆梁吊起吊运至桥头,落梁横移路基一侧。","e":"孔","f":"","g":7354.93,"h":0.133,"i":2258.29,"j":249.81,"k":4846.83,"l":""}]
- 2025-03-10 21:24:23,850 - INFO - 图片处理完成: ./temp_files/images/output/img/06/part_23.png
- 2025-03-10 21:24:23,850 - INFO - 目录处理完成: ./temp_files/images/output/img/06/
- 进程已结束,退出代码为 0
|